H Type Scaffolding Frame
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Type | Size(mm | Weight(kg) | Surface finished | 40'ft(pcs) | main pipe | Other pipe |
DM-1 | 1900X1219 | 15 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.5 |
DM-2 | 1900X1219 | 14 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.2 |
DT-1 | 1900X1219 | 16 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.5 |
DT-2 | 1900X1219 | 15 | Galvanized/Colored | 600 | φ42X2.2 | φ27X1.2 |
DMT-1 | 1900X1219 | 16.5 | Galvanized/Colored | 600 | φ42X2.5 | φ27X1.5 |
DMT-2 | 1900X1219 | 15.5 | Galvanized/Colored | 600 | φ42X2.2 | φ27X1.2 |
XM-1 | 1700X950 | 12.5 | Galvanized/Colored | 840 | φ42X2.5 | φ27X1.5 |
XM-2 | 1700X950 | 11.5 | Galvanized/Colored | 840 | φ42X2.2 | φ27X1.2 |
XM-3 | 1700X950 | 10 | Galvanized/Colored | 840 | φ42X2.0 | φ27X1.1 |
XT-1 | 1700X950 | 13 | Galvanized/Colored | 840 | φ42X2.5 | φ27X1.5 |
XT-2 | 1700X950 | 12 | Galvanized/Colored | 840 | φ42X2.2 | φ27X1.2 |
XT-3 | 1700X950 | 11 | Galvanized/Colored | 840 | φ42X2.0 | φ27X1.1 |
Other not specified in the specification, according to your requirement.
- Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
- Q: - Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
- In the late 1950s, oil wells were specially developed for oil
- Q: the reading on the left scale is 400n what should the reading on the right scale be?
- Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
- Q: What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
- Bowl buckle structure is generally used as a scaffolding, of course, can also be used as cast-in-place concrete plate template bracket View original post & gt; & gt;
- Q: PLEASE HELP!!!!!
- maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
- Q: There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
- At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding load shall not exceed 270kg & nbsp; # 47; m
- Q: Construction scaffolding erected what is the standard, there is no template can refer to it?
- scaffolding load shall not exceed 270kg / m
- Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- 2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
- Q: What is the vertical transport of construction and the high increase in fees
- In the contract of the project, the construction unit is paid a fee for the construction unit
Send your message to us
H Type Scaffolding Frame
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches