Black or Galvanized U -head Scaffolding Jack Base
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500000根 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffolding Jack Base
1.Steel material: Q235
2.Length:Customized.
3.Hollow .
4.Shpae of base: U head, plain head.
5.Surface treatment: Oiled Color painted, Hot dip galvanized, Electro galvanized
6.Usage:Scaffolding part, adjusts the balance of scaffolding frame.
Adjustable Scaffolding Base jack
Size: 35/38x4mm, 143x143x5/6mm, 600,914,1524mm
Material: Q235
Surface finish:painted,galvanized
Type: base jack, top jack
Diameter: 30mm, 32mm, 34mm, 36mm, 37mm, 38mm, 40mm
Length: 400mm, 600mm
Base plate: 140*140*5mm
OEM service provided
Screw Jack Base
Dimensions: Diameter 35/38mm, Base plate 143x143x5/6mm, length 600,914,1524mm
Item | Screw Jack Base |
Material | Q235 |
Dimensions | 35/38mm, 100x150mm, 600,914,1524mm |
Surface | Hot-dip galvanization, electro galvanization ,or as your request |
Standard | EN74 |
Note | OEM service is available |
MOQ | 1000pieces |
Package | in steel pallet, or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time | 20-30days |
Feature of screw jack base:
1) Base plates provide extra stability.
2) Enables safe use on uneven ground.
3) Galvanization for long lasting protection.
4) Elements safely connected.
Type: base jack, top jack
Diameter: 32mm, 34mm, 38mm
Length: 400mm, 600mm
Base plate: 120*120*5mm, 140*140*5mm, 150*150*6mm
OEM service provided
- Q: What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
- Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
- Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
- Q: How to do a good job in typhoon prevention work in rural areas?
- Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
- Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
- Q: I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
- This company is hiring that company for those who buys them for that thing, from now and then!!
- Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
- It is the main component form of a house
- Q: Can the fifteen typhoon blow up the three - storey house?
- The residents in the home against the typhoon to pay attention to what】? To put away a variety of hanging objects inside and outside the house to prevent the wind falling objects wounding; garden flowers with a bracket to protect, pruning branches to prevent the destruction or damage to the roof; The need for doors and windows, and add nailed wood; check the line, ready to flashlight, candles, storage of drinking water to prevent power off the water; more than a day food and vegetables, not necessary to go out
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding load shall not exceed 270kg & nbsp; # 47; m
- Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- 2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
- Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- this could be a 2d concern. The moments approximately any factor interior the gadget would desire to stability, in the different case the gadget (scaffold) would rotate. additionally, the vertical forces would desire to stability, or the gadget (scaffold) would translate. it form of feels to me that to the superb from the middle of the scaffold it somewhat is a distance one 6th of the dimensions of the scaffold is comparable to saying 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any factor. i will evaluate the left facet of the scaffold, the place the 2d produced by the left rope is 0. comprehensive M = 0 = scaffold M + guy M + suited rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is considered a factor mass located at its center the strain F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign remedy for F. To get the strain in the different rope, you are able to basically evaluate the vertical forces interior the gadget. on the different hand, you should sum the moments approximately another factor (say, the superb rope). wish this permits.
Send your message to us
Black or Galvanized U -head Scaffolding Jack Base
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500000根 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords