• High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD System 1
  • High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD System 2
High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD

High Medium Voltage Drive 6KV 1400KW RMVC4000-A060/1800 VFD

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Energy-saving Solutions for Enterprise
1
Program Overview
Saving energy achieves 10% -70%
The enterprises do not need to pay for expense of equipment manufacture and installation.
Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)
Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1
)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility
2
)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3
)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4
)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5
)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2
Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3
Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Q: Laptop adapter
The interface of the second adapter is the same as the first one And although the two numbers are not the same but the number of V on the line is the same as the interface
Q: My Lenovo v450 laptop power adapter should be bad how to match?
In order to ensure quality, we recommend that you buy genuine, you can contact the service station to buy engineers
Q: The relationship between the power supply of the notebook and the battery
2, when the laptop turns on the power adapter, and the battery power is low, the charging circuit detects the battery power is lower than the set value, the power adapter will side of the host power supply, while the battery charge. After the charge is restored, it is restored to the power supply state directly from the adapter. Therefore, the relationship between the power supply of the notebook and the battery is that the battery is charged by the power adapter when the battery level is below the set value.
Q: ASUS notebook power adapter can be universal? is it?
Dear ASUS users, you may wish to refer to the following information: 1, you can use the same power ASUS adapter, is common; 2, the adapter recommended to the service center to buy original adapter, you can ensure the stability of power supply, the machine is not damaged;
Q: Can the laptop 1.3a power adapter be used on a 1.5a device?
Absolutely can not try 1.5a! If you want your laptop to go wrong, then use it!
Q: Will the asynchronous motor pole change the number of speed control can also be combined with the frequency converter
As you said the asynchronous motor after a very logarithmic change can be achieved on the speed of the "coarse tune", and then use the inverter is equivalent to add a "fine tune" device, but it seems a bit expensive, but to To see what you are on the occasion of the worthless.
Q: The notebook power adapter flashes
1: Check the socket with a multimeter is normal, the supply voltage is 220V. If the utility voltage is not normal, it is recommended to replace the use of environmental testing. 2: Check with the multimeter whether the output voltage and current of the power adapter match the label. If the gap is very large, and the mains voltage is normal, you can determine the power adapter failure, need to replace the laptop power adapter. 3: If the above check is normal, remove the laptop battery, do not external adapter. Press and hold the notebook power button 5 seconds to repeat 3 times. After releasing the notebook residual charge, insert the power adapter separately, power on the test. 4: If the fault persists, check the notebook's power connector, whether the exception. Such as loose or the appearance of damage and so on. 5: the above checks are normal, basically can be a preliminary judgment is the notebook motherboard failure. Recommended repair service station.
Q: 22kw.2 pole fan can use Fuji inverter?
according to the rated name of the fan brand and the inverter rated current control, select the current value match, or slightly larger The
Q: Three-phase two-pole motor can be used to reduce the frequency of the inverter
Speed range adjustable, you can drop to any speed you want!
Q: 400w 6-pole motor should be equipped with much of the inverter?
0.75KW just fine, neither waste the inverter resources, but also to meet the occasional overload. And 0.75KW inverter is the standard model.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords