• HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023 System 1
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023 System 2
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023 System 3
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023 System 4
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023 System 5
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023

HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--023

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 m³
Supply Capability:
500000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Q:What is the gross margin of the real estate industry?
Real estate development profits generally 20% -40%, how much less, mainly to see how to control costs
Q:What is the real estate level market secondary market three market
that is, the state through its designated government departments will be urban state-owned land or rural collective land requisition for state-owned land to sell to the user's market
Q:According to the use of housing classification?
1, residential 2, industrial plants and warehouses 3, shopping malls and shops 4, office buildings
Q:How is China's housing market in other aspects of the trend ?
China's other aspects of the real estate market in the future the following changes will occur:
Q:What is the trend of real estate now?
China's housing market has entered the adjustment period, but will not collapse. The reason is as follows
Q:Kentucky is selling real estate how to understand?
because he knows the property and location will be the success of each branch of the most important Factor
Q:Real estate in the "five card" which five?
Construction land planning permit" is the construction unit in the land management department to apply for the acquisition,
Q:How is China's housing market trend ?
grow and mature, their behavior will be standardized; related system construction will gradually be improved.
Q:How can we do real estate?
So to become a top sales staff, we must first learn how to maintain a positive attitude
Q:What is the main property sales?
new homes and old houses, commercial housing, fund - raising room to do, the scope to be bigger, a region of all houses have the opportunity to do

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches