• Prefabricated Steel Structure Industrial Buildings System 1
  • Prefabricated Steel Structure Industrial Buildings System 2
Prefabricated Steel Structure Industrial Buildings

Prefabricated Steel Structure Industrial Buildings

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
5000 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Prefabricated Steel Structure Industrial Buildings

 

1.Structure of Prefabricated Steel Structure Industrial Buildings 

 

Prefabricated Steel Structure industrial building is one kinds of the normal industrial building nowadays, which is more and more popular in the industry area. Its components are manufactured by steel material in the factory and prefabricated before entering the site, so the installation is very fast and easy.


2.Main Features of Prefabricated Steel Structure Industrial Buildings 

•Easy Elevation

•Shorter Construction Period
•Safer to Build

•Cost is Lower

•Envirommental

•Stronger especially on resist the earthquake

 

3. Prefabricated Steel Structure Industrial Buildings Images



 


Prefabricated Steel Structure Industrial Buildings

Prefabricated Steel Structure Industrial Buildings


 

4. Prefabricated Steel Structure Industrial Buildings Specification

Design&Engineering Service, Steel Building,Space Frames, Portable Cabins, Tubular Steel Structures,basic building elements(built-up welded H-section , hot-rolled H-section, channel, steel column, steel beam),standard frames, secondary framing, roof & wall materials, Tempcon (sandwich) panels

--------------------------------------------------------------------------------------------------------

Project Scope:

industrial plant/workshop/warehouse/factores, airport terminal, highrise building, bridge, commercial center,  exhibition hall, stadium and the like

--------------------------------------------------------------------------------------------------------

Certificate:

 ISO9001:2000 ; ISO14001:2004 and OHSAS18000

--------------------------------------------------------------------------------------------------------

Engineering Design Software:

AutoCAD,PKPM,MTS,3D3S, Tarch, Tekla Structures(Xsteel)V12.0.etc

 ------------------------------------------------------------------------------------------------------

5.FAQ of Prefabricated Steel Structure Industri al Buildings 

 

We have organized several common questions for our clients,may help you sincerely: 

 

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customer’s requirements.

 

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

 

③What projects have you finished?

The following is the oversea projects we undertook in the last few years.

 

1/ Yemen /

Heavy-duty plant for Forshan Company(28m high), Aden Port, The Republic of Yemen / 3200T      

2/ Singapore /

One-North campus& alumni clubhouse of Nanyang Technological University(50m span truss structure) // 2860T           

3/ Singapore /

Steel structure Project for  Building of Changi Airport Budget Terminal,Singapore     // 1200T      

4/ Qatar /

Office Building Hleytan Tower In Doha,Qatar(65.40m) // 2500T/15440m2      

5/ Russia/   

Commercial Building for Khabarovsk , Russia(6 stores upper ground,1 store underground)    // 2182T   

6/U.A.E/     

UAE Industrial Plant for AL Salam Industrial EST,Saudi Arabia   2500T/38000m2  U.A.E ,2006

7/Malaysia/   

Bakun Hydropower Project in Malaysia   //1046T          

8/Argentina/      

Steel Structure Warehouse for Creativ SRL,Argentina 3650m2   

9/Russia/    

Commercial Building for Khabarovsk,Phase 2 , Russia(6 stores upper ground,1 store underground)    2000T c.a.        

10/Ecuador/  

Plant system for Oriental Group,Ecuador      //600T   Ecuador   

11/Madagascar/  

Small Movable house for the Gov. of Madagascar       1000 Units    Madagascar 

12/Australia/  

Australia Royal Park Industrial Building&Golden Coast Residential Building  340T      Adelaide,Australia      

13/Romania/  

Romania 80000T Ethanol Factory Project     550T      Romania      

14/Angola/  

Angola Industrial Building System    3000m2 Rocha Pinto,Luanda

15/Sudan/  

Steel Structure Sub-contracting Work for North Power Station of Sudan National Electronical Corp.  2200T, 2007,Khartoum,Sudan

16/Angola/ 

Steel Structure Warehouse(10 units) for Bricoma Super Market, Luanda,Angola, 7500m2,2007

17/Russia/ 

Steel Structure Supermarket(2 storeys),  Khabarovsk,Russia, 450T

18/UAE/ Steel Structure Industrial Workshop( 8 units of plant), Abu Dhabi, UAE,  410T 

19/France/   

Chongqing Nanshan Botanic Garden Steel Structure Conservatory invested by Richel Serres De France


Q: When is the introduction of real estate?
China 's real estate market is introduced from the eighties
Q: What conditions should a real estate agent have?
If so, we all go when the real estate agent is good. You can often imagine their own excellent performance
Q: Real estate business, when to carry forward the cost?
How to distribute profits. The real estate costs carry forward, because it involves real estate sales contracts, subscription agreements, sales lists, construction contracts
Q: What is the land deed tax rate for real estate?
the transfer of state-owned land use right, the transfer of land use rights, including the sale
Q: What is the gross margin of the real estate industry?
but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
Q: What is the impact of the economic environment on real estate?
From the demand and transactions, it is expected that some of the second-tier cities in 2010 is expected to rise in house prices and the impact of insufficient supply will decline
Q: The future of real estate?
5 million 36 million sets of affordable housing construction (More than 12 trillion yuan of investment
Q: What is the relationship between interest rates and the real estate market?
the level of interest rates directly affect the cost of real estate development and profits
Q: What is the real estate bubble economy?
CHARLES P KINDLEBERGER wrote in the "bubble" entry for the "New Palgrave Economics Dictionary" that "bubbles can be less strictly defined as:
Q: What kind of factors in our housing market?
And the beginning of this century, China's baby birth is still running high, it is expected that by 2030

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords