Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Standard: | ASTM, AISI, DIN, EN, GB, JIS | Place of Origin: | Hebei, China (Mainland) | Brand Name: | yize |
Model Number: | yz-7475 | Type: | Seamless | Steel Grade: | 300 Series |
Application: | Construction ,industrial material | Certification: | ISO | Welding Line Type: | Spiral Welded |
Thickness: | 0.25-3.0mm | Outer Diameter: | 6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm | certification: | ISO, ISO 9001 |
Length: | 1m-12m | application: | Fluid Pipe | Finish: | 2B (Mill Finish), bright, satin, hairline, mirror ETC |
mark: | heat number,material,size,standard | Material: | AISI 201, 202, 304, 304L, 316, 316L and 430 | Thickness Tolerance: | 0.25-3.0mm |
uses: | Construction ,industrial material |
2.Packaging & Delivery
Packaging Details: | plastic bag for each piece then packed in seaworthy wooden cases |
Delivery Detail: | 30 days |
3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube
1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.
2) Standard: AISI, ASTM, DIN, GB, JIS, SUS
3) Dimension: 3-400mm
4) Length: 2-6m or as customer decided
5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,
6) Packing: Nylon bag or according to client's requirement
Terms:
1) Delivery term: FOB,CFR, CIF
2) Delivery lead time: 10 working days after received T/T or L/C deposit.
3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.
4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.
4.Product Application:
With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet
cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.
5.Chemical composition and physical properties:
Grade | C | Si | Mn | P | S | Ni | Cr | Cu | Mo | Ni |
304 | Max0.07 | Max 1 | Max 2 | Max 0.045 | 0.15to0.35 | Max0.11 | 17.5to19.5 | Max 1 | - | 8to 10
|
304L | Max0.03 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 18to20 | - | 2to2.5 | 10to12
|
316 | Max0.07 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 16.5to18.5 | - | 2to205 |
10to13
|
316L | Max0.03 | Max1 | Max2 | Max0.045 | Max0.03 | Max0.11 | 17to19 | - | 2.5to3 |
12.5to15 |
410 | 0.08TO0.15 | Max1 | 0.04 | 0.03 | - | - | 11.5to13.5 | - | - |
- |
430 | Max0.08 | Max1 | Max1.5 | 0.04 | 0.03 | - | 12to14 | - | - |
- |
Φ 48 | (mm)thickness | length |
Regular dimension | 2.5、2.75、3.0、3.25、3.5、3.75、4.0 |
6
|
custom-tailored | 1.0-5.0 |
1-9
|
6.Pictures
- Q: so im 16 and only got into piecings within like the last year...iv only got my belly done, but iv been in love the scaffold piercing for ages, but im just wondering whether it would look really odd if i got it as it would be the only ear piecing i had, opinions??(and yes if i got it done i would go to a reputable place)
- I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
- Q: - Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
- In the late 1950s, oil wells were specially developed for oil
- Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
- This depends on your choice of products to decide, because now scaffolding collapse accident frequently, we recommend that you must use the national standard fasteners
- Q: Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
- Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
- Q: I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
- This company is hiring that company for those who buys them for that thing, from now and then!!
- Q: The name of the laws and regulations relating to the building, at least . The The
- Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
- Q: PLEASE HELP!!!!!
- maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
- Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
- Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q: I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
- They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Send your message to us
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords