Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Standard: | ASTM, AISI, DIN, EN, GB, JIS | Place of Origin: | Hebei, China (Mainland) | Brand Name: | yize |
Model Number: | yz-7475 | Type: | Seamless | Steel Grade: | 300 Series |
Application: | Construction ,industrial material | Certification: | ISO | Welding Line Type: | Spiral Welded |
Thickness: | 0.25-3.0mm | Outer Diameter: | 6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm | certification: | ISO, ISO 9001 |
Length: | 1m-12m | application: | Fluid Pipe | Finish: | 2B (Mill Finish), bright, satin, hairline, mirror ETC |
mark: | heat number,material,size,standard | Material: | AISI 201, 202, 304, 304L, 316, 316L and 430 | Thickness Tolerance: | 0.25-3.0mm |
uses: | Construction ,industrial material |
2.Packaging & Delivery
Packaging Details: | plastic bag for each piece then packed in seaworthy wooden cases |
Delivery Detail: | 30 days |
3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube
1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.
2) Standard: AISI, ASTM, DIN, GB, JIS, SUS
3) Dimension: 3-400mm
4) Length: 2-6m or as customer decided
5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,
6) Packing: Nylon bag or according to client's requirement
Terms:
1) Delivery term: FOB,CFR, CIF
2) Delivery lead time: 10 working days after received T/T or L/C deposit.
3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.
4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.
4.Product Application:
With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet
cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.
5.Chemical composition and physical properties:
Grade | C | Si | Mn | P | S | Ni | Cr | Cu | Mo | Ni |
304 | Max0.07 | Max 1 | Max 2 | Max 0.045 | 0.15to0.35 | Max0.11 | 17.5to19.5 | Max 1 | - | 8to 10
|
304L | Max0.03 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 18to20 | - | 2to2.5 | 10to12
|
316 | Max0.07 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 16.5to18.5 | - | 2to205 |
10to13
|
316L | Max0.03 | Max1 | Max2 | Max0.045 | Max0.03 | Max0.11 | 17to19 | - | 2.5to3 |
12.5to15 |
410 | 0.08TO0.15 | Max1 | 0.04 | 0.03 | - | - | 11.5to13.5 | - | - |
- |
430 | Max0.08 | Max1 | Max1.5 | 0.04 | 0.03 | - | 12to14 | - | - |
- |
Φ 48 | (mm)thickness | length |
Regular dimension | 2.5、2.75、3.0、3.25、3.5、3.75、4.0 |
6
|
custom-tailored | 1.0-5.0 |
1-9
|
6.Pictures
- Q:What is the distance from the external walls of the scaffolding and scaffolding?
- Scaffold (scaffold) refers to the construction site for workers to operate and solve the vertical and horizontal transport and erected various stents
- Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- So do the project budget review work, will help improve the design level and investment efficiency
- Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
- Q:so im 16 and only got into piecings within like the last year...iv only got my belly done, but iv been in love the scaffold piercing for ages, but im just wondering whether it would look really odd if i got it as it would be the only ear piecing i had, opinions??(and yes if i got it done i would go to a reputable place)
- I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
- Q:Sprinkling water on the construction helps to help reduce haze days
- Sprinkling the construction site is an effective means to reduce the construction of dust, you can indirectly less haze days
- Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
- This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
- Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
- Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
- They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
- Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
- The scope of project supervision responsibility should mainly cover two aspects: one must involve the project itself, the site management is different from the project management, the former is the contractor's responsibility, the latter is the responsibility of the supervision interval, and the project itself has nothing to do with the responsibility of the accident , If the accountability of enterprises or supervisors is not based on the responsibility Such as temporary construction, temporary electricity, erection of scaffolding, loading and unloading of various building materials, on-site transport equipment, etc, does not constitute the project itself, so even if the accident occurred, should not be held accountable or supervisory staff responsibility Second, it must involve the quality of the project, because the owner is the first person responsible for the quality of the project, the project supervision enterprises as a social intermediary service organization, its power, responsibility and obligation is derived by the owner commissioned by any supervision business can not exceed the owner commissioned Responsibilities and new powers and obligations Therefore, the supervision of enterprises not only to bear the corresponding responsibility for the quality of the accident, but also due to the quality of the accident caused by accidents, including accidents, including other accidents
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords