• 2015 New TC7030 Mobile Topkit Tower Crane System 1
  • 2015 New TC7030 Mobile Topkit Tower Crane System 2
  • 2015 New TC7030 Mobile Topkit Tower Crane System 3
  • 2015 New TC7030 Mobile Topkit Tower Crane System 4
  • 2015 New TC7030 Mobile Topkit Tower Crane System 5
  • 2015 New TC7030 Mobile Topkit Tower Crane System 6
2015 New TC7030 Mobile Topkit Tower Crane

2015 New TC7030 Mobile Topkit Tower Crane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  TC7021 12T construction used tower crane for sale

 

Product Description

 

Descriptions of our tower crane:

1, TC7021 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7021 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

 

Independent height (m)

50

Max height with attachment (m)

200

Working range can be adjusted(m) 

40/45/50/55/60/65/70

Min working range(m) 

2.5

Max lifting capacity(t)

12

Tip load @ 48m(t)

2.1

Hoist mechanism

Falls

2

4

Lifting capacity(t)

0-3

-

0-6

0-6

-

0-12

Speed(m/min)

0-80

-

0-40

0-40

-

0-20

Motor

YZPBF250-4-55W   

Trolleying mechanism

Speed(m/min)

0-56

Motor

YZPBE132M-4-7.5KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YLEW112M-6-120.N.M X2

Climbing speed(m/min)

0.5

Counterweight(t)

23.6

Mast section size(L×W×H)m

2.0×2.0×3.0m

Working temperature

-40-+60°C

Total power (KW)

95

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       219A

Rated working voltage & current

380V                  146A

 

2015 New TC7030 Mobile Topkit Tower Crane

2015 New TC7030 Mobile Topkit Tower Crane

2015 New TC7030 Mobile Topkit Tower Crane

2015 New TC7030 Mobile Topkit Tower Crane

2015 New TC7030 Mobile Topkit Tower Crane

  

About CNBM:

1, CNBM is the biggest state-owned company which has had been awarded Qualified construction machinery manufactures and most of the big project are using our products.

2, CNBM possess key technical research department and could design & produce special machinery for international clients.

3, We have had passed ISO9001:2008,CE and etc.

4. The successful long-time construction machinery operation in the world testifies that the CMAX products' performance is stable.

5. More than 10 overseas branch office provide immediate commercial convenience and after service.

6. We also has building hoist, suspended platform, formwork, etc. We also signed the strategic partnership with Tadano (China), XCMG, Zoomlion, Sany and other prestigious crane manufacturer, getting the competitive cost price from them, and using our overseas marketing channel to promote their brands. We can provider a series of equipment for your building company customer and supply a basket scheme for the final users.

7. We have built a cover 50,000 square meter logistic park in, Dubai UAE, will be a great guarantee of our business in middle east and nearby area.

 

 

FAQ

 1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q: It's a local company in Omaha that seriously could be the next Starbuck's if they ever expand.
It won't expand if Starbucks have their way. They have driven all their competiton out of business. I hope Crane Coffee can survive.
Q: How do they erect those giant cranes used for constructing tall buildings?
They build themselves actually.... well the first part is assembled by a small crane but after that hydraulic lifts lift up the top section of the crane while the crane lifts up another mid section and places it underneath itself. cool huh?
Q: What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...
Q: Can someone tell me the difference betweem safe working load and capacity of a crane?If possible, please provide reference along with tour answer.thanks for the help!!!
What sort of crane? If it is an industrial crane in a factory, the maximum rating for the crane is always lower than the true maximum to allow for a safety cushion. If the crane states it cane lift say 1 ton, it can safely lift 2000lbs. It will lift up to 2300 lbs if needed though.
Q: There are 2 Sandhill cranes that come by my house often because I feed them. I noticed that one of them has its right foot bent up awkwardly. It still moves around and travels with ease, but I wonder if there is something I could about it? Who should I contact?
Contact US Fish and Wildlife Service: www.fws /
Q: It affects my day to day life, especially in the summer, having to cope with crane flies, wasps and moths getting into my house, so I usually just pretty much keep myself in my room, door closed, windows closed to prevent any from getting into my room. If I happen to be near any of these insects I tend to have a panic attack and can't handle it. I have no reason for my fear, I am just afraid of them for no reason. If my room is too hot, I'll just sit in the dark with the window slightly open, in fear of them coming into my room. It's getting silly now and a lot of my friends will tease me about it. Really it's weird, I'm afraid of these insects, however I don't mind spiders (though I will not touch them), or any other insects for that matter. Can anyone help me to overcome my fears?
Try some pleasant music to listen to and distract your mind ? Good Luck. Best Wishes. Mars Mission Soon In A Galaxy Near Yours.. Source(s): Studies.
Q: For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
Q: Building a new skyscraper? Tearing down the old Mellon Arena?
PITTSBURGH -- Construction is continuing downtown on the new, 30-story Three PNC Plaza, which is scheduled for completion later this year. On Saturday, a giant crane from Philadelphia was brought to the construction site on Fifth Avenue to hoist massive steel girders into place. The girders weigh more than 89,000 pounds and will support a third-floor ballroom.
Q: I am kinda really sick of paper cranes, and I was wondering if there's any good method of making paper birds that look, well, like birds. I checked out the one website with instructions, but, well, look at it. I tried it.
I haven't made the other birds on this site but they have a pelican and an owl. I think the pelican looks a bit crane-ish but it may look different in reality. Have fun!
Q: when a skyscraper is done being built, how does the crane come down?
Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords