Door Type Scaffolding Frame System
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Galvanized Solid Scaffolding Frame
Height:1000mm,1200mm,1500mm,1700mm,1900mm,2000mm,etc.
Main pipe/tube:38-60mm
Ledger: 25-35mm
Pipe/tube thickness:1.5-3.75mm
Accessories:cross brace,joint connector,walkway board/plank,stairs
Surface treatment : painted,galvanized,powder coating
Color:orange,red,yellow,etc.
OEM ACCEPTABLE
Quality promised
Authorized with ISO9001:2008
Sample is Available
- Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
- scaffolding load shall not exceed 270kg / m
- Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
- That it is what to do with it, for home improvement, then, in the end how much help? Need to pay attention to a few points:
- Q:On the issue of compensation after the event of force majeure
- The cleaning and repair costs of the works do not include scaffolding
- Q:Construction technology measures fee is directly into the sub - project costs
- Division of project costs only include human labor costs, materials, machinery, business management fees and profits
- Q:Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
- First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
- Q:What is the bamboo board for the scaffolding of the building?
- Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG Construction site commonly used scaffold with stamping steel foot Shouban.
- Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
- Because you scaffolding too high pump enough, so you can only use the tow pump or car pump when the tow pump, the pump tube connected to the pouring site, with the pipe, pipe to complete the concrete pouring task
- Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
- Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
- Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
- No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
- Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
- 1) In three seconds the paintbrush accelerated to a speed of 96 feet/sec (ignoring air resistance) at a acceleration of 32 feet/sec/sec. 2) It started at a speed of zero, so the average speed for those three seconds was 48 feet/sec. 3) 3 seconds times 48 feet/sec. equals 144 feet.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Door Type Scaffolding Frame System
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 20000 set/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches
Related keywords