Ring-lock Scaffolding with High Efficiency and Reliable Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 set
- Supply Capability:
- 40000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Structure of Cup-lock Scaffolding
A support system for construction, owns advantages of both cup-lock scaffolding and shoring tower. It is in the development direction of new type scaffolding. It is widely used in buildings, bridges, tunnels etc.
Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.
Product Name: Scaffolding Light Duty Shoring Prop Systems
Model Number: QS-L-1000/1700/1900/2000/2200.
2.Main Features of Cup-lock Scaffolding
Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal.
Easy to storage and transportation.
Made By 48mm Diameter inner tube/56mm Diameter outer tube.
Made By 40mm Diameter inner tube/48mm Diameter outer tube.
Size Available:
1000mm(Min)--1800mm(Max)
1700mm(Min)--3000mm(Max)
1900mm(Min)--3500mm(Max)
2000mm(Min)--3600mm(Max)
3200mm(Min)--4000mm(Max)
3.Cup-lock Scaffolding Images
4.Cup-lock Scaffolding Specification
Type | Adjustable Length | Outer Tube | Inner Tube | Weight | 20ft Container | Surface Treatment |
Spanish Prop | 800-1400 | 48*1.6*765 | 40*1.8*835 | 4.74 | 3500 | Painted, powder coated, electro galvanized or hot dip galvanized |
1600-3000 | 48*1.6*1600 | 40*1.8*1600 | 7.57 | 2200 | ||
2000-3500 | 48*1.6*1710 | 40*1.8*2000 | 8.45 | 2000 | ||
2200-4000 | 48*1.6*2000 | 40*1.8*2200 | 9.32 | 1750 | ||
Italian Prop | 1800-3100 | 56*1.6*1510 | 48*1.8*1800 | 9.36 | 2100 | |
2000-3600 | 56*1.6*1750 | 48*1.8*2000 | 10.29 | 2000 | ||
2200-4000 | 56*1.6*2010 | 48*1.8*2200 | 11.26 | 1750 | ||
Middle East or German Prop | 1400-2700 | 60*2.0*1340 | 48*2.0*1400 | 9.45 | 2300 | |
2000-3500 | 60*2.0*1540 | 48*2.0*2000 | 11.38 | 2000 | ||
2200-4000 | 60*2.0*1840 | 48*2.0*2200 | 12.7 | 1750 | ||
3000-5500 | 60*2.0*2540 | 48*2.0*3000 | 16.51 | 1500(40ft) |
5.FAQ OF Cup-lock Scaffolding
What promises can be done by us?
If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
If printing required, please advise asap because the whole set need much more time to complete.
Please DO check goods when courier knocks your door and contact us asap if any issue.
- Q: What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
- Q: Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- So do the project budget review work, will help improve the design level and investment efficiency
- Q: Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
- This depends on your choice of products to decide, because now scaffolding collapse accident frequently, we recommend that you must use the national standard fasteners
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: On the issue of compensation after the event of force majeure
- It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
- Q: (Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
- Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
- Q: Seeking the Responsibility System of Safety Responsibility of Each Function Department Garden company for safe production permit
- System, and to monitor the implementation of the situation
- Q: The name of the laws and regulations relating to the building, at least . The The
- , Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
- Q: What is the distance from the external walls of the scaffolding and scaffolding?
- Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
- Q: Sprinkling water on the construction helps to help reduce haze days
- Construction site environmental protection measures are as follows: First, the dust management
Send your message to us
Ring-lock Scaffolding with High Efficiency and Reliable Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 set
- Supply Capability:
- 40000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches