• Cup-lock Scaffolding for High-rise Building, Cost-effective Application System 1
  • Cup-lock Scaffolding for High-rise Building, Cost-effective Application System 2
  • Cup-lock Scaffolding for High-rise Building, Cost-effective Application System 3
Cup-lock Scaffolding for High-rise Building, Cost-effective Application

Cup-lock Scaffolding for High-rise Building, Cost-effective Application

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

1. Main Intriduction of Cup-lock Scaffolding:

 

  • Name: Cup Lock Scaffolding

  • Size: as your requirement

  • Surface:  Electro Galvanized/Self Color/Painted/HDG

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

2. The Advantages of Cup-lock Scaffolding:

  • Adaptable to various construction projects.

  • All elements safely connected

  • Highly durable

     

3. Images for Cup-lock Scaffolding:

 

Cup-lock Scaffolding for High-rise Building, Cost-effective Application

 

Cup-lock Scaffolding for High-rise Building, Cost-effective Application

Cup-lock Scaffolding for High-rise Building, Cost-effective Application

 

 4. FAQ

 

  • 1) What can we do for you? 

  •     .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

  •     .We can provide you the professional technical team.    

  •     .We can provide professional building proposal for your project.       

  •     . Please feel free to customize.  

  •  

  • 2) What promises can be done by us?

  •    . If interested in this kind of formwork, please feel free to write us for any QUOTE.

  •    . If need any technical and building assistance, we could provide on-site professional staff for instruction.

  •    . Please DO check goods when courier knocks your door and contact us asap if any issueS.

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.


Q: What is the significance of the scaffold in the novel 'The Scarlet Letter' (Hawthorne)?
It has dramatic importance because key events happen there. Further, at the scaffold is where much hypocrisy gets played out. From Shmoop
Q: I got my industrial pierced on august 17th of this year. About 2 weeks ago this little bump formed on the outside of the bottom hole...i was wondering if i took it out to get it cleaned really good since its kinda hard to fully clean it would that affect it in any negative way? Its only been a month so im a little apprehensive about taking it out but it would only be for a couple minutes...please help!!!!!!!!!!
the bump on the out side is only because when the needle went thru it was pusshing cartlidge or bone out. kindaof bending it. aventually. after a acouple mounth the bump will settle down and go away, just clean the hole twice a day and keep ur hand and hair off of it so that it can heal as quickly as possible without infection =) hope that helps
Q: Should I ask for them one at a time?Or both together on my 16th birthday? - it's in October...
if it were me i would ask for one at a time, as the healing process is a b*tch! and i would go for the tragus first, as it is easier to heal and heals faster, so it will be a faster process :)
Q: Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
The vertical distance of the vertical pole is 3 times larger than that of the wall
Q: All i can find is full time positions but none for turnarounds
Assuming you mean fling and that you only want to fling them virtually you could use Java.
Q: What person or place to scaffold?
For a long time, due to the erection of the tool itself and its construction technology and the use of safety management in a relatively backward state, resulting in a higher incidence of accidents. Statistics on the surface: in China's construction system every year, the number of casualties occurred, about 1/3 directly or indirectly with the erection tools and the use of related issues
Q: Bowl buckle scaffold can be used on any ground
Look at the situation, the ground is uneven, need to take some special way to do some processing
Q: THE SCARLET LETTER
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.
Q: What is the previous version of the scaffold fastener (JGJ166-2008) for construction? That is, the implementation of the current version of JGJ166-2008 will soon be replaced by 2009.7.1 version.
JGJ130-2001 is the construction of steel tubular scaffold safety technical specifications in the second half of the new version JGJ130-20112011 December 1st implementation
Q: Standard Specification for steel tubes for ladder type scaffolding
1, multi function: the construction according to the specific requirements of different groups composed of frame sizes, shapes and bearing capacity of single and double row scaffolding, supporting frame, support columns, material lifting frame, climbing scaffolding, cantilever frame construction equipment and other function. Can also be used to set up construction shed, shed, lighthouse and other structures. The utility model is especially suitable for building curved surfaces and heavy load support frames.2, high efficiency: commonly used rod in the longest 3130mm, weight 17.07kg. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation.3, versatility: the main components are the use of ordinary fastener type steel pipe scaffolding, can be used with ordinary steel pipe connection, universal.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches