• Exterior wall cladding System 1
Exterior wall cladding

Exterior wall cladding

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

  • Type:Other Plastic Building Materials

  • Model Number:VD100201
  • Color code:VDC111

  • Material:Polypropylene Composite

  • Main Excellence:Rich in colors,neat in lines. Moisture+Corrosion+Ageing resistant.

  • Test report or certification:SGS or CE

Packaging & Delivery

Packaging Details:17pcs/box, carton size:113*48*29.5cm
Delivery Detail:15-20days

Specifications

Interlocking panels can give you a realistic brick looking, the installation is easy just like vinyl siding installation

Faux brick exterior wall cladding is an ideal way to create the look and beauty of brick without the time, cost and long installation process of actual brick. The panels can enhance many types of residential and commerical projects. Easy to clean and easy to install.

Specifications of Nailon Brick Exterior Wall Cladding:

Model

VD100201

Style

Stone

Color

VDC111.  white color

Type

Panel

Edge Type

Interlocking

Line

Nailon

Material

Polypropylene composite

Overall Dimensions

112 cm wide*47cm high*2.2cm thick

Coverage Dimensions

100cm wide*45cm high

Brick Dimensions

/

Coverage

0.5264sq. m

Weight

Approx 3.7kg/sq. m

Exterior Use

Weather proof, near zero UV degradation

Interior Use

This product is made out of polypropylene and has a Class C fire rating. If you wish to have a better fire proof property, we could enhance it with special formula

Main Accessories

Start strip, decorative strip, exterior corner, interior corner

Production time

15-20days

Sample

Free sample at most 6 panels, but freight collect

P.S.

1. The weight are approximate, sometimes the raw material and the formulation differs.

2. For samples, we can at most offer one piece per design. We can cut small pieces if needed.

3. We have color chart for you to choose color

4. Besides polypropylene, we have added some other special chemical accessory materials to enhance wall panels with a very good weather resisting property (+60°C to -50°C)

Q: Curtain wall design drawings need to be registered Structural engineers stamped
This is a job process problems, many units are not the same !! This thing, see a company's provisions ah
Q: The difference between component glass curtain wall and all glass curtain wall
The mantle (or beam) of the frame (component, component) curtain wall is first mounted on the main body structure, and then the beams (or mullions), mullions and beams are arranged to form the grid. The panel material is machined into the unit , And then fixed in the mullion and beams composed of the grid. The load on the panel material unit components is transferred to the main body through a mullion (or beam). The more common form of the structure is: the mullion and the beam are installed in the field after the formation of the box after the panel material unit components fixed to the skeleton, the panel material unit components vertically on the column, the horizontal convergence on the beam, and sealed Adhesive treatment, anti-rain penetration, air penetration. Frame type (component type) curtain wall main features ? 1. Construction means flexible, more mature technology, after more engineering practice test, is the use of more curtain wall structure. ? 2. The main structure adaptability, the installation sequence is basically not affected by the main structure. ? 3. Sealant sealing treatment, watertight, good air tightness, with good insulation, noise noise reduction, with a certain anti-layer displacement ability. ? 4. Panel material unit components factory production, structural adhesive use performance is guaranteed. ? 5. A large number of installation process on-site, requiring on-site management workload. ? 6. Sealant construction requirements of strict, pre-cleaning, glue the process of high quality requirements of workers; installation of plastic control points and more processes require high quality management. In my opinion, the whole glass curtain wall is a component of the curtain wall, component curtain wall mullion, the panel is composed of glass material is full-wave curtain wall.
Q: what is the standard thickness for curtain wall?
add it up: 3-1/2 for the 2x4 1/2 drywall on each side equals 4-1/2 wow that was hard
Q: Hello,Im trying to design a building and it is supposed to have a large curtain wall (length 36m and height 5m). I understand that the panels can be framed (with mullions clearly visible) or bolted together (mullions not visible). I would like to be able to swing open some of these panels to form windows. If this is possible, what is it called and how is it possible to do all the attaching and bolting?
You can have operational windows in a curtain wall. Call them vents, hoppers, bump-outs; there are various names for these types of windows. They are pretty much self contained window units that are inset into the curtain wall framing. The weight will depend on the material really. As well as the glass placed into it, and the operable window units. Might check the Kawneer, Vistawall, YKK websites for ideas.
Q: Im wanting to paint my boyfriends kitchen red. He has a black table and black appliances. The kitchen connnects to the grey living room. I was thinking about black curtains but I dont want the room to feel small and dark. Suggestions?
White okorder
Q: I have a front room that is more like a three seasons room and it has windows across three of the walls with no break in between. I have sheers on the outside and chocolate brown on the inside for privacy. In the warmer months Id like to tie back the curtains to allow more light in but there isnt a place I can screw traditional tie backs into? I need more of a free hanging tie back, looking for ideas because I can figure out how to make it.
You could use a light weight band or cord, and just pin it to the back of your curtain. You'll then have the curtain gathering in the center of the window.
Q: Stone curtain wall need to detect what is the thing
Need to do field experiments are: (1) post-embedded parts of the on-site drawing test, the number of extraction should be taken according to the provisions of the standard random sampling according to law; (2) silicone structural sealant peeling test, the number of extraction for each 100 components extracted 1; (3) If the use of two-component silicone sealant, should also be mixed (butterfly) test and pull off (plastic cup) test. The same type to do a group can be; (4) water test, all carried out;
Q: The comforter has yellow details on it.
try a eggshell lacy look or a victorian colors.
Q: What was the Berlin wall and the iron curtain?
Berlin wall was a wall that seperated East Germany from West Germany. The Soviet Union (Russia) controled East Germany while the US and other allied nations controlled the west. Iron curtain basically described the Russians and how secrative their operations were
Q: I now want to develop from the curtain wall designer, but do not know from that step to start, because before have not come into contact with the curtain wall designers to do something, how to do, to understand what aspects of things,
Curtain wall designer main task: 1, first of all to be familiar with, understand the drawings. 2, building plans and tenders (curtain wall) for comparison, found in the place with the structure does not match the problem. 3, to deepen the design, to solve the inconsistent structure, inconvenience to the construction of the problem. 4, with the construction site to measure the staff to communicate with the line, the site will be compared with the construction drawings, and according to the site construction size adjustment. 5, in the field size feedback, the material under the single. 6, on the spot construction encountered some of the drawings are not clear details of the node to deepen and deepen the node, to guide the construction site. 7, in the field construction is completed, arrived at the scene according to the actual size of the scene, the completion of the measured map, drawing. 8, out of the completion of plans.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords