• Aluminum Formwork for One Level House Building System 1
  • Aluminum Formwork for One Level House Building System 2
Aluminum Formwork for One Level House Building

Aluminum Formwork for One Level House Building

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
500000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Whole Aluminum Formwork Description 

Whole Aluminium Formwork System is designed to reduce material quantity, erection and dismantling time as well as effort, subsequently increasing efficiency and reducing general construction time, materials and labour cost. All main components are manufactured from high grade aluminium alloy. This structural grade aluminium has exceptional properties being extremely light in weight but also heavy-duty and durable. When incorporating this into a design which utilizes standard components and allows several possible plan and elevation variables, it provides a lightweight solution for a large area slab formwork system.

 

2. Specifications:  

1. Title: Building Mateirals Construction Aluminum Formwork

2. Material: 6061-T6 aluminum alloy

3. Width : 0.1m/0.15m/0.2m/0.25m/0.3m
Height: 0.4m/0.6m/0.7m/0.9m/1.2m/1.5m
Or any customizes unit sizes according to structural drawings

4. Product application: shear wall, frame structural, retaining wall, column/beam/slab, core wall, staircase.

 

3. Building Mateirals Construction Aluminum Formwork main advantages:

1. Improve productivity

2. Environmental protection and energy saving

3. Minimize labor, low cost

4. Long time used

5. Material versatile

6. High recovery value for the used material

7. No nails needed

8. Light weight, high strength

9. Suitable for any structures

10. No need second concrete work

 

3. Whole Aluminum Formwork Specifications

1: MaximumColumn Size:900 x 900mm

(2’-11.5”x 2’-11.5”)

2: DesignConcrete Pressure: 1,800 psf (90 kN/m2)

3:StandardPanel Width 900mm, 750mm & 600mm

(2’-11.5”,2’-5.5” & 1’-11.5”)

4:StandardPanel Height: 3.0m, 2.4m, 1.2m


Aluminum Formwork for One Level House Building

Aluminum Formwork for One Level House Building


Q: What are the maintenance and maintenance of hydraulic climbing formwork
Regular inspection of the climbing device should check the connections. In particular, the following parts of the site to focus on inspection and reinforcement: according to the design requirements of the bolt with spring washers
Q: Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q: The difference between the scaffold and the scaffold
The difference between climbing frame and scaffolding is commonly used scaffolding from below has been set up, which is followed by building up climbing frame, the figure is upstairs, they have in common is that we are like scaffolding
Q: Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q: The whole concrete wall climbing frame or good use of steel scaffolding
It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material
Q: What is an integrated climbing frame? What are the works? What are the advantages
. It can climb up or down the building. This system makes the change scaffolding Technology: one is without turning over the shelf; two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches