• Concrete Pump Delivery Bend with Flange Ends System 1
  • Concrete Pump Delivery Bend with Flange Ends System 2
  • Concrete Pump Delivery Bend with Flange Ends System 3
Concrete Pump Delivery Bend with Flange Ends

Concrete Pump Delivery Bend with Flange Ends

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 pc
Supply Capability:
2000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Delivery Bend with Flange Ends

 

1.   Structure of Concrete Pump Delivery Bend with Flange Ends:


Concrete Pump Delivery Bend with Flange Ends is used on concrete pump pipeline for concrete delivery which is much bigger than concrete elbows. It is made by St52 seamless pipe. Now its main structure is as follows;


Material: ST52, 45Mn2 etc.

Flange: ZX, F/M elbow

Size: DN125 etc.

Working Capacity: 25000-45000cbm

Degree: 90, 60, 45, 30 etc.

 

 2.   Main Features of Concrete Pump Delivery Bend with Flange Ends:

 

• High Wear-resistant, long service life, lower cost

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Ensure the supply of ancillary parts

• Our company passed the ISO9000 certification, the product through 3C certification in full compliance with national standards.

 

3.  Concrete Pump Delivery Bend with Flange Ends Images:


Concrete Pump Delivery Bend with Flange Ends

Concrete Pump Delivery Bend with Flange Ends

Concrete Pump Delivery Bend with Flange Ends



4.  Concrete Pump Delivery Bend with Flange Ends Specification:

 

Name

Concrete pump clamp   coupling/elbow/pipe/spare parts/gasket

Standard

Schwing, Putzmeister, Kyokuto, Cifa,   Sany, Zoomlion.

Type

90O, 60O, 45O,11.5O DN125 {5”}--DN150(6")

Radius

R275, R180 R320

Material

Hi-Mn13,ST52(16Mn), 45Mn2,45#steel and   so on

Usage

Used in Concrete Pump outlet in   Construction Work Fit to Schwing and PM, Sany, Zoomlion, Cifa etc.),   which include delivery pipe, elbow, reducer, coupling(clamp), male and female   flange, rubber hose, cleaning ball, wear plate etc. Welcome to contact us for   more information.

finish

Painting, Epoxy or Galvanization

Package

Wooden boxes

 

 

Wear-resistant  Single or Double Concrete Pump Elbow

Type 

Singe   Elbow 

Double   Elbow 

Model

DN125

DN150

DN175

DN125

Material

Casting Steel   ,ST52

Inside 

 40Cr

Outside 

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90°+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90°+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90°+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90°+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45°+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45°+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45°+310

R240*36°

20°Lengthen 



R240*36°

20°Lengthen 

R240*30°

25°+740



R240*30°

25°+740

R240*15°

40°Zoomlion



R240*15°

40°Zoomlion

R385*29°




R385*29°


R315*33°




R315*33°


Technic

Forged


Average life

25,000cubic

50,000cubic

Application

Used in concrete   transport in construction work

 

5. FAQ:

 

We have organized several common questions for our clients, may help you sincerely:

①Is your products exported a lot?

We have exported to many, many countries. Every year we ship more than 30 containers of these spare parts. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.

 

6. Why choose us:

 

•  We are a comprehensive manufacturing and trading company.

•  Our company is one of the biggest manufacturing and trading companies in China.

•  We have been specialized in producing concrete pump spare parts and specialized in producing all kinds of concrete pump parts. As Concrete Pump Pipe, Concrete Pump Elbow, Concrete Pump Rubber Hose, Concrete Pump Wear Plate, Concrete Pump S Valve, Concrete Pump Piston and so on.

•  We are famous for our superior quality, competitive prices, first-class craftworks, safe package and prompt delivery.

•  We have been supplying concrete pump parts for SCHWING, PUTZMEISTER, SANY, CIFA, KYOKUTO, ZOOMLION for 10 years, so we can promise you the quality and best price.

 


Q: How can one identify the correct part number for a specific concrete pump spare part?
To identify the correct part number for a specific concrete pump spare part, there are a few steps you can follow: 1. Check the equipment manual: The first place to look is the manual that came with the concrete pump. It should provide a detailed parts list along with their corresponding part numbers. This is the most reliable and accurate source of information. 2. Contact the manufacturer: If you don't have access to the equipment manual or if it doesn't provide the necessary information, reach out to the manufacturer directly. They should be able to assist you in identifying the correct part number for the specific concrete pump spare part you need. Provide them with as much information as possible, such as the make, model, and serial number of the concrete pump. 3. Use online resources: There are various online platforms and parts catalogs available that provide detailed information about spare parts for different concrete pump brands and models. These resources often allow you to search for the part based on the make and model of your concrete pump. Make sure to cross-reference the information you find with the manufacturer's specifications to ensure accuracy. 4. Consult with a local dealer or distributor: If you are unable to find the correct part number through the above methods, consider reaching out to a local dealer or distributor of concrete pump spare parts. They often have extensive knowledge and experience in identifying and sourcing the right parts for different equipment. Provide them with all the necessary details about your concrete pump, and they should be able to assist you in finding the correct part number. Remember, accuracy is crucial when identifying the correct part number for a specific concrete pump spare part. Using reliable sources and consulting with professionals will help ensure that you obtain the right part for your equipment's needs.
Q: Are there any specific guidelines for the installation of hopper components or agitators in concrete pump spare parts?
Yes, there are specific guidelines for the installation of hopper components or agitators in concrete pump spare parts. These guidelines typically include instructions on proper alignment, securing of bolts, lubrication, and ensuring all components are properly connected. It is important to follow these guidelines to ensure safe and efficient operation of the concrete pump.
Q: How often should concrete pump hydraulic oil coolers be inspected and maintained?
Concrete pump hydraulic oil coolers should be inspected and maintained regularly to ensure optimal performance and prevent potential issues. The frequency of inspections and maintenance will depend on various factors such as the operating conditions, the workload of the pump, and the manufacturer's recommendations. As a general guideline, it is recommended to inspect and maintain concrete pump hydraulic oil coolers at least once every six months or every 500-700 operating hours, whichever comes first. However, in more demanding or extreme operating conditions, more frequent inspections and maintenance may be necessary. During these inspections, it is important to clean the cooler thoroughly and check for any signs of damage, corrosion, or leaks. Additionally, the oil cooler fins should be inspected for any blockages, as debris or dirt can reduce the cooler's effectiveness. Regularly checking and replacing the cooler's air filters is also crucial to maintain proper airflow and prevent overheating. Regular maintenance should include replacing the hydraulic oil and filters according to the manufacturer's recommendations. This helps to maintain the oil's viscosity and prevent any contaminants from damaging the cooler or other hydraulic components. In summary, it is essential to inspect and maintain concrete pump hydraulic oil coolers regularly to ensure efficient operation and prolong their lifespan. Following the manufacturer's guidelines and considering the specific operating conditions will help determine the appropriate frequency for inspections and maintenance.
Q: What is the washing process of the concrete pump pipe?
Connect the reducing pipe and close the discharge door. Pour water directly into the hopper.
Q: How do I properly maintain and replace hydraulic valves in concrete pump spare parts?
To ensure the smooth operation and long life of your concrete pump spare parts, it is crucial to properly maintain and replace the hydraulic valves. Here are some guidelines to follow: 1. Conduct Regular Inspections: Regularly inspect the hydraulic valves for wear, damage, or leaks. Look for visible defects like cracks, corrosion, or other signs of deterioration. It is important to identify and address any issues early on to prevent further damage. 2. Maintain Cleanliness: Keep the hydraulic valves clean to prevent dirt, debris, or contaminants from entering the system. Use an appropriate cleaning agent and a lint-free cloth to wipe the valves and remove any buildup. 3. Ensure Proper Lubrication: Proper lubrication is vital for the smooth functioning of hydraulic valves. Consult the manufacturer's guidelines to determine the suitable lubricant and the recommended lubrication schedule. Apply the lubricant as instructed. 4. Promptly Replace Damaged Valves: If a hydraulic valve is beyond repair or excessively worn out, it is crucial to replace it promptly. Consult the equipment's manual or seek guidance from the manufacturer to identify the correct replacement valve. Make sure the replacement valve matches the required specifications for your concrete pump. 5. Seek Professional Assistance: While operators can handle some maintenance tasks, it is advisable to seek professional assistance for complex maintenance and replacement procedures. Professional technicians possess the expertise and knowledge to handle hydraulic valves safely and effectively. 6. Prioritize Safety: Always adhere to proper safety protocols when working with hydraulic valves. Release all pressure and fully depressurize the system before attempting any maintenance or replacement. Wear appropriate personal protective equipment, such as gloves and safety goggles, to safeguard yourself from potential hazards. In conclusion, regular maintenance, timely replacement, and adherence to safety guidelines are crucial for maintaining and replacing hydraulic valves in concrete pump spare parts. By following these steps, you can ensure the reliable and efficient operation of your equipment.
Q: How often should hopper grate pin retainers be inspected or replaced in a concrete pump?
To ensure proper functioning and prevent potential issues, it is important to regularly inspect hopper grate pin retainers in a concrete pump. Ideally, these inspections should be conducted on a monthly basis. However, the frequency of inspections may vary depending on usage conditions and manufacturer recommendations. During these inspections, it is essential to carefully examine the hopper grate pin retainers for any signs of wear, damage, or corrosion. If any of these issues are detected, immediate replacement is necessary to maintain the concrete pump's efficiency and safety. Furthermore, it is crucial to follow the manufacturer's guidelines regarding the lifespan of the hopper grate pin retainers. Some manufacturers may advise replacing them after a certain number of operating hours, while others may suggest replacement based on the condition observed during inspections. Regular inspections and timely replacement of hopper grate pin retainers play a crucial role in preventing malfunctions or accidents during concrete pumping operations. It is highly recommended to consult the concrete pump's manual or contact the manufacturer for specific guidelines on inspection and replacement intervals for hopper grate pin retainers.
Q: How do I maintain the performance of concrete pump spare parts in extreme weather conditions?
To maintain the performance of concrete pump spare parts in extreme weather conditions, it is crucial to take certain precautions. Firstly, ensure that the spare parts are properly protected from direct exposure to harsh weather elements such as rain, snow, or extreme heat. This can be achieved by using covers or shelters to shield the parts. Additionally, regular cleaning and lubrication of the spare parts will help to prevent any buildup of dust, dirt, or moisture that could potentially affect their performance. Lastly, conducting regular inspections and maintenance checks will allow for early detection of any damage or wear, enabling timely repairs or replacements to be made, thus ensuring optimal performance in extreme weather conditions.
Q: How often should the concrete pump cylinder be replaced?
The frequency at which the concrete pump cylinder needs to be replaced depends on various factors such as the amount of usage, the quality of concrete being pumped, and the maintenance and care given to the pump. Typically, a concrete pump cylinder can last for several years if properly maintained and serviced regularly. However, it is recommended to inspect the cylinder for signs of wear and tear on a regular basis and replace it whenever there are noticeable signs of damage or deterioration. It is always better to be proactive and replace the cylinder before it fails completely to avoid any potential accidents or disruptions in the pumping process. Ultimately, it is best to consult the manufacturer's guidelines and recommendations regarding the replacement interval for the specific make and model of the concrete pump cylinder being used.
Q: How often should carbide wear plates be replaced in a concrete pump?
The frequency of replacing carbide wear plates in a concrete pump depends on various factors such as the quality of the carbide, the amount of usage, and the conditions in which the pump operates. Generally, carbide wear plates may need replacement every 6 to 12 months, but regular inspection and monitoring of their condition is essential to determine the actual replacement interval.
Q: What is the purpose of a concrete pump hydraulic oil cooler?
The purpose of a concrete pump hydraulic oil cooler is to regulate and maintain the temperature of the hydraulic oil used in the pump system. By cooling the oil, it helps prevent overheating and ensures optimal performance and longevity of the hydraulic components.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords