HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--014
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. DESIGN DRAWINGS
The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.
If you don’t have design plan, we can achieve it for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.
2. What we need to do the design?
(1). Project Information, usage, construction area, height, how many storeys
(2). Weather report and geological for the location district
3. Production process:
(1). Confirm design plan.
(2). Building the mould to confirm the design is correct.
(3). Mass production, packing and transportation.
(4). Installation
(5). After sale service.
4. Packing choice:
(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production
(2).Bulk packing. This packing is designed for heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.
5. Shipment choice
(1). Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel is less than 3000 tons.
(2). Bulk cargo ship
If the total weight of steel structure is more than 3000 tons, we can choose bulk cargo shipment. This choice is cost less and save time.
6. Installation choice:
(1). We send our engineer to guide the overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.
(2). We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.
- Q: What are the aspects of the risk of real estate investment and development?
- long construction period, the impact of factors such as diversity, making real estate development and investment activities are facing many risks
- Q: What is the land deed tax rate for real estate?
- the transfer of state-owned land use right, the transfer of land use rights, including the sale
- Q: The future of real estate?
- nterest rate plus reserve ratio, the country eight, the purchase order, 10 million resettlement room hard targets
- Q: How is China's housing market in other aspects ?
- the degree of supply and demand matching will be improved.the market order will gradually improve.
- Q: How is China's housing market in other aspects of the trend ?
- the future price of the housing market in our country will gradually become reasonable and the house price income will be higher than that of entering into a maintainable space.
- Q: How is China's housing market trend ?
- grow and mature, their behavior will be standardized; related system construction will gradually be improved.
- Q: What is the difference between a real estate model and a real estate sand table?
- Sandbox generally refers to the whole project of the three-dimensional model, including the project week traffic, environmental and other regional location information
- Q: Determine what long-term factors in our housing market?
- First, the population factor. That is, with the increase in population, the demand for housing will increase
- Q: What is the relationship between interest rates and the real estate market?
- the level of interest rates directly affect the cost of real estate development and profits
- Q: How is the real estate sales invoice open?
- the first payment, the mortgage to open the invoice, pay the time to open the invoice
Send your message to us
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--014
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 3000 m³
- Supply Capability:
- 500000 m³/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches