Black or Galvanized U -head Scaffolding Jack Base
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500000根 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Scaffolding Jack Base
1.Steel material: Q235
2.Length:Customized.
3.Hollow .
4.Shpae of base: U head, plain head.
5.Surface treatment: Oiled Color painted, Hot dip galvanized, Electro galvanized
6.Usage:Scaffolding part, adjusts the balance of scaffolding frame.
Adjustable Scaffolding Base jack
Size: 35/38x4mm, 143x143x5/6mm, 600,914,1524mm
Material: Q235
Surface finish:painted,galvanized
Type: base jack, top jack
Diameter: 30mm, 32mm, 34mm, 36mm, 37mm, 38mm, 40mm
Length: 400mm, 600mm
Base plate: 140*140*5mm
OEM service provided
Screw Jack Base
Dimensions: Diameter 35/38mm, Base plate 143x143x5/6mm, length 600,914,1524mm
Item | Screw Jack Base |
Material | Q235 |
Dimensions | 35/38mm, 100x150mm, 600,914,1524mm |
Surface | Hot-dip galvanization, electro galvanization ,or as your request |
Standard | EN74 |
Note | OEM service is available |
MOQ | 1000pieces |
Package | in steel pallet, or as your request |
Payment Terms | TT,L/C, we can contact in detail |
Delivery Time | 20-30days |
Feature of screw jack base:
1) Base plates provide extra stability.
2) Enables safe use on uneven ground.
3) Galvanization for long lasting protection.
4) Elements safely connected.
Type: base jack, top jack
Diameter: 32mm, 34mm, 38mm
Length: 400mm, 600mm
Base plate: 120*120*5mm, 140*140*5mm, 150*150*6mm
OEM service provided
- Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
- This depends on your choice of products to decide, because now scaffolding collapse accident frequently, we recommend that you must use the national standard fasteners
- Q: What is the bamboo board for the scaffolding of the building?
- Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
- Q: How to do a good job in typhoon prevention work in rural areas?
- Close the doors and windows, so as not to be strong wind blowing, check and tightly easy to be the wind to the objects, such as windows
- Q: the reading on the left scale is 400n what should the reading on the right scale be?
- Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
- Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
- System, and to monitor the implementation of the situation
- Q: Construction technology measures fee is directly into the sub - project costs
- Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
- Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
- ... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
- Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
- Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Send your message to us
Black or Galvanized U -head Scaffolding Jack Base
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 500000根 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords