Q235 Steel 1219 H Frame Scaffolding for construction
- Ref Price:
-
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
Add to My Favorites
Follow us:
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Quick Details
Brand Name: Q235 Steel 1219 H Frame Scaffolding
Model Number: H Frame Scaffolding
Material: Q235 steel tube
Maint Tube Diameter: 42mm
Main Tube Thickness: 2.2-1.7mm
Surface Finished: high protected dip painted
Certification: SGS, BV,EN12810
Color: orange, blue
Using Life: 3-5 years
Techique: CO2 arc welding scaffolding
Performance: quickly to use in Construction
Application: inside & outside building construction
Packaging & Delivery
Packaging Details:
Delivery Detail:
1.As a practice, modular frame systems is bare packed in Container. 2.The packing of frame scaffolding also can be made depend on the customers' need. |
10 -15 days after deposite |
Feature
1.SGS,BV tested h frame scaffolding
2.light frame type
3.best price for sale
4.painting surface
Main Frame |
Code | Thickness(mm) | Height(mm) | Width(mm) | Surface Treatment |
HF1930 | 2.0/2.2 | 1930 | 1219 | HDG/Painted |
HF1700 | 1700 | 1219 |
HF 1524 | 1524 | 1219 |
HF1709 | 1700 | 914 |
LF1700 | 1700 | 1219 |
LF1219 | 1219 | 1219 |
LF914 | 914 | 1219 |
LF1524 | 1524 | 1524 |
LF1930 | 1930 | 1524 |
What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
- Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
- Market analysis: 1 GB steel fastener leasing to play a good quality of the banner, do not and non-standard cast iron pieces to be confused, to a single package site, in the normal rental costs increased by about 30%, the interests of both sides are not affected, get Is a safe, non-controversial and harmonious development; 2 Some very powerful large construction group since the purchase of national standard fasteners, a large amount of steel fasteners more advantages to sell them Because we are the production of European steel plate fastener manufacturers, so you can only give a little advice on the fastener, if you want to inquiry can call Ouke company's phone: 0317-, our website is wwwhb-ok com, welcome to visit
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: How to do a good job in typhoon prevention work in rural areas?
- Close the doors and windows, so as not to be strong wind blowing, check and tightly easy to be the wind to the objects, such as windows
- Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
- Q: I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
- Check with Home Depot or Lowes. you can usually find what you need there.
- Q: What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
- Bowl buckle structure is generally used as a scaffolding, of course, can also be used as cast-in-place concrete plate template bracket View original post & gt; & gt;
- Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
- Q: I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- That is, the upper and lower with a pump on the 90-degree bend, the two of them with the root 1 m straight tube connected to each other, and the other round steel to do two large diameter 18 meters, and then some straight round 2 large circle made of a hoop, and then the two straight with elbow straight fixed Below the elbow tow pump up the pump tube, the top elbow root 2 m straight tube It can be in the range of 4 meters to rotate the fabric, such as to move the car can be used in place
- Q: Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
- 2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
- Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)