• HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010 System 1
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010 System 2
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010 System 3
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010 System 4
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010

HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--010

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Q: What are the aspects of the risk of real estate investment and development?
long construction period, the impact of factors such as diversity, making real estate development and investment activities are facing many risks
Q: What is the real estate level market secondary market three market
The transfer of land, can be a habitat, it can be developed through the "seven links and one leveling" of the cooked land
Q: What is the impact of the economic environment on real estate?
The sales of the houses depend on the purchasing power of the consumers
Q: What does real estate mean?
Real estate because of its own characteristics that the location of the fixed and immutable, also known as real estate.
Q: Real estate in the "five card" which five?
Construction project planning permit" is the construction project in line with the requirements of urban planning legal evidence;
Q: How is China's housing market in other aspects ?
the degree of supply and demand matching will be improved.the market order will gradually improve.
Q: How is China's housing market in other aspects of the trend ?
China's other aspects of the real estate market in the future the following changes will occur:
Q: According to the use of housing classification?
5, hotels 6, sports and entertainment facilities 7, government and public facilities 8, multi-purpose buildings (integrated buildings).
Q: What is the main property sales?
Single-handedly for a real estate such sales, the scope is not very wide, often finished a real estate will be assigned to another real estate
Q: What kind of factors in our housing market?
China's 20th century, 80,90 baby boom in the beginning of this century began to work

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches