Cup Locked Scaffolding of Easy and Quick Erection
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffolding
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
.Not easy to lose fastener, portable firm and easy to maintain and transport
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar
.5 times fast of adapter plug assembly and disassembly than normal
.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage
5. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:why the scaffold nned to be inspected within the preceding seven(7) days?
- To make sure that it is constructed properly and things haven';t slipped out
- Q:Bowl buckle scaffold can be used to support it
- Need to take some special way to do some processing
- Q:is both 1 m farm from the scaffold. if the boeard is 20 kg in mass, how close to the end can the painter stand w/out tipping the board over?
- good one babe. Heres yet another for ya An airline captain became breaking in an extremely extraordinarily new blonde stewardess. The path they have been flying had a stay-over in yet another city. Upon their arrival the captain confirmed the stewardess the ultimate place for airline workers to consume, save and stay in a single day. the subsequent morning because of the fact the pilot became preparing the group for the day's path, he observed the hot stewardess became lacking. He knew which room she became in on the hotel and called her up thinking what occurred to her. She replied the telephone, crying, and stated she could no longer get out of her room. you may no longer get out of your room? the captain asked, Why no longer? The stewardess replied, There are in uncomplicated terms 3 doorways in right here, she sobbed, one is the bathing room, one is the closet, and one has a demonstration on it that pronounces 'do no longer Disturb'!
- Q:does it hurt more than just getting your lobes pierced or the same?i just got a my ears pierced (so now i have two lobe piercing on each ear) it didn't hurt.i'm not sure if i should get it or not.
- It is one of the more painful ear cartilage piercings and, as such, hurts more than getting your lobes pierced. It's also much more difficult to take care of. BTW: I love your Andy Warhol avatar. He's my favorite artist.
- Q:Hey so I've had my scaffold piercing a day and its bleeding a lot when I woke up this morning, there was even like jelly blood clots, its really painful and super itchy, I know I've only had it a day but I'm a little worried, any advice ? Thanks :)
- its normal aii your probaly slept on it just do a sea salt soak and you'll be fine but if your super worried go back to your piercer
- Q:I got my industrial pierced on august 17th of this year. About 2 weeks ago this little bump formed on the outside of the bottom hole...i was wondering if i took it out to get it cleaned really good since its kinda hard to fully clean it would that affect it in any negative way? Its only been a month so im a little apprehensive about taking it out but it would only be for a couple minutes...please help!!!!!!!!!!
- the bump on the out side is only because when the needle went thru it was pusshing cartlidge or bone out. kindaof bending it. aventually. after a acouple mounth the bump will settle down and go away, just clean the hole twice a day and keep ur hand and hair off of it so that it can heal as quickly as possible without infection =) hope that helps
- Q:I just got my scaffold piercing done today and everything went well. I was just wondering how long the healing process would take? Does it vary with different people? And is using sea-salt and warm water the best way to clean it?Cheers x
- Congrats on the new holes. I found with my industrial healed very fast (4-5 weeks). The sea salt and water works but I would recommend JJ antiseptic wash. Its pain free and has a little better germ killing ability. Also try not to sleep on that side for a while because sometimes the pressure will impede the healing. Good Luck.
- Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
- Do not know if there is no other norms on the bowl, it is this.The values of the carrying capacity are like those provided by the manufacturer.
- Q:Bowl buckle scaffold construction needs to pay attention to what problems
- Between the outer edge of the scaffold and the overhead line must be kept safe operating distance, to maintain not less than 4.5m, or the need to add additional barrier protection measures. ?Lightning protection set by 12 round steel and building lightning protection column and reliable welding, weld length not less than 6D, the grounding resistance shall not more than 30. The lightning protection of the scaffold is closed to the ring welding set, and the four angle is connected with the rib.
- Q:ok so i recently got a scaffold piercing and its not completely healed i have gym tomorrow and my gym teacher makes us take out our earrings i know he is gonna make me take out my scaffold bar but i cant its not healed or he will make me sit out until its healed i herd that it takes 1 year before it heals i cant miss gym the whole year! what should i do HELP PLEASEyours trulySelyGomy
- well i would cover it up if i were you.....leave ure hair down or something to make it less nnoticable
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup Locked Scaffolding of Easy and Quick Erection
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches