• HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006 System 1
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006 System 2
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006 System 3
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006 System 4
  • HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006 System 5
HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006

HEAVY STEEL STRUCTURE BUILDING AND PROJECT --HC- 006

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
50000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1).     Project Information, usage, construction area, height, how many storeys

(2).      Weather report and geological for the location district

3.     Production process:

(1).     Confirm design plan.

(2).      Building the mould to confirm the design is correct.

(3).     Mass production, packing and transportation.

(4).     Installation

(5).      After sale service.

 

4. Packing choice:

 

(1). We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 (2).Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

(1).     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

(2). Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 (1).     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

(2).     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

 

Q: What conditions should a real estate agent have?
past happy things, friends and family expectations
Q: What is the red line in the real estate project?
Real estate often said that the "red line" is the land for its development and use of the land range (land acquisition within the scope of the land, such as green space, planning road land)
Q: What is the gross margin of the real estate industry?
but now the development of profits began to fall, prices have risen, but the price is too high and difficult to sell
Q: What is the real estate level market secondary market three market
that is, the state through its designated government departments will be urban state-owned land or rural collective land requisition for state-owned land to sell to the user's market
Q: What does real estate mean?
Real estate refers to the land, buildings and fixed in the land, the building can not be separated from the part and its accompanying benefits.
Q: What are the real estate management professions?
Real estate management professional, that is, real estate management and management professional
Q: What is the difference between land valuation and real estate valuation?
Land valuation is based on the principles, theories and methods of land valuation
Q: According to the use of housing classification?
According to the use of housing functions can be divided into eight categories:
Q: How is the real estate sales invoice open?
Through the real estate tax control system to issue real estate invoices, including the advance payment
Q: What is the real estate from the law?
that is, land (or land use rights), buildings and premises in a state of physical entities and their rights and interests.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches