• Black or Galvanized U -head Scaffolding Jack Base System 1
  • Black or Galvanized U -head Scaffolding Jack Base System 2
  • Black or Galvanized U -head Scaffolding Jack Base System 3
Black or Galvanized U -head Scaffolding Jack Base

Black or Galvanized U -head Scaffolding Jack Base

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
500000根 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffolding Jack Base

1.Steel material: Q235
2.Length:Customized.
3.Hollow .
4.Shpae of base: U head, plain head.

5.Surface treatment: Oiled Color painted, Hot dip galvanized, Electro galvanized

6.Usage:Scaffolding part, adjusts the balance of scaffolding frame.

Adjustable Scaffolding Base jack
Size: 35/38x4mm, 143x143x5/6mm, 600,914,1524mm
Material: Q235

Surface finish:painted,galvanized

Type: base jack, top jack

Diameter: 30mm, 32mm, 34mm, 36mm, 37mm, 38mm, 40mm

Length: 400mm, 600mm

Base plate: 140*140*5mm

OEM service provided

Screw Jack Base

Dimensions: Diameter 35/38mm, Base plate 143x143x5/6mm, length 600,914,1524mm

Item

Screw Jack Base

Material

Q235

Dimensions

35/38mm, 100x150mm, 600,914,1524mm

Surface

Hot-dip galvanization, electro galvanization ,or as your request

Standard

EN74

Note

OEM service is available

MOQ

1000pieces

Package

in steel pallet, or as your request

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

Feature of screw jack base:

1) Base plates provide extra stability.

2) Enables safe use on uneven ground.

3) Galvanization for long lasting protection.

4) Elements safely connected.



Type: base jack, top jack

Diameter: 32mm, 34mm, 38mm

Length: 400mm, 600mm

Base plate: 120*120*5mm, 140*140*5mm, 150*150*6mm

OEM service provided




Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
This depends on your choice of products to decide, because now scaffolding collapse accident frequently, we recommend that you must use the national standard fasteners
Q: What is the bamboo board for the scaffolding of the building?
Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
Q: How to do a good job in typhoon prevention work in rural areas?
Close the doors and windows, so as not to be strong wind blowing, check and tightly easy to be the wind to the objects, such as windows
Q: the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
System, and to monitor the implementation of the situation
Q: Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords