• CSA Concrete Urgent Repair Materials System 1
CSA Concrete Urgent Repair Materials

CSA Concrete Urgent Repair Materials

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
20 Tons m.t.
Supply Capability:
1000000 Tons per Year m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

CSA concrete urgent repair material have a good performace in working with rush-repair works,urgent projects,concrete repair

 

 

It Urgent Repair Material is obtained by special Rapid-hardening Sulphoaluminate cement with composite special admixture, this product has passed appraised science and technology achievement by Hebei province ,got success apply in Haerbin Airport ,Mudanjiang Airport for road surface urgent repair.

 

Properties:

1.Special applicator was not necessary while operating,, just need mixed repair material, sand and crushed stone with water in designed ratio, so convenient for operating.

2.This product can ensure working life more than 20mins with a higher strength. From mixing, concrete road surface resume working just need 4 hours, so it is an ideal urgent repair material for airport and expressway, etc.

3.For based on special rapid-hardening sulphoaluminate cement, this product have excellent sulfate-resisting and seawater, also can avoid the damage from alkali aggregate reaction.

4.Low rate of batch water with its slight expansion make this material have a high degree of compaction beside excellent capacity about breeze-thaw resistance and salt.

5.Excellent adhesive is to make the interface between new and old concrete firmly bond.

 

Using methods

1.Working surface should be a rigid and need watering before repaired, meanwhile, clear the contaminant and ponding of water.

2.According to the mix proportion of Cement based material/sand/crushed stone/water=1/1.5/1.5/0.27-0.3,and the water can be adjusted by actual demand.

3.Cement based material should be added with admixture while mixing, then feeding the mid-sand, crushed stone and water, stir for 5mins better.

4.Using in negative temperature environment, it should be use hot water and feeding turning should be according to sand first, then crushed stone and water, with the binder last. Adjustment of water temperature should be controlled well to ensure placing temperature is higher than 5°C.

5.Select the clean water accord with TGJ63 standard of concrete mixing water beside accord with the JGJ standard of medium sand and crushed stone.

 

Notice:

1.Water, sand and stone should be neutral while they are sensitive to acid and alkali.

2.The workability should be adjusted by special admixture, it is prohibited from adding water to improved concrete performance.

3.Strength development is closely relevant to the temperature, it’s need choose suit product according to working temperature.

4.the product should be used out within working life, while prohibited mixing again for using.

5.From mixing with water within half an hour, compacting the repair concrete with a vibrator and screed surface, It is prohibited vibrating after concrete losing its fluidity.

6.While using in a low temperature environment, it should be covered and curing for a long time.

 

Package and Storage:

1.There are two bags with basic material and special admixture packed by carton.

2.Shelf life is six months.

3.The product should be stored in dry place, far away from wet and used up after opened.

 

Q: It's for my Science hw....
As someone who manages hazardous waste shipments. It is not considered flammable, or explosive. It I considered poisonous Because it contains silica
Q: Trivia question:: If trees are for humidity -- water is for moisture - what is cement for?
Cement is for hardenng things togther.
Q: i would like to know how the cement grade be checked? kindly let me know what other test can be done to know the quality of cement?
Don't usually check the portland cement, usually you test the concrete mix to assure it gives you the strength you desire. This is usually done with actual breaks of cylinders made from the mix you want to use, done before the mix design is approved. Then, additional cylinders are cast while placing the concrete and tested at intervals over a 28-30 day period to make sure the concrete strength meets your requirements. The exact number of cylinders is usually decided by the owner or engineer, based on the amount of concrete poured at one time. The minimum number of cylinders is usually 3, one to break at 3-7 days, one to break at 28-30 days, and one spare.
Q: I need a list of cement, concrete and aggregates Public companies the most important ones or largest Co.!
So. Ca. Riverside Cement on Cedar in Bloomington Also in Oro Grande California on D st California Portland Cement in Colton The biggest cement company is Cal Mat on Riverside Ave in Fontana Ca. They have plants all over the country I use to haul bulk for these companies. Hope this helps.
Q: What are the cement models, what are the general buildings on the use of cement?
Portland cement strength grades are divided into 42..42.5R, 52..52.5R, 62..62.5R six grades. Ordinary Portland cement strength and other snails to touch the burglary Du Guizhen enlightenment score is divided into 42..42.5R, 52..52.5R four grades. Slag Portland cement, volcanic ash Portland cement, fly ash Portland cement, composite Portland cement strength grade is divided into 32..32.5R, 42..42.5R, 52..52.5R six grades.
Q: I need to semi-permanently hang items on a cement wall. What is the best way to go about doing so?
Hook and loop (velcro) tape. Glue one side to your item, and one side to the cement....larger pictures will need tape around all four edges to be secure, but it does work - I've done it before. Hope this helps. Good luck!
Q: I'm tiling a kitchen w/ a plywood subfloor. Is that metal lath reasonable to use or do I need to apply a cement board?
We usually use cement board. It has marks for screws.
Q: A bag of cement weighing 350 N hangs in equilibrium from three wires as suggested in the figure below. Two of the wires make angles θ1 = 61.0° and θ2 = 41.0° with the horizontal. Assuming the system is in equilibrium, find the tensions T1, T2, and T3 in the wires.T1 = T2 = T3 =
The tension in the third wire is equal to the weight of the bag of cement. The sum of the vertical components of the tension in each of the other wires is equal to the tension in the third wire. So, the sum of the vertical components of the tension in each of the other wires is equal the weight of the bag of cement. Vertical component = T * sin θ For the left wire, vertical component = T1 * sin 61 For the right wire, vertical component = T2 * sin 41 Eq#1: T1 * sin 61 + T2 * sin 41 = 350 Since the system is in equilibrium, the magnitude of the horizontal components of the tension in each of the other wires is equal. Horizontal component = T * cos θ Eq#2: T1 * cos 61 = T2 * cos 41 T1 = T2 * cos 41/cos 61 Substitute (T2 * cos 41/cos 61) for T1 in Eq#1, and solve for T2. T2 * cos 41/cos 61 * sin 61 + T2 * sin 41 = 350 T2 * (cos 41/cos 61 * sin 61 + sin 41) = 350 T2 = 350 ÷ (cos 41/cos 61 * sin 61 + sin 41) = 173.4741944 N This is approximately 173.5 N Substitute 173.4741944 for T2 in Eq#1 and solve for T1. Eq#1: T1 * sin 61 + 173.4741944 * sin 41 = 350 T1 = (350 – 173.4741944 * sin 41) ÷ sin 61 = 270.0495844 N This is approximately 270 N. To check this answer, substitute both answers in Eq#2: T1 * cos 61 = T2 * cos 41 270 * cos 61 = 173.5 * cos 41 131 = 131 This proves that the tensions are correct! I hope that my work has helped you understand how to solve this type of problem.
Q: The wind knocked over part of our wood fence. Two of the wood posts that were cemented into the dirt were uprooted. I figure the best way to fix the fence would be to use new posts (or bust off the old cement) and bury them in the ground with fresh cement. I'm feeling lazy and wonder if I do as good of a job just burying the old posts with the old cement back into the ground. Will it hold? Maybe this is a no-brainer for some folks - useful comments appreciated.
Plywood will rot. Build a form out of 2 X 4's or 2 X 6's around the whole thing and then put an inch cap over the whole thing. Then this in turn will fill the hole and you will have a nice flat surface. If you want to patch it you have to take the old concrete out that is lose all the way to the subgrade then pour a patch but doing this you will still allow a small seam to allow moistuire to get in if it freezes it will pop it up. So the best thing to do is to add a lip of one inch above the whole thing. You will also have to break lose any loose concret e and remove before doing the whole lip. Also put a broom finish on top and this will allow moisture to run off of the concrete.
Our company has our own research organization-cement and concrete research lab, which is fully equipped with up-to-date facilities. Our products have been exported to South Africa, Australia, the United Kingdom, Korea, the United Arab Emirates and Taiwan Area.

1. Manufacturer Overview

Location Hebei,China (Mainland)
Year Established 1998
Annual Output Value US$2.5 Million - US$5 Million
Main Markets North America; South America; Eastern Europe; Southeast Asia; Africa; Mid East; Eastern Asia; Western Europe; Southern Europe; South Asia
Company Certifications ISO 9001:2000;ISO 14001:2004

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a) Trade Capacity
Nearest Port Xingang, Jingtang
Export Percentage 21% - 30%
No.of Employees in Trade Department 11-20 People
Language Spoken: English, Chinese, Japanese, Russian, Korean
b) Factory Information
Factory Size: 1,000-3,000 square meters
No. of Production Lines
Contract Manufacturing OEM Service Offered Buyer Label Offered
Product Price Range Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords