HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: China's real estate market began to develop rapidly is what year
- 1991 to 1995 irrational speculation and adjustment stage, Deng Xiaoping Southern speculation after the southern real estate speculation prevailed, the final hard landing, real estate into a downturn
- Q: What is the real estate industry?
- Real estate is engaged in land and real estate development, management, management and service industries
- Q: What is the red line in the real estate project?
- Real estate often said that the "red line" is the land for its development and use of the land range (land acquisition within the scope of the land, such as green space, planning road land)
- Q: What is the gross margin of the real estate industry?
- but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
- Q: Real estate in the "five card" which five?
- Construction permit; "commercial housing pre - sale permit".
- Q: How is China's housing market in other aspects of the trend ?
- China's other aspects of the real estate market in the future the following changes will occur:
- Q: How is China's housing market trend ?
- the behavior of real estate development companies will gradually regulate the various intermediary organizations will gradually develop
- Q: Kentucky is selling real estate how to understand?
- because he knows the property and location will be the success of each branch of the most important Factor
- Q: According to the use of housing classification?
- 1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
- Q: What kind of factors in our housing market?
- thus promoting the development of the real estate industry. This factor can be seen from the history of population development and housing history
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches