Aquaflex KS-988A JS High Polymer Modified Cement Elastic Waterproof Coating
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Description
Aquacoat KS-988A JS acrylic polymer cementitious waterproof coating is made up by acrylate emulsion, cement and inorganic materials, type I, II and III are available according to their different performance.
Product Feature
· It has environment friendly, non-toxic, harmless and safe performance
· High bonding strength, it can be bonded firmly with many types of mortar substrate
· Can be applied on wet and dry substrate directly
· Can be applied on vertical, slope and top surface directly, no flow, easy to use
· Good weather resistance, it can be applied on the outdoor roof without special protective layer (normal protective layer is needed)
· Excellent flexibility and good low temperature resistance
· Good ability of bonding and water resistance
Can be combined well with cement mortar and ceramic etc.
- Q: Slope roof drains do not need to be waterproof
- need. Roof waterproof layer regardless of which form and materials, constitute the entire roof of the waterproof drainage system, all the necessary pipes, flues, drainage holes, embedded iron and pillars and other roof out of the facilities, should be done in the roof waterproof Layer to properly handle the structure of the node, with particular attention to the connection part of the soil and the drain part of the water flow.
- Q: Find the construction steps for waterproof coatings
- 2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
- Q: Do you use the waterproof material on the building to be harmful to the human body?
- If you are out of the finished line, the best anti-static that can! I plant is the production of waterproof material, in addition to the internship when I went to the workshop, and now I do not go!
- Q: Can Henkel have water against him?
- Add a small amount of water is possible because the premise of waterproofing should also be wet before the grassroots
- Q: There is no formaldehyde in the finished putty
- Visible putty powder and formaldehyde or a great relationship, but now many manufacturers have introduced environmentally friendly putty powder, not only environmentally friendly pollution-free important is also can control the air, there is a negative ion putty powder is the composition which contains tourmaline tourmaline, through And the water molecules in the air combined with the decomposition of negative ions to deal with the air, anion can be neutralized with formaldehyde into dust falling into the air, you can also remove the dust in the air, as well as enhance the metabolism of the function.
- Q: Roof for the insulation, Master roof, using two waterproof construction program
- Construction of roof waterproofing membrane First, the process (hot melt construction) Clean up the grass-roots → brushing the primary treatment agent → paving the film additional layer → paving the film → hot melt sealing side → water test → protective layer
- Q: I would like to ask how to do in the warm water above,
- Do not know why you are in the floor to do the top of the waterproof? The We are here in the northeast of the winter is very cold, are warm, no one to warm the ground to do the above water, I think you over and over again, ah, no need, every family is warm, you have to do waterproof in the above is afraid of soaking your floor or tiles Bubble? The If the pipe really leaked, did not use the waterproof, the first warm tube must be selected, followed by your shop is good or bad, workers, water, are very important, you focus on this line on the line
- Q: Why should the use of high pressure perfusion waterproof plugging method
- High pressure grouting construction principle: is a special high-pressure grouting waterproof material through the high-pressure infusion equipment into the concrete crack structure extended until all the cracks (including the naked eye is difficult to meet) filled with water (water) with the cross-linking reaction, Release a large number of carbon dioxide gas, resulting in secondary pressure, high pressure and secondary pressure will be pressed into the elastomer and filled with all the gaps, to stop the purpose of leakage, it can be said that the best performance of plugging material,
- Q: Developers have done waterproof, decoration house also have to do it
- Secondly, before the waterproof layer may be done in the house decoration, paving tiles or other equipment when the installation was destroyed, so that the waterproof layer is no longer a whole,
- Q: Waterproof material water leakage construction should pay attention to what
- Or to local, if it is a bathroom, it should pay attention to these points: Bathroom waterproof practice: 1, ground handling Before the water treatment, must first find the ground. Leveling layer of construction methods: the base surface with gaps, cracks, unequal defects, with cement mortar repair smooth. So that the base surface must be strong, smooth, clean, dust-free, greasy, wax, release agent, and other debris material. Leveling layer before drying can be waterproof construction, construction should be fire, waterproof. After the completion of the waterproof layer, to be finished product protection, not on the move.
Send your message to us
Aquaflex KS-988A JS High Polymer Modified Cement Elastic Waterproof Coating
- Loading Port:
- Shekou
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 1000000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords