H Type Scaffolding Frame
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Type | Size(mm | Weight(kg) | Surface finished | 40'ft(pcs) | main pipe | Other pipe |
DM-1 | 1900X1219 | 15 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.5 |
DM-2 | 1900X1219 | 14 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.2 |
DT-1 | 1900X1219 | 16 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.5 |
DT-2 | 1900X1219 | 15 | Galvanized/Colored | 600 | φ42X2.2 | φ27X1.2 |
DMT-1 | 1900X1219 | 16.5 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.5 |
DMT-2 | 1900X1219 | 15.5 | Galvanized/Colored | 600 | φ42X2.2 | φ27X1.2 |
XM-1 | 1700X950 | 12.5 | Galvanized/Colored | 840 | φ42X2.5 | φ27X1.5 |
XM-2 | 1700X950 | 11.5 | Galvanized/Colored | 840 | φ42X2.2 | φ27X1.2 |
XM-3 | 1700X950 | 10 | Galvanized/Colored | 840 | φ42X2.0 | φ27X1.1 |
XT-1 | 1700X950 | 13 | Galvanized/Colored | 840 | φ42X2.5 | φ27X1.5 |
XT-2 | 1700X950 | 12 | Galvanized/Colored | 840 | φ42X2.2 | φ27X1.2 |
XT-3 | 1700X950 | 11 | Galvanized/Colored | 840 | φ42X2.0 | φ27X1.1 |
Other not specified in the specification, according to your requirement.
- Q: How to carry out fire inspection at construction site construction site (including information and site)
- How to carry out fire inspection at construction site construction site (including information and site)
- Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
- Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
- Q: the reading on the left scale is 400n what should the reading on the right scale be?
- Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
- Q: I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
- This company is hiring that company for those who buys them for that thing, from now and then!!
- Q: I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
- Check with Home Depot or Lowes. you can usually find what you need there.
- Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
- the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
- Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
- Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
- the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
- Q: Sprinkling water on the construction helps to help reduce haze days
- to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
- Q: I would like to know what the scope of responsibility for the construction engineering supervision is specific
- Especially when the project quality accident and other accidents need to be investigated, the supervising enterprise or the supervisor is often in a passive state of fear or fear , With the resignation of life to describe the situation at this time and then appropriate
Send your message to us
H Type Scaffolding Frame
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches