• Building Scaffolding /Safety ladder with  Banana-Latch System 1
  • Building Scaffolding /Safety ladder with  Banana-Latch System 2
  • Building Scaffolding /Safety ladder with  Banana-Latch System 3
  • Building Scaffolding /Safety ladder with  Banana-Latch System 4
  • Building Scaffolding /Safety ladder with  Banana-Latch System 5
  • Building Scaffolding /Safety ladder with  Banana-Latch System 6
Building Scaffolding /Safety ladder with  Banana-Latch

Building Scaffolding /Safety ladder with Banana-Latch

Ref Price:
get latest price
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
30 m
Supply Capability:
10000 m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Material:
Q235
Tube Spec.:
Dia.60mm
Frame size:
2450*1280
Place of Origin:
Guangdong, China

Quick Details

  • Place of Origin:Guangdong, China (Mainland)

  • Type:Scaffolding Parts

  • Scaffolding Part Type:Scaffolding Frames

  • Material:Q235

  • Tube Spec.:Dia.60mm

  • Frame size:2450*1280mm,2450*1500mm etc.

  • Accessories: Cross braces, uprights, diagonal rods, walking boards, stairs, connecting pins, safety nets, etc.

  • Surface treatment:Painted or Galvanized

  • Product Usage:Used in high-speed bridges, subways, high-speed rails, dams, tunnels, culverts, etc.

  • Features:Wide range of uses, convenient installation, good stability, reasonable structure, good comprehensive benefits, and repeated use

    Living photos

Building Scaffolding /Safety ladder with  Banana-Latch

.jpg

.jpg

After long-term development, Safety ladder with  Banana-Latch has formed a standard series of products. In order to  adapt to the needs of various construction conditions, our company focuses on the design innovation and production quality of the safety ladder. Let customers have more choices and more convenient construction tools.

Welcome everyone to purchase according to the actual construction situation.

Tips,

Owners and construction units are requested to install in strict accordance with the product installation instructions to ensure the qualified and safe use of this Safety ladder.


Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
Q:The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
Q:Sprinkling water on the construction helps to help reduce haze days
Construction site environmental protection measures are as follows: First, the dust management
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
Q:There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords