Manual Adjustable Scaffolding Shoring prop Jack
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 180000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product name: scaffolding prop
Type:italian ,German,Spanish,Middle East prop, steel pipe surpport.
Adjustable height:0.8-5.5m
Pipe/Tube tickness:1.5mm-4mm
Innner Diameter:40mm,48mm,etc.
Outer Diameter:48mm,56mm,60mm,etc.
Plate type:square,flower/clover,U-head
Nut type: single handle(common,7-style, big 7-style),Cup-style/Double handle
Pin type:line stright with metal cap,line straight without metal cap,chain,G-style
Plate size:120*12*4mm,120*120*5mm,140*140*5mm/5.5mm,etc.
Surface treatment: painted,galvanized,powder coating
Color:orange,red,blue,green,white,etc.
OEM ACCEPTABLE
Fast delivery wihtin 30days
Professional and reliable
- Q: Seeking construction machinery safety supervision papers can be greater than 100 words
- Summary: With the national construction laws and regulations, the introduction of local laws and regulations, the construction of administrative departments in charge of supervision and supervision of the implementation of the project construction quality has improved significantly, but not with the Adapted to the safety management of the construction process has not been able to work with the quality of construction work to improve, vicious security incidents frequently
- Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
- System, and to monitor the implementation of the situation
- Q: What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
- Bowl buckle structure is generally used as a scaffolding, of course, can also be used as cast-in-place concrete plate template bracket View original post & gt; & gt;
- Q: The name of the laws and regulations relating to the building, at least . The The
- Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
- Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
- It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
- Q: What is the distance from the external walls of the scaffolding and scaffolding?
- Common terminology in the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG
- Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
- Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
- Q: Construction scaffolding erected what is the standard, there is no template can refer to it?
- Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
- Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q: A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
- Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Send your message to us
Manual Adjustable Scaffolding Shoring prop Jack
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 180000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches