Q235 Steel 1219 H Frame Scaffolding for construction
- Ref Price:
-

- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
Add to My Favorites
Follow us:
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Quick Details
Brand Name: Q235 Steel 1219 H Frame Scaffolding
Model Number: H Frame Scaffolding
Material: Q235 steel tube
Maint Tube Diameter: 42mm
Main Tube Thickness: 2.2-1.7mm
Surface Finished: high protected dip painted
Certification: SGS, BV,EN12810
Color: orange, blue
Using Life: 3-5 years
Techique: CO2 arc welding scaffolding
Performance: quickly to use in Construction
Application: inside & outside building construction
Packaging & Delivery
Packaging Details:
Delivery Detail:
1.As a practice, modular frame systems is bare packed in Container. 2.The packing of frame scaffolding also can be made depend on the customers' need. |
10 -15 days after deposite |
Feature
1.SGS,BV tested h frame scaffolding
2.light frame type
3.best price for sale
4.painting surface
Main Frame |
Code | Thickness(mm) | Height(mm) | Width(mm) | Surface Treatment |
HF1930 | 2.0/2.2 | 1930 | 1219 | HDG/Painted |
HF1700 | 1700 | 1219 |
HF 1524 | 1524 | 1219 |
HF1709 | 1700 | 914 |
LF1700 | 1700 | 1219 |
LF1219 | 1219 | 1219 |
LF914 | 914 | 1219 |
LF1524 | 1524 | 1524 |
LF1930 | 1930 | 1524 |
What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

- Q: How to carry out fire inspection at construction site construction site (including information and site)
- How to carry out fire inspection at construction site construction site (including information and site)
- Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- Look at how many holes are needed with a few meters of steel pipe
- Q: the reading on the left scale is 400n what should the reading on the right scale be?
- Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
- Q: The obvious would be helpful too!
- Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
- Q: For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
- Hello, "farmers from the building, the most important is the quality and safety
- Q: There is no shelter outside the scaffolding project has been accident accident case
- I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ??5800m2
- Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
- Scaffolding load shall not exceed 270kg & nbsp; # 47; m
- Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
- It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
- Q: what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
- Historical a place with alot of history attached to it Landmarks
- Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)