HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--019
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What are the aspects of the risk of real estate investment and development?
- Real estate investment development is a dynamic process, both the benefits and risks exist. As the real estate has the location of the fixed and immutable, large investment
- Q: Real estate business, when to carry forward the cost?
- For real estate companies, carry forward costs is its most important step. Only carry forward the cost, in order to know how much real estate projects to achieve income, and how much profit
- Q: What is the land deed tax rate for real estate?
- the transfer of state-owned land use right, the transfer of land use rights, including the sale
- Q: What is the real estate industry?
- the real estate regulation and management, that is, the establishment of real estate capital market, technology market, labor market
- Q: What is the real estate level market secondary market three market
- The real estate first-level market, also known as the land first-level market, is the land use right to sell the market
- Q: What is the real estate development prospects now?
- so that supply is greater than demand, but in the medium and long term, the supply is still tight.
- Q: What are the real estate management professions?
- the professional training of moral, intellectual, physical and aesthetic development
- Q: When China introduct the real estate?
- from the beginning of 99 the real estate market into a new stage of market-oriented.
- Q: What is the trend of real estate now?
- China's housing market has entered the adjustment period, but will not collapse. The reason is as follows
- Q: What kind of factors in our housing market?
- thus promoting the development of the real estate industry. This factor can be seen from the history of population development and housing history
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--019
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches