• Cuplock System Omega Transom System 1
  • Cuplock System Omega Transom System 2
  • Cuplock System Omega Transom System 3
Cuplock System Omega Transom

Cuplock System Omega Transom

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

48.3 diameter x 3.2 thick high grade steel

Lower fixed cups at 500mm centres

Top cups allow 4 components

Horizontals locate in bottom cup of standard

Forged blade ends for strength

Nanjing Guhua Metalwork(NGM) Co., Ltd., located in Xiongzhou Industrial Park Luhe District, was established in 2003. NGM is a diversified private enterprise specialized in pressed, drop forged, casted and sheet metal items production as well as trading and logistics. The company covers an area of 25,000 m2, possesses standard factory of 6000m2 with fixed assets of 18 million RMB and 150 pieces of specialized equipment and over 200 employees. So far, NGM has been always committing great efforts on internationalization and stability of quality. The company strictly implement ISO9001:2008 international quality system and was continuously awarded as AAA credit enterprises in 2005 and 2006.

our company is a professional scaffold & couplers  manufacturer with year’s experience. We work for the based items(Stamping, fabrication and machining) and get the best price for some other parts from our 200 qualified supplier, these allow us have been providing to our valued customers from overseas(U.S., U.K, Australia, Canada, Germany, France) the following benefits and advantages:
Competitive pricing with good quality.
Turn-key solution to procurement of different types of components.

Q:What is an integrated climbing frame? What are the works? What are the advantages
And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
Q:The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q:The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:Advantages and disadvantages of climbing frame and floor type scaffold
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).
Q:What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords