2015 New TC7030 Mobile Topkit Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC7021 12T construction used tower crane for sale
Product Description
Descriptions of our tower crane:
1, TC7021 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7021 tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3, It is original in design, reliable in operation and satisfactory in shape.
4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.
5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products
Advantage of our tower crane:
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Independent height (m) | 50 | ||||||
Max height with attachment (m) | 200 | ||||||
Working range can be adjusted(m) | 40/45/50/55/60/65/70 | ||||||
Min working range(m) | 2.5 | ||||||
Max lifting capacity(t) | 12 | ||||||
Tip load @ 48m(t) | 2.1 | ||||||
Hoist mechanism | Falls | 2 | 4 | ||||
Lifting capacity(t) | 0-3 | - | 0-6 | 0-6 | - | 0-12 | |
Speed(m/min) | 0-80 | - | 0-40 | 0-40 | - | 0-20 | |
Motor | YZPBF250-4-55W | ||||||
Trolleying mechanism | Speed(m/min) | 0-56 | |||||
Motor | YZPBE132M-4-7.5KW | ||||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||||
Motor | YLEW112M-6-120.N.M X2 | ||||||
Climbing speed(m/min) | 0.5 | ||||||
Counterweight(t) | 23.6 | ||||||
Mast section size(L×W×H)m | 2.0×2.0×3.0m | ||||||
Working temperature | -40-+60°C | ||||||
Total power (KW) | 95 | ||||||
Power supply requirement (KVA) | 190KVA for generator | ||||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | ||||||
Startup voltage & current | 380V×95%=361V 219A | ||||||
Rated working voltage & current | 380V 146A
|
About CNBM:
1, CNBM is the biggest state-owned company which has had been awarded Qualified construction machinery manufactures and most of the big project are using our products.
2, CNBM possess key technical research department and could design & produce special machinery for international clients.
3, We have had passed ISO9001:2008,CE and etc.
4. The successful long-time construction machinery operation in the world testifies that the CMAX products' performance is stable.
5. More than 10 overseas branch office provide immediate commercial convenience and after service.
6. We also has building hoist, suspended platform, formwork, etc. We also signed the strategic partnership with Tadano (China), XCMG, Zoomlion, Sany and other prestigious crane manufacturer, getting the competitive cost price from them, and using our overseas marketing channel to promote their brands. We can provider a series of equipment for your building company customer and supply a basket scheme for the final users.
7. We have built a cover 50,000 square meter logistic park in, Dubai UAE, will be a great guarantee of our business in middle east and nearby area.
FAQ
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q: Hello,I live in the St. Louis area of Missouri and during the summer, Crane Flies (I call them Mosquito Eaters) fly around all the time at night. I believe that it is normal for this type of bug to be nocturnal, but lately, I've seen them flying around, jumping around, and getting in the house DURING THE DAYTIME!! (AHH!!) :0 Is there any explanation for this? If so, is there anyway to reduce their population in and around my house? Thanks for reading.Ty
- Crane Fly larva are rat-tailed maggots that prefer stagnant, even polluted water. Check around your neighborhood to see if you have any stagnant pools (I've seen them in water-filled tree hollows, but this sounds like a more significant source) or polluted, but low-flowing, streams. If you find any, this might be a good opportunity to do a little environmental restoration.
- Q: Would you say that Ichabod Crane is socially awkward??
- Slightly, but he's a quirky character. As described in the story, Ichabod Crane is a school teacher who travels to Sleepy Hollow to teach the children of the area. This, in company with his ability to ingratiate himself, persuades many of the townspeople to successively lodge him at their homes for a week at a time, which serves as his sole means of lodging. He follows strict morals in the schoolroom, including the proverbial Spare the rod and spoil the child; outside the schoolroom, he is shown to have few morals and no motive but his own gratification. Despite being thin, he is capable of eating astonishingly large amounts of food and is constantly seeking to do so. In addition to this, he is excessively superstitious, often to the extent of believing every myth, legend, tall tale, etc. to be literally true. As a result, he is perpetually frightened by anything that reminds him of ghosts or demons. If you're talking about the movie Sleepy Hollow, then, Constable Ichabod Crane is a fictional character, played by Johnny Depp. He is a New York policeman with an interest in science, sent to Sleepy Hollow to investigate a string of grisly murders. As in the original story, his horse is named Gunpowder. Ichabod's most notable traits in the movie include an ahead-of-his-time liking for post-mortem examinations and scientific methods, as well as his being very quirky.
- Q: quick answer or i'll delete it!
- I think I've seeing Pizza Delivery more times, since it's season 1. It's a classic episode, I mean: The krusty krab pizza, is the pizza, for you and me! who doesn't love that?! I love Skill Crane. And The Splinter wasn't that bad, it would have being better if it weren't for the gross parts, but it haven't air that much since it premiered just a couple weeks ago.
- Q: the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
- All I can say is.. Big crane make big thing go up.
- Q: What is the scrap standard of tower crane hook?
- The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
- Q: How do we build an ELECTROMAGNETIC crane?
- STEP 1 Buy a Crane Step 2 put a electromagnet on iy Step 3 stick ur name on it you get DIY crane
- Q: Basically what it says on top. Also provide maybe a video to prove it.
- Do you watch American Dad? And i think it would be difficult for it to actually work unless you modified it so no if its a traditional origami crane, but if you work backwards and made the wings of the crane to resemble a paper airplane then i think its possible
- Q: what is the proper way to fold a paper crane?
- Well, okorder /
- Q: when a skyscraper is done being built, how does the crane come down?
- Most probably you are referring to the Tower Crane. Interesting questions should have followed, like: How is it constructed while the construction is in progress? How is the placement of the Tower Crane determined? What happens to the space occupied by the Tower Craneafter work completion? How far should the 'boom' (the arm that has a moving pulley) go? Anyway, your question is a good one, because when I had my first construction work, the Tower Crane was already there and I was thinking of how to dismantle it afterwards. The dismantling process, is done part by part, set by set starting from the top going down. Another interesting question is: How would that excavating truck or bulldozer be able to get out of that deep matt excavation after all excavation works have been accomplished? It is interesting to note that an earth ramp is created while excavation progress, until the machine is down deep in the excavation and seems that it is impossible for it to get out after excavation work is done?
- Q: When should a crane be load tested?
- if crane using regularly more then 8 hrs test should be every 4 months 8 months and full sevice at 12 months............ Load Testing Services ACECO provides inhouse vertical load testing services for load bearing equipment. Examples of equipment that can be load tested: ? Below the hook lifting devices ? Hoists ? Hooks ? Testing can be performed to meet ASME B30.20, B30.10, and B30.16 as well as ANSI N14.6. ? Standard inhouse 50 ton load testing capacity. ? Ability to test higher load capacity devices (Up to 5,000,000 pounds). ? Have tested up to 640,000 pounds (320 tons). ? Engineering manufacturing available to provide lift fixtures for test purposes. ? Can provide nondestructive testing of critical welds and critical locations. ? Inhouse capability to make weld repairs using AWS D1.1 qualified procedures and welders. ? Calibrated test weights available. ? Testing can be performed in accordance with 10CFR50,Appendix B Quality Program. ? Certificates of Test and/or Test Reports can be provided. ? Can provide onsite load testing services, including supply of calibrated weights.
Send your message to us
2015 New TC7030 Mobile Topkit Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 pc
- Supply Capability:
- 10000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords