Ring-lock Scaffolding with High Efficiency and Reliable Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 set
- Supply Capability:
- 40000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Cup-lock Scaffolding
A support system for construction, owns advantages of both cup-lock scaffolding and shoring tower. It is in the development direction of new type scaffolding. It is widely used in buildings, bridges, tunnels etc.
Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.
Product Name: Scaffolding Light Duty Shoring Prop Systems
Model Number: QS-L-1000/1700/1900/2000/2200.
2.Main Features of Cup-lock Scaffolding
Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal.
Easy to storage and transportation.
Made By 48mm Diameter inner tube/56mm Diameter outer tube.
Made By 40mm Diameter inner tube/48mm Diameter outer tube.
Size Available:
1000mm(Min)--1800mm(Max)
1700mm(Min)--3000mm(Max)
1900mm(Min)--3500mm(Max)
2000mm(Min)--3600mm(Max)
3200mm(Min)--4000mm(Max)
3.Cup-lock Scaffolding Images
4.Cup-lock Scaffolding Specification
Type | Adjustable Length | Outer Tube | Inner Tube | Weight | 20ft Container | Surface Treatment |
Spanish Prop | 800-1400 | 48*1.6*765 | 40*1.8*835 | 4.74 | 3500 | Painted, powder coated, electro galvanized or hot dip galvanized |
1600-3000 | 48*1.6*1600 | 40*1.8*1600 | 7.57 | 2200 | ||
2000-3500 | 48*1.6*1710 | 40*1.8*2000 | 8.45 | 2000 | ||
2200-4000 | 48*1.6*2000 | 40*1.8*2200 | 9.32 | 1750 | ||
Italian Prop | 1800-3100 | 56*1.6*1510 | 48*1.8*1800 | 9.36 | 2100 | |
2000-3600 | 56*1.6*1750 | 48*1.8*2000 | 10.29 | 2000 | ||
2200-4000 | 56*1.6*2010 | 48*1.8*2200 | 11.26 | 1750 | ||
Middle East or German Prop | 1400-2700 | 60*2.0*1340 | 48*2.0*1400 | 9.45 | 2300 | |
2000-3500 | 60*2.0*1540 | 48*2.0*2000 | 11.38 | 2000 | ||
2200-4000 | 60*2.0*1840 | 48*2.0*2200 | 12.7 | 1750 | ||
3000-5500 | 60*2.0*2540 | 48*2.0*3000 | 16.51 | 1500(40ft) |
5.FAQ OF Cup-lock Scaffolding
What promises can be done by us?
If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
- Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
- Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
- Q: What kind of insulation materials and equipment are allowed to be imported in China?
- What kind of insulation materials and equipment are allowed to be imported in China?
- Q: Construction technology measures fee is directly into the sub - project costs
- Division of project costs only include human labor costs, materials, machinery, business management fees and profits
- Q: PLEASE HELP!!!!!
- maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
- Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
- the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
- Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
- It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
- the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
- Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
- Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
- Forearm (long horizontal part) with more than 125mm of the pipe, and there is drooping hose (a bit like elephant nose, huh)
Send your message to us
Ring-lock Scaffolding with High Efficiency and Reliable Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 set
- Supply Capability:
- 40000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches