HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--022
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What conditions should a real estate agent have?
- especially just out of the school to work on the young people should have the ability
- Q: Real estate, people often say 'case' is what it means
- Such as the case of sales salesman is known as the new sales of commercial housing sales office or sales lady.
- Q: What is the real estate industry?
- the real estate regulation and management, that is, the establishment of real estate capital market, technology market, labor market
- Q: What is the impact of the economic environment on real estate?
- The economic cycle determines the effective demand for real estate. The effective demand of the real estate market is limited by the actual purchasing power of the consumers
- Q: The future of real estate?
- 5 million 36 million sets of affordable housing construction (More than 12 trillion yuan of investment
- Q: What is the real estate development prospects now?
- so that supply is greater than demand, but in the medium and long term, the supply is still tight.
- Q: Real estate in the "five card" which five?
- Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
- Q: How is China's housing market trend ?
- the behavior of real estate development companies will gradually regulate the various intermediary organizations will gradually develop
- Q: How is the real estate sales invoice open?
- The paper format of the invoice is the same, but the distinction between pre-payment and settlement of the two cases
- Q: What are the categories of real estate?
- As the real estate is composed of land and ground buildings, structures, for land and housing can be classified according to the following methods:
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--022
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches