Cup Locked Scaffolding with High Effective Supporting System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffolding
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
.Not easy to lose fastener, portable firm and easy to maintain and transport
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar
.5 times fast of adapter plug assembly and disassembly than normal
.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage
5. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q:Bowl buckle type steel pipe scaffolding vertical pole bowl button node by what composition
- The utility model relates to a bowl buckle joint which is composed of an upper bowl buckle, a lower bowl buckle, a cross bar joint and a limit pin on the upper bowl buckle. A limiting pin is arranged on the vertical rod to weld the lower bowl buckle and the upper bowl buckle. Welding plug on the bar and the diagonal bar. When the utility model is assembled, the transverse rod and the inclined rod are inserted into the lower bowl buckle, and the upper bowl buckle is pressed and rotated
- Q:Please tell me which book is on the way. Then in the specific description of the horizontal spacing, vertical spacing and step how to distinguish between a little confused
- Scaffolding (scaffold) refers to the construction site for the workers to operate and solve the vertical and horizontal transport and erection of various stents. The general term of the construction industry, refers to the construction site used in the external walls, interior decoration or high level can not be directly construction
- Q:It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
- I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
- Q:does it hurt more than just getting your lobes pierced or the same?i just got a my ears pierced (so now i have two lobe piercing on each ear) it didn't hurt.i'm not sure if i should get it or not.
- It is one of the more painful ear cartilage piercings and, as such, hurts more than getting your lobes pierced. It's also much more difficult to take care of. BTW: I love your Andy Warhol avatar. He's my favorite artist.
- Q:i need help with the musical elements of these songs, such as the instrumentation, rhythm, texture, timbre and key. thanks
- Here is a good bibliographic index:
- Q:what should i do?? i've been washing it and leaving it to heal but im worried about it. i've had the piercing for 9 days now and i only noticed this yesterday. any ideas?
- that means that was piercing wasn't done as well as it could have been. there is nothing you can do about it except take it out, let it heal, and have it re-pierced. go see your piercer. they should be able to tell you if it's a problem, and they should re-pierce it for free.
- Q:Steel tube scaffolding construction labor time? Whether the demolition of construction
- From the first floor to the beginning of the facade plaster. Always have timberman. How many days to look at your building area.Scaffolding steel pipe specifications and construction requirementsScaffold steel pipe specification1-6 m half a meter, the thickness is generally 2.4--2.7 mm diameter is 48 mmGenerally do not deal with the surface, a number of anti rust paint
- Q:Are these pieces similar in their musical representation and programmatic portrayal of death and the supernatural as a serious, dark and sinister experience?
- they are both similar as the both revolve around death
- Q:Tips and advices regarding the piercing or healing process will be greatly appreciated. Thanks:)
- It all depends on where you go. They can range between 25-35 dollars. Just remember to relax and eat a good meal before you go. Healing takes around 6 months to a year. Your piercer will instruct you on how to care for it. Always ask your piercer any and all questions you have.
- Q:I've had my industrial piercing for a long time now, but I was wondering if I could put two 14g tongue rings in the holes. Would that damage them or make them crooked? Also, could I use two tongue retainers? Thanks.
- Stretching shouldn't harm whilst you're giving it sufficient time... so this particularly isn't a good assessment! A single cartilage piercing does not harm plenty extra desirable than your usually taking place earlobe (lobe being 2, cartilage piercing being 3 on a scale of a million to 10). yet i've got on no account had a scaffold or orbital of any sort, so i've got not got plenty first hand experience. easily however i does no longer project approximately it. it particularly is going to be over in 30 seconds, a million minute tops. and you get to return away with a reasonably new piercing! Yay!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cup Locked Scaffolding with High Effective Supporting System
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches