• Fast Erection Tower Cranes Construction Tower Crane High Quality System 1
  • Fast Erection Tower Cranes Construction Tower Crane High Quality System 2
  • Fast Erection Tower Cranes Construction Tower Crane High Quality System 3
  • Fast Erection Tower Cranes Construction Tower Crane High Quality System 4
Fast Erection Tower Cranes Construction Tower Crane High Quality

Fast Erection Tower Cranes Construction Tower Crane High Quality

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
4T
Maximum Lifting Height(M):
35
Rated Loading Capacity:
4T
Span:
35
Rated Load Moment:
35

Brief Introduction:

 

1.Overall haulage with only a 5t vehicle for whole machine transportation. Haulage size can smoothly pass all standard bridge and culvert.
2.After quick erection, it can start working normally within one hour.

 

3.Correctly-positioned mechanism kinematics spacing.
4.High precision and reliable load moment limiter and load lifting limiter.
5.Special system: wheelbarrow persist axis break
6.Two purpose: arm-brace fixing and orbit walking
7.Overall haulage bridge can be easily altered into a transport tow (10t)
8.35m height and could be used 30 degree higher up

 

9.Crane body locked automatically, crane jib docked automatically, pulley at jib point positioned automatically. There is no artificial high-altitude operation through the whole erection and dismantling process.


Max.Lifting   moment

40   tm

Lifting   capacity

4   Ratio

411m

1136m

4.0t

4.01.1t

2   Ratio

421m

2136m

2.0t

2.01.1t

Lifting   speed

Ratio

α=2

α=4

ton

2

1

4

2

m/min

024

029

012

014.5

Slewing   speed

00.65r/min

Trolleying   speed

20/30m/min

Erect   Height

30.9m

Working   temperature

-20℃~+40

Total   power

24.9KW

Lifting   mechanism

Motor

Model

YEJ160M-4

PowerkW

11

Speedr/min

1460

Uplifting   mechanism

Motor

Model

YEJ100L2-4

PowerkW

11

Speedr/min

1430

Slewing   mechanism

Motor

Model

YLEW112L-55-6B1

MomentN.m

55

Trolleying   mechanism

Motor

Model

YDEJ100L-4/6

PowerkW

2.2/1.5

Fast Erection Tower Cranes Construction Tower Crane High Quality

Fast Erection Tower Cranes Construction Tower Crane High Quality

Fast Erection Tower Cranes Construction Tower Crane High Quality

Fast Erection Tower Cranes Construction Tower Crane High Quality


1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   


Q: how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q: i probably sound like an idiot asking this question :Pis it electricity? fossil fuel burning involved? pulleys? how does the pulley work? any human power involved? specifically, how is it stupid to lift a chair that can be lifted by a person, with a crane?
A crane is a pulley and using simple machines like wedges, screws, pulleys etc. takes less work.
Q: crane wreak during stadium construction
Big Blue: January 20, 2000: Video of the Big Blue crane accident that happened in the Brewer's Ball Park Stadium on July 14, 1999 in Milwaukee, Wisconsin. Three men lost their lives in the accident. Although the video is only 1 minute and 10 seconds in length, seeing it is an experience you won't soon forget.
Q: Tower cranes should stop working when the wind speed is greater than the magnitude.
Rules for safety regulation of tower crane,The installation of tower crane is strictly prohibited at grade 4 or above
Q: how do they get cranes on top of building sites?
It's crazy but they actually use the crane to build itself!!!
Q: How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions should be carried out, design calculation and drawing the map produced and written instructions; the attachment device and embedded parts shall be the original component manufacturer or made with the corresponding ability of the enterprise; the attached device design, the main structure of the building to support the checking.The regulations on the supervision and administration of the safety of building cranes (Ministry of Construction No. 166th) states: "it is prohibited to install the standard sections and attachments of non original manufacturing plants on the free construction lifting machinery.".The independent height of the tower crane is determined by the manufacturer's manual. The independent height of the tower cranes of different manufacturers and different types is different. The installation of the tower crane needs to be installed with a wall rod. The specifications are stipulated in the instruction. The national standard requires the instruction of the manufacturer's manual.
Q: In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
Q: do they start with the crane house and keep adding sections underneath it? Or do they build they tower and then somehow top it with the actual crane?
As described above, but the crane that is being used in our plant arrived in 80 semi truck loads!
Q: What is the most widespread animal Kung Fu style in the world?
MONKEY!!!! Considering how many people's only exposure to Martial Arts is Monkey Magic you'd have to go with MONKEY! style.
Q: Does anyone knows where could I find this book online and free ? I would love to read it from my tablet or computer
Juan carlos Have no idea, but I see an answer where it looks like you got the help you need. Do not give me Best An-So. Best Wishes to you

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords