• Double width uprightness climb ladder scaffolding System 1
  • Double width uprightness climb ladder scaffolding System 2
  • Double width uprightness climb ladder scaffolding System 3
  • Double width uprightness climb ladder scaffolding System 4
  • Double width uprightness climb ladder scaffolding System 5
Double width uprightness climb ladder scaffolding

Double width uprightness climb ladder scaffolding

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

It accord with Europe safety standard HD1004 completely.also supply to you scaffolding assembled.
its construction can save platform's space,reduce the building time,can avoid that worker ignore to
build climb ladder.Work platform can be built in each rung,each rung height is 50cm,it is very flexible
and parts utilize rate due to its perfect assemble function.Rapid,convenience,it is the best choice for
cleaning and maintaining lines.


Double width135cm

135cmx200cm  135cmx250cm  135cmx300

Single width 75cm

75cmx200cm 75cmx250cm 75cmx300cm

height

Can choose 2m-40m

Carrying capacityeach floor

272 kg

Total carrying capacity

900 kg

Material

Aluminum alloy 6082



Q: Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction
Q: A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
Q: On the issue of compensation after the event of force majeure
If the rain will be the construction of the road also washed away, then the road and repair costs borne by the owners There is a principle, "who is the child who is going," the engineering entity itself is the owner of this needless to say; the scene of the material is also the owner of the stack; the road would have been "seven links and one leveling" content, ; Required engineers to stay in the construction site necessary management and security personnel are owners of the requirements of the engineers, should belong to the owners But scaffolding is a technical measure, you should bear Such a look, is not clear how much ah
Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q: The name of the laws and regulations relating to the building, at least . The The
Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q: I would like to know what the scope of responsibility for the construction engineering supervision is specific
The scope of project supervision responsibility should mainly cover two aspects: one must involve the project itself, the site management is different from the project management, the former is the contractor's responsibility, the latter is the responsibility of the supervision interval, and the project itself has nothing to do with the responsibility of the accident , If the accountability of enterprises or supervisors is not based on the responsibility Such as temporary construction, temporary electricity, erection of scaffolding, loading and unloading of various building materials, on-site transport equipment, etc, does not constitute the project itself, so even if the accident occurred, should not be held accountable or supervisory staff responsibility Second, it must involve the quality of the project, because the owner is the first person responsible for the quality of the project, the project supervision enterprises as a social intermediary service organization, its power, responsibility and obligation is derived by the owner commissioned by any supervision business can not exceed the owner commissioned Responsibilities and new powers and obligations Therefore, the supervision of enterprises not only to bear the corresponding responsibility for the quality of the accident, but also due to the quality of the accident caused by accidents, including accidents, including other accidents
Q: what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords