Cup Locked Scaffolding with Excellent Stability
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffolding
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.
It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
.Not easy to lose fastener, portable firm and easy to maintain and transport
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar
.5 times fast of adapter plug assembly and disassembly than normal
.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage
5. FAQ of Cup-lock Scaffolding
1) What can we do for you?
We can ensure the quality of the vinyl banner and avoid extra expenses for customers.
.We can provide you the professional design team.
.We can provide fashionable and newest styles for you.
.We can design the artwork for you.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.
. If printing required, please advise asap because the whole set need much more time to complete.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale service?
. Response will be carried out in 24hours after receiving any complain or request.
. Frame-Connected Scaffolding cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.
- Q: It's indoor. A night-job in a mall so it should be easily assembled/disassembled. What we use is the thin piped one which is too dangerous for 12 meters high.
- I don't know what you have to do and with how many people, but in case of easy assembly/disassembly, I'd recommend an Aerial work platform.
- Q: A 105 kg scaffold is 6.2 m long. It is hanging with two wires, one from each end. A 520 kg box sits 2.2 m from the left end. What is the tension in the right hand side wire?(g = 9.8 m/s2)
- assuming the 105 kg scaffold is uniform taking moment abt left end T * 6.2 = 105 *g * 3.1 + 520 g *2.2 T = 2322.76N answer tension in the right hand side wire
- Q: Please tell me which book is on the way. Then in the specific description of the horizontal spacing, vertical spacing and step how to distinguish between a little confused
- The pitch is called 'step', 1.2~1.35, 1.8m, no minimum spacing, maximum 1.8m. Vertical rod spacing 1.05, 1.3, 1.55m, no minimum spacing, maximum 1.55m. See JGJ130-2011 "technical code for safety of steel tubular scaffold with couplers in construction".
- Q: The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of posts with the root, the number of bowl buckle on the number of how many?
- Area / (pitch X step) = total root number (no +1, because only estimate)
- Q: I just got my scaffold piercing yesterday, (the bar through the top of your ear) and one side is kind of swelling. Is that okay, or normal?
- this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
- Q: Can the horizontal bar of the bowl buckle scaffold be oblique, the vertical position of the vertical bar is a parallelogram, not square!
- If it is possible to form a honeycomb hexagon (with an angle of 120 degrees)
- Q: is both 1 m farm from the scaffold. if the boeard is 20 kg in mass, how close to the end can the painter stand w/out tipping the board over?
- 1.692m, but you should have included a diagram, I am still not sure if you are talking about a cantilever force couple or a simple lever pivot..
- Q: How Much would it cost to Scaffold a Detached Dwelling, 23m x 8.4m...Roughly?
- I had a detached 4-bed house surrounded (soffit and barge boards to do) by scaffold to a high standard for ?180 in Kent. Two weeks hire, assembly and dismantle included (they left it there for 3 weeks in fact). Pay more than 200 outside and you're being ripped-off...
- Q: What does it mean in the phrase that one can have toxic people in their life and still maintain stability as long as we build a scaffolding?
- As long as you have a firm structure of friends and family around you (like scaffolding round a construction site or building) you can withstand the presence of harmful, toxic people.
- Q: ~ I was thinking about getting it done for my 16 birthday. BUT I wanted to know how bad does it hurt???And if I do get it done is it best that.... I go to a tattoo shop to get it??
- sure i could deliver it a five out of 10. good valued at it! For american citizens that do not recognise.... she is speaking approximately an business piercing it is known as a scaffold piercing within the UK.
Send your message to us
Cup Locked Scaffolding with Excellent Stability
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 m²
- Supply Capability:
- 100000000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches