Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Standard: | ASTM, AISI, DIN, EN, GB, JIS | Place of Origin: | Hebei, China (Mainland) | Brand Name: | yize |
Model Number: | yz-7475 | Type: | Seamless | Steel Grade: | 300 Series |
Application: | Construction ,industrial material | Certification: | ISO | Welding Line Type: | Spiral Welded |
Thickness: | 0.25-3.0mm | Outer Diameter: | 6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm | certification: | ISO, ISO 9001 |
Length: | 1m-12m | application: | Fluid Pipe | Finish: | 2B (Mill Finish), bright, satin, hairline, mirror ETC |
mark: | heat number,material,size,standard | Material: | AISI 201, 202, 304, 304L, 316, 316L and 430 | Thickness Tolerance: | 0.25-3.0mm |
uses: | Construction ,industrial material |
2.Packaging & Delivery
Packaging Details: | plastic bag for each piece then packed in seaworthy wooden cases |
Delivery Detail: | 30 days |
3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube
1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.
2) Standard: AISI, ASTM, DIN, GB, JIS, SUS
3) Dimension: 3-400mm
4) Length: 2-6m or as customer decided
5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,
6) Packing: Nylon bag or according to client's requirement
Terms:
1) Delivery term: FOB,CFR, CIF
2) Delivery lead time: 10 working days after received T/T or L/C deposit.
3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.
4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.
4.Product Application:
With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet
cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.
5.Chemical composition and physical properties:
Grade | C | Si | Mn | P | S | Ni | Cr | Cu | Mo | Ni |
304 | Max0.07 | Max 1 | Max 2 | Max 0.045 | 0.15to0.35 | Max0.11 | 17.5to19.5 | Max 1 | - | 8to 10
|
304L | Max0.03 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 18to20 | - | 2to2.5 | 10to12
|
316 | Max0.07 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 16.5to18.5 | - | 2to205 |
10to13
|
316L | Max0.03 | Max1 | Max2 | Max0.045 | Max0.03 | Max0.11 | 17to19 | - | 2.5to3 |
12.5to15 |
410 | 0.08TO0.15 | Max1 | 0.04 | 0.03 | - | - | 11.5to13.5 | - | - |
- |
430 | Max0.08 | Max1 | Max1.5 | 0.04 | 0.03 | - | 12to14 | - | - |
- |
Φ 48 | (mm)thickness | length |
Regular dimension | 2.5、2.75、3.0、3.25、3.5、3.75、4.0 |
6
|
custom-tailored | 1.0-5.0 |
1-9
|
6.Pictures
- Q: A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
- the HOW is that if he moves 1/6 of the way to an end, then he's 1/3 of the way from that end and 2/3 of the way from the other end. The tension from the platform doesn't change, but the tension from the man on either rope is inversely proportional to his distance from either end; in other words, he's 1/3 of the way from the right end, so 2/3 of his mass goes to tension on that rope; he's 2/3 from the other end so 1/3 of his mass goes to tension on the left rope. the rest is just math!
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
- Hello, "farmers from the building, the most important is the quality and safety
- Q: (Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
- Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
- Q: What is the most important safety hazard at the construction site?
- 2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
- Q: There is no shelter outside the scaffolding project has been accident accident case
- I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ??5800m2
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
- Q: I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- Of course, you can make your own soil to do a radius of 4 meters small cloth machine
- Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Send your message to us
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords