• Concrete Pump Delivery Bend(DN125*45 Degree) System 1
  • Concrete Pump Delivery Bend(DN125*45 Degree) System 2
  • Concrete Pump Delivery Bend(DN125*45 Degree) System 3
Concrete Pump Delivery Bend(DN125*45 Degree)

Concrete Pump Delivery Bend(DN125*45 Degree)

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20 pc
Supply Capability:
2000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Pump Delivery Bend(DN125*45 Degree)

 

1.   Structure of Concrete Pump Delivery Bend(DN125*45 Degree):

 

Concrete Pump Delivery Bend(DN125*45 Degree) is used on concrete pump pipeline for concrete delivery which is much bigger than concrete elbows. It is made by St52 seamless pipe. Now its main structure is as follows;

 

Material: ST52, 45Mn2 etc.

Flange: ZX, F/M elbow

Size: DN125 etc.

Working Capacity: 25000-45000cbm

Degree: 90, 60, 45, 30 etc.

 

 2.   Main Features of Concrete Pump Delivery Bend(DN125*45 Degree):

 

• High Wear-resistant, long service life, lower cost

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Ensure the supply of ancillary parts

• Our company passed the ISO9000 certification, the product through 3C certification in full compliance with national standards.

 

3.  Concrete Pump Delivery Bend(DN125*45 Degree) Images:


Concrete Pump Delivery Bend(DN125*45 Degree)

Concrete Pump Delivery Bend(DN125*45 Degree)

Concrete Pump Delivery Bend(DN125*45 Degree)

 

4.  Concrete Pump Delivery Bend(DN125*45 Degree) Specification:

 

Name

Concrete pump   clamp   coupling/elbow/pipe/spare parts/gasket

Standard

Schwing,   Putzmeister, Kyokuto, Cifa,   Sany, Zoomlion.

Type

90O, 60O,   45O,11.5O DN125 {5”}--DN150(6")

Radius

R275, R180 R320

Material

Hi-Mn13,ST52(16Mn),   45Mn2,45#steel and   so on

Usage

Used in Concrete   Pump outlet in   Construction Work Fit to Schwing and PM,   Sany, Zoomlion, Cifa etc.),   which include delivery pipe, elbow,   reducer, coupling(clamp), male and female   flange, rubber hose,   cleaning ball, wear plate etc. Welcome to contact us for   more   information.

finish

Painting, Epoxy   or Galvanization

Package

Wooden boxes

 

 

Wear-resistant    Single or Double Concrete Pump Elbow

Type 

Singe     Elbow 

Double     Elbow 

Model

DN125

DN150

DN175

DN125

Material

Casting Steel     ,ST52

Inside 

 40Cr

Outside 

Size

R275*90°

R275*90°+110

36°

F2000

R275*90°

R275*90°+110

R275*45°

R275*90°+211

R400*30°

A3000

R275*45°

R275*90°+211

R275*25°

R275*90°+411

R400*45°

471B

R275*25°

R275*90°+411

R275*20°

R275*90°+424

R400*30°

571B

R275*20°

R275*90°+424

R275*15°

R275*45°+170

R488*90°

A1000

R275*15°

R275*45°+170

R180*90°

R275*45°+310

R500*90

C1000

R180*90°

R275*45°+310

R232*60°

R275*45°+310

R280*90°

B2000

R232*60°

R275*45°+310

R240*36°

20°Lengthen 



R240*36°

20°Lengthen 

R240*30°

25°+740



R240*30°

25°+740

R240*15°

40°Zoomlion



R240*15°

40°Zoomlion

R385*29°




R385*29°


R315*33°




R315*33°


Technic

Forged


Average life

25,000cubic

50,000cubic

Application

Used in concrete     transport in construction work

 

5. FAQ:

 

We have organized several common questions for our clients, may help you sincerely

①Is your products exported a lot?

We have exported to many, many countries. Every year we ship more than 30 containers of these spare parts. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.

 

6. Why choose us:

 

•  We are a comprehensive manufacturing and trading company.

•  Our company is one of the biggest manufacturing and trading companies in China.

•  We have been specialized in producing concrete pump spare parts and specialized in producing all kinds of concrete pump parts. As Concrete Pump Pipe, Concrete Pump Elbow, Concrete Pump Rubber Hose, Concrete Pump Wear Plate, Concrete Pump S Valve, Concrete Pump Piston and so on.

•  We are famous for our superior quality, competitive prices, first-class craftworks, safe package and prompt delivery.

•  We have been supplying concrete pump parts for SCHWING, PUTZMEISTER, SANY, CIFA, KYOKUTO, ZOOMLION for 10 years, so we can promise you the quality and best price.

 


Q: What are the sectors of machine building and parts processing?
1., industry generally refers to its production of similar products, or with the same process, or to provide similar labor services division of economic activities, categories.
Q: What is equipment manufacturing and machinery manufacturing? What's the difference between them?
At present, other countries in the world, including international organizations, have not put forward the concept of equipment manufacturing. The concept of equipment manufacturing industry is unique to our country. Its formal appearance was seen in the central economic work conference in 1998, which explicitly stated: "we must energetically develop the equipment manufacturing industry."". (central economic work conference: Economic Daily, December 10, 1998, first edition) The core of the manufacturing industry is equipment manufacturing. People do not have the same understanding of equipment manufacturing industry, and there is no consensus definition and scope definition. It is generally believed that the manufacturing sector consists of the equipment manufacturing industry and the final consumer goods manufacturing industry. Equipment manufacturing industry is the general term of the industry which provides the production technology and equipment for the simple reproduction and extended reproduction of the national economy, namely the machine manufacturing industry for producing machines".
Q: Building materials, equipment, components and fittings products must have "three certificates" is what cards?
Three is a business license, certificate of product quality, product quality inspection certificate. Business license is the legal provisions of some industries must be licensed, and handled by the competent department of the operating permit, such as tobacco monopoly license, drug business license, business license and other dangerous chemicals.
Q: What kind of electrical equipment do you have? What are the main components of each device?
Electrical equipment mainly refers to the transformer, reactor, capacitor, combination electric appliance, circuit breaker, transformer, lightning arrester, coupling capacitor, transmission line, power cable, grounding device, generator, condenser, motor, closed busbar, thyristor.
Q: How do the welding parts in the welding drawings of the machine parts indicate the technical requirements of the drawings?
With what groove related, open groove is not the same, marking is not the same, "welding structure" reference to our specialized courses
Q: China mechanical net
There are mechanical product development and design, mechanical equipment transformation, mechanical equipment maintenance, data inquiries, standard inquiries, mechanical professional translation, mechanical CAD and other mechanical and technical services.
Q: How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q: Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q: What are the sub projects of a construction project?
Appendix B Construction Engineering Division (sub branch) engineering, sub project division, B.0.1 Construction Engineering Division (sub branch), engineering, sub projects can be divided into table B.0.1. Table B.0.1 division number of construction works, sub works and sub projects
Q: What functions should be achieved in mechanical structure design?
The design of mechanical structure is based on the overall design, according to the principle of the program to determine and draw a specific structure, in order to reflect the required functions. Is the working principle of the abstract concrete into some parts, the specific content in determining the structure of the material, shape, size, tolerance, heat treatment and surface conditions at the same time, we must consider the process, strength, stiffness, accuracy, and other parts of the relationship between each other and other issues. So, the direct product structure design is the technical drawings, but the design work is not a simple mechanical drawing, drawing only express design language, specific integrated technology is the basic content of structural design.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords