Good Quality PVC Door Frame TCF220A
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Our factory is divided into twelve production lines. We use production equipment from Germany including mixers and double screw rod extruding machines. Our monthly capacity is 500 tons of wood plastic composites--80% of which we export.
We have an R&D department with 5 engineers who have an average of 10 years of experience. They research and develop our equipment, including the mixer, assembly line, QUV experiment meter, multi-purpose impact reflectoscope, dresser and knurling machine. We develop at least one new product every month and can prepare OEM samples for you with a lead time of one month.
We have a QC department with five engineers who have an average of four year's experience. They examine products before export using reflectosopes and ensure our facilities conform to ISO 9001 and ISO 14000 certification standards. The products was tested by third party(INTERTEKS, SGS), meet REACH’S regulations.
Our company adheres to “Quality first, Customer first” philosophy, in line with “The good faith management” principle of service, looking forward to cooperating with you.
- Q: Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
- Why the temporary building interior lime mortar plaster, a period of time after the wall generally cracked?
- Q: Plastic window is how to do ah?
- Plastic co-extruded profiles to achieve the integrated production of sealing strips and profiles, significantly improved the plastic doors and windows of the watertight, air tightness and anti-aging, anti-permeability, to overcome the steel doors and windows in the production process after the sealant There are shrinking, seams and other defects, not only for the steel doors and windows assembly business to save the assembly process and time, but also reduces the cost of materials, greatly improving the production efficiency.
- Q: What is the size of the doors and windows of the building? Like M1021 or C1520 height is from the amount of the above? What about the above beams?
- M1021 said the rear frame set aside the size of the doors and windows hole 1000 * 2100, the installation of doors and windows, the hole and the door frame between the frame there is a thickness of about 1cm gray strip, when used in the wall plaster embedded window frame The The actual door frame size is 980 * 2090 doors and windows height does not include the beam height. Therefore, with or without beams, does not affect the size of doors and windows. Look at the map to understand
- Q: Plastic window around the gap with cement plug or foam plug?
- For the gap between the box and the wall of the filler and surface treatment requirements in the "Building Decoration Construction Quality Acceptance Specification (GB-2001)" Article 5.4.7 states: "Plastic door frame and the gap between the wall should be used Closed hole elastic material filled full, the surface should be sealed with sealant sealant should be bonded firmly, the surface should be smooth and smooth, no cracks. 2. According to "plastic doors and windows installation and acceptance procedures (JGJ103-96)" Article 4.2.11.2 provides: insulation, sound insulation window, the hole between the inside and the window frame should be used to fill the cement mortar smooth; when the plaster , The sheet should be used to temporarily remove the plaster layer and the window frame, the thickness should be 5mm, plaster surface should be beyond the window frame, the thickness of the fan does not affect the opening is limited (see " Node graph). To be outside the plaster layer hardened, should remove the sheet, and the caulking paste into the plaster layer and window frame gap. Insulation, sound insulation requirements of the higher project, between the inside of the hole and the window frame should also be used to seal the seal. 3. Also in the "plastic doors and windows installation and acceptance procedures (JGJ103-96)" Article 4.2.10 of the provisions of the filler more detailed: window frame and the hole between the expansion joints should be used in closed cavity foam, Foam polystyrene and other elastic materials layered packing, packing should not be too tight. For insulation, insulation requirements of the higher level of the project should be the use of the corresponding insulation, sound insulation material stuffing.
- Q: What are the main flaws in wooden doors and windows?
- Doors and windows of the function of breathable, beautiful. Wooden doors and windows if it is to do outdoor doors and windows, it should be considered, the first is a permanent time will be faded wood rot, the second is the seal, the third is waterproof, the fourth is the wind resistance. If it is indoor, it is mainly to consider fire.
- Q: After the renovation of the wooden door frame and wooden window frame stained with a lot of latex paint, although after several wiping, or a lot of traces of little bit of trace, there is no good way to be able to clean the wooden doors on the window frame Latex paint, and do not hurt the wooden doors and windows of their own paint and wood surface! Jiqiu solution, it is best to have tried the method, if the solution method, be grateful! More
- 1, wipe the dry latex paint, and then use a paint scraper gently scrape dry paint. Wipe stains with a cloth or sponge dipped in warm soapy water. 2, another effective way is to use 1 tablespoon oxalic acid and 0.5 liters of water mixed into a solution, and then wipe the stain with a cloth dipped in the solution. Finally, dry the area and wax it as needed. WARNING: Oxalic acid is toxic and should be used with rubber gloves and be careful. 3, directly to the professional cleaning company to clean up.
- Q: Living in high-rise window how to install screens
- The box, the air slot, the bottom of the assembly is good, and then use six screws to twist it into a square box. The screen on the installation site, pay attention to the left and right wind and the door frame frame to the left and right symmetry, bottom position from the door frame frame to be about 5cm below, put the left and right with the clip to live, so that can not move. With drill with 3.2mm drill bit in the door window frame inside the puncture. According to the need in the left and right air groove and below the bottom of the corresponding place marked 6 to 14 eyes, and then screw the screw is installed.
- Q: What is the scale of the doors and windows? Please thank you very much
- Door and window scale refers to the production of window frames and doors and windows, according to the size of the doors and windows or decorative requirements, the design drawings to reduce the size, such as left and right by 2 cm, up and down 3 cm, doors and windows when the size of the size of processing The
- Q: Doors and windows should be used to set aside the hole to install, do not use the edge of the installation side of the mouth or the first installation of the construction method What is the meaning, which can explain in detail
- 2 can only be the installation method is different from the actual measurement of the end of the gray processing of the installation of the expansion screw installation ~ no plaster is the size of the doors and windows is smaller than the hole 20MM has a fixed connection
- Q: Living room bedroom 1 meter yellow bedroom 2 ground are beige. Q: What are the colors of the doors and windows frame? More
- With a light color with the comparison, such as made of white.
Send your message to us
Good Quality PVC Door Frame TCF220A
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches