Decorative Comento Glazed Porcelain Tile
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 200 Square Meters m²
- Supply Capability:
- 5000 Square Meters per Day m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.glazed porcelain comento tile
2.comental tile
3.600x600mm
4.Thinkness:about 9.5mm
5.CE/ISO9001
New popular project tiles: decorative glazed porcelain comento tile
Type: Tiles |
Place of Origin: China |
|
Model Number: CM60B |
Size: 600 x 600mm |
Material: Porcelain Tiles |
Usage: Interior Tiles |
Function: Acid-Resistant, Antibacterial, non-slip |
Surface Treatment: Rustic Tiles |
Technique: Comental Tiles |
Color Family: white, beige, black,grays |
Tile Type: Floor Tiles, Wall Tiles |
Material: Porcelain |
Material Feature: Antibacterial |
Feature: rustic |
Shape: square |
Style: Natural |
Special Features:glazed |
Usage: Floor and Wall |
Color: white |
Thickness: Above 10mm |
Water absorption: about 1% |
|
|
Packaging Detail: |
Cartons packing and Wooden pallets |
Delivery Detail |
Within 15 days after receive the deposit |
Our company through ISO9001: 2000 international quality system certification, product access to China's environmental protection product certification, 3C certification, so that a strong guarantee of product quality, the products are exported to overseas, selling river north and south, have full access to the market's positive.
- Q:What is the history of cement? How is it manufactured? What are the types of cements?My nephew wants to be a cement man in the future, and needs those info. He needs my contacts to help him evaluate if he actually likes the cement man idea in particular and the cement industry in general. Thanks for your help.
- I found two very good sites. The first one has a brief but informative history as well as details on aspects of the current cement industry. The second one is very detailed on the manufacturing of cement and includes its own history as well.
- Q:water pipe burst, put new pipe and cleaned and put on PVC cement, What is recommended time to dry before tyurning on water?
- Rubber Cement Drying Time
- Q:Has a body ever been found with cement shoes?
- I don't think I've ever heard of one being found .... but here's my thoughts on it. If you're dumping a body with cement shoes you wouldn't want to be close enough for them to find it. And if you do sink a body you'd be hoping that the sharks and flesh eaters would tear the body apart making it difficult to find a body intact. So maybe on the bottom of the ocean is a cement container with some feet in them. But perhaps after a while the sand goes over the container and no one pays attention to it and the bones come apart and get tossed out of the container anyway so the evidence of the body in cement shoes is no longer apparent. I'm not saying any of this is true but .... who knows for sure!
- Q:what are the types of cement availabale and give their applications?
- We have now wooden floors in our place of work, it is difficult to revive the shine to a stupid surface one way or the other with a long time then, i might alternatively go for carpeted or marble ,carpeted make me suppose comfy and marble add magnificence to the space,moreover, marble is handy to wash to some extent.
- Q:I want to build a room in my basement.I am just doing the research.how does the bottom 2x4 connect to the cement floor ?also, for the wall, how far apart are the studs ?
- The 2x4's are fastened with a nail gun using concrete nails. There is also a strip of black felt under the 2x4. I would measure the room and determine whether to use 16oc or 24 oc studs for door placement.
- Q:a small block of cement cost. Our driveway needs to be fixed, a 4x4 block has to be re poured.
- Thats only 16 Sq. Ft. The problem is you will pay a high price for this small area because of the mobilization costs. I say around 200-250 dollars at a min. jock
- Q:I NEED to know the cost of a certain amount of cement, if i am building a patio that needs to be about 25ft.9in.(length)x26ft.(width) how much would it cost, it should be about 2 inches thick. It would be a huge help if you could find this out for me, please get back to me as fast as possible.
- First of all, you want concrete, not cement. Second, two inches of concrete isn't thick enough, it will be cracking to pieces within a year. Better to make your forms out of 2x4s, giving you a 3 1/2 thick slab. Use wire mesh also. That being said, a two inch slab will take 4 cu yd of concrete. If you go the 3 1/2 route, you will need 6 1/2 cu yd. The cost will vary depending on source, location, delivery, etc. but roughly you can figure $100 / cu yd.
- Q:He is putting in new counters and he is stuck. Please, your answer should be something normally kept in a kitchen and within reach of a penninsula. Your choices are coffee accessories, baking items, grill utensils and a toaster.
- Hm. I think he should just stay stuck until you get home from work to teach husband a lesson about getting stuck while playing with concrete. Then, on your way home, stop by a construction site and pick up a jackhammer and get him out of there with that. Maybe he'll learn to call a professional next time. Silly men. But, if that won't do and you REALLY want him out of there, I'd say a butter knife, a pair of tongs, and some butter or cooking oil might get the job done.
- Q:Is there a defoamer for building cement? What is it? Is there an introduction?
- Yu Heng chemical cement defoamer is the latest patented technology research and development, is modified mineral oil and other components of the defoamer synthesis
- Q:Brick factory construction period to buy the building materials (no inventory, purchase directly with, including cement, steel, red brick, etc.), to pay the construction of the bite for the shame of the peacock spring pseudo-sickle fee (including the artificial materials, ), Land rental rent, resource tax, arable land occupation tax, stamp duty, wages, electrical equipment, purchase forklift forklift, digging machine forklift plus diesel fuel, blasting costs, building materials and freight, rent office, purchase Office furniture, staff wages, the purchase of "screw. Welding. Drill. Wire. Wire. Taps. Wood. Meter" and other small tools of these expenditures, the "construction in progress" subjects set what the name of the secondary subjects as well, Or what other subjects? How to distinguish the details of the details of the details of some of the Oh, thank you, or more detailed advice.
- This account is used to calculate the expenses incurred in infrastructure construction, renovation and other construction projects
1. Manufacturer Overview |
|
---|---|
Location | Hebei,China |
Year Established | 2006 |
Annual Output Value | Above US$15 million |
Main Markets | Asia, Middle East |
Company Certifications | CE, CCC, ISO90001 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | Tianjin |
Export Percentage | 0.3 |
No.of Employees in Trade Department | 4 People |
Language Spoken: | English;Chinese;Arabic |
b)Factory Information | |
Factory Size: | Above 10,000 square meters |
No. of Production Lines | 3 |
Contract Manufacturing | OEM Service Offered;Design Service Offered |
Product Price Range | Average |
Send your message to us
Decorative Comento Glazed Porcelain Tile
- Loading Port:
- China Main Port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 200 Square Meters m²
- Supply Capability:
- 5000 Square Meters per Day m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords