• HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--011 System 1
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--011 System 2
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--011 System 3
  • HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--011 System 4
HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--011

HEAVY STEEL STRUCTURE PROJECT AND BUILDING---PYCG--011

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m³
Supply Capability:
500000 m³/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

 1.     DESIGN DRAWINGS

 

The design drawing is the first step we should consider. If you have your own design, we will recheck it and start production based on it.

 

If you don’t have design plan, we can achieve it   for you. CNBM is one group, we can provide you not only production and material, but design and drawings. The designing charges will be confirmed according to your project details.

 

2.     What we need to do the design?

1.     Project Information, usage, construction area, height, how many storeys

2.      Weather report and geological for the location district

3.     Production process:

1.     Confirm design plan.

2.      Building the mould to confirm the design is correct.

3.     Mass production, packing and transportation.

4.     Installation

5.      After sale service.

 

4. Packing choice:

 

1. We can choose the steel structure to pack the products, its cost is a little higher, but the result is perfect, easy to transfer and load. This packing is designed for accurate production

 2.Bulk packing. This packing is designed for  heavy steel structure, such as beam, pillar, its advantage is cost less and easy to operate.

5. Shipment choice

1.     Container transportation. We can load the steel structure in the container directly. This choice is available for small project, the total weight of steel  is less than 3000 tons.

 

2. Bulk cargo ship

If the total weight of steel structure is more than 3000 tons, we can choose  bulk cargo shipment. This choice is cost less and save time.

6.     Installation choice:

 

 1.     We send our engineer to guide the  overseas installation . This is available for the small project. We will send 3 to 4 engineer to guide the local workers to achieve the installation. Its advantage is saving installation charges for customer.

2.     We send our engineers and construction workers together to operate installation. This is better choice for big project. Cost is a little higher, especially for the air tickets, accommodation. However, it will save the time for customers.

 

 

Q:What is the status quo of China's real estate market?
The country's macro-control and related government departments are also increasingly rule-based supervision
Q:What is the impact of the economic environment on real estate?
The economic cycle determines the effective demand for real estate. The effective demand of the real estate market is limited by the actual purchasing power of the consumers
Q:What is the characteristics of real estate?
(C) the diversity of influencing factors. preservation and appreciation.
Q:Real estate, people often say 'case' is what it means
Is the meaning of the scene, also known as the sales case, refers to the sales office site.
Q:How is China's housing market in other aspects ?
First, the proportion of high-end residential will decline, the proportion of affordable housing and low-rent housing will rise
Q:Real estate in the "five card" which five?
State-owned land use permit is to prove that the land user to pay the land use right transfer fee, access to a certain period of time within a state-owned land use rights legal certificate;
Q:When China introduct the real estate?
mainly in China's southern, Hainan, Shenzhen, Zhuhai, Huizhou, Beihai city appeared in the real estate market overheating problem
Q:What is the main property sales?
new homes and old houses, commercial housing, fund - raising room to do, the scope to be bigger, a region of all houses have the opportunity to do
Q:When is the introduction of real estate?
In the early stages of the beginning of the eighties, the first control is in 93 years
Q:What is the real estate development prospects now?
so that supply is greater than demand, but in the medium and long term, the supply is still tight.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches