Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Standard: | ASTM, AISI, DIN, EN, GB, JIS | Place of Origin: | Hebei, China (Mainland) | Brand Name: | yize |
Model Number: | yz-7475 | Type: | Seamless | Steel Grade: | 300 Series |
Application: | Construction ,industrial material | Certification: | ISO | Welding Line Type: | Spiral Welded |
Thickness: | 0.25-3.0mm | Outer Diameter: | 6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm | certification: | ISO, ISO 9001 |
Length: | 1m-12m | application: | Fluid Pipe | Finish: | 2B (Mill Finish), bright, satin, hairline, mirror ETC |
mark: | heat number,material,size,standard | Material: | AISI 201, 202, 304, 304L, 316, 316L and 430 | Thickness Tolerance: | 0.25-3.0mm |
uses: | Construction ,industrial material |
2.Packaging & Delivery
Packaging Details: | plastic bag for each piece then packed in seaworthy wooden cases |
Delivery Detail: | 30 days |
3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube
1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.
2) Standard: AISI, ASTM, DIN, GB, JIS, SUS
3) Dimension: 3-400mm
4) Length: 2-6m or as customer decided
5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,
6) Packing: Nylon bag or according to client's requirement
Terms:
1) Delivery term: FOB,CFR, CIF
2) Delivery lead time: 10 working days after received T/T or L/C deposit.
3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.
4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.
4.Product Application:
With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet
cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.
5.Chemical composition and physical properties:
Grade | C | Si | Mn | P | S | Ni | Cr | Cu | Mo | Ni |
304 | Max0.07 | Max 1 | Max 2 | Max 0.045 | 0.15to0.35 | Max0.11 | 17.5to19.5 | Max 1 | - | 8to 10
|
304L | Max0.03 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 18to20 | - | 2to2.5 | 10to12
|
316 | Max0.07 | Max1 | Max2 | max0.045 | Max0.03 | Max0.11 | 16.5to18.5 | - | 2to205 |
10to13
|
316L | Max0.03 | Max1 | Max2 | Max0.045 | Max0.03 | Max0.11 | 17to19 | - | 2.5to3 |
12.5to15 |
410 | 0.08TO0.15 | Max1 | 0.04 | 0.03 | - | - | 11.5to13.5 | - | - |
- |
430 | Max0.08 | Max1 | Max1.5 | 0.04 | 0.03 | - | 12to14 | - | - |
- |
Φ 48 | (mm)thickness | length |
Regular dimension | 2.5、2.75、3.0、3.25、3.5、3.75、4.0 |
6
|
custom-tailored | 1.0-5.0 |
1-9
|
6.Pictures
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
- Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
- Q: Seeking construction machinery safety supervision papers can be greater than 100 words
- Summary: With the national construction laws and regulations, the introduction of local laws and regulations, the construction of administrative departments in charge of supervision and supervision of the implementation of the project construction quality has improved significantly, but not with the Adapted to the safety management of the construction process has not been able to work with the quality of construction work to improve, vicious security incidents frequently
- Q: The name of the laws and regulations relating to the building, at least . The The
- , Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
- Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
- First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
- Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
- the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
- Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
- It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
- Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- 2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
- Q: I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
- They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Send your message to us
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 15000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords