• Ring-lock Scaffolding with High Efficiency and Reliable Quality System 1
  • Ring-lock Scaffolding with High Efficiency and Reliable Quality System 2
Ring-lock Scaffolding with High Efficiency and Reliable Quality

Ring-lock Scaffolding with High Efficiency and Reliable Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
500 set
Supply Capability:
40000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Cup-lock Scaffolding

 

A support system for construction, owns advantages of both cup-lock scaffolding and shoring tower. It is in the development direction of new type scaffolding. It is widely used in buildings, bridges, tunnels etc.

Scaffolding Light Duty Shoring prop System which is use on building as traction and pressure props.

Product Name: Scaffolding Light Duty Shoring Prop Systems

Model Number: QS-L-1000/1700/1900/2000/2200.

 

2.Main Features of Cup-lock Scaffolding

 

Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal.

Easy to storage and transportation.

Made By 48mm Diameter inner tube/56mm Diameter outer tube.

Made By 40mm Diameter inner tube/48mm Diameter outer tube.

Size Available:

1000mm(Min)--1800mm(Max)

1700mm(Min)--3000mm(Max)

1900mm(Min)--3500mm(Max)

2000mm(Min)--3600mm(Max)

3200mm(Min)--4000mm(Max)

 

 

3.Cup-lock Scaffolding Images

 

 

 

 

 

4.Cup-lock Scaffolding Specification

 

Type

Adjustable Length
 (mm)

Outer Tube
 (mm)

Inner Tube
 (mm)

Weight
 (kgs)

20ft Container
 (pcs)

Surface Treatment

Spanish Prop

800-1400

48*1.6*765

40*1.8*835

4.74

3500

Painted,   powder coated, electro galvanized or hot dip galvanized

1600-3000

48*1.6*1600

40*1.8*1600

7.57

2200

2000-3500

48*1.6*1710

40*1.8*2000

8.45

2000

2200-4000

48*1.6*2000

40*1.8*2200

9.32

1750

Italian Prop

1800-3100

56*1.6*1510

48*1.8*1800

9.36

2100

2000-3600

56*1.6*1750

48*1.8*2000

10.29

2000

2200-4000

56*1.6*2010

48*1.8*2200

11.26

1750

Middle East or German Prop

1400-2700

60*2.0*1340

48*2.0*1400

9.45

2300

2000-3500

60*2.0*1540

48*2.0*2000

11.38

2000

2200-4000

60*2.0*1840

48*2.0*2200

12.7

1750

3000-5500

60*2.0*2540

48*2.0*3000

16.51

1500(40ft)

 

 

5.FAQ OF Cup-lock Scaffolding

What promises can be done by us?

 If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

 If printing required, please advise asap because the whole set need much more time to complete.

 Please DO check goods when courier knocks your door and contact us asap if any issue.

Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
Q: What kind of insulation materials and equipment are allowed to be imported in China?
What kind of insulation materials and equipment are allowed to be imported in China?
Q: Construction technology measures fee is directly into the sub - project costs
Division of project costs only include human labor costs, materials, machinery, business management fees and profits
Q: PLEASE HELP!!!!!
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q: Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
the construction personnel to enter the site before the scene must seriously study the safety of technical operations procedures
Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
Forearm (long horizontal part) with more than 125mm of the pipe, and there is drooping hose (a bit like elephant nose, huh)

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches