Vokes®NPS Nano Porous Insulation Blanket, Fumed Silica Microporous Insulation for Flexible Duct Manufacturers
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 600000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Characteristics:
Vokes® NPS, flexible flat insulated felt which is made of fumed silica by nano technology. It is of small density, high compressive strength, waterproof, and many other superior performance, widely used in all kinds of industrial piping, tanks, and various vessels in regular/irregular shapes.
Advantages:
• Wide insulation range: Long-term working temperature is at the period of -120℃-650℃.
• Extremely low and stable thermal conductivity: At normal temperature, the insulated performance is at least 3-5 times better than the traditional materials. At temperatures higher than 300℃, the insulated performance is at least 4-8 times better than the traditional materials.
• Flexible: It’s good for wrapping pipes and equipments.
• Space saving: It drastically reduced insulation thickness.
• Easy installation and maintenance: The small density makes installing safely and easily.
•Corrosion resistant: Products are made of inorganic silicates, it doesn’t include soluble chloride ions, won’t cause corrosion on equipments, pipes.
• Soundproof/Shockproof: It helps acoustic noise reduction and shock buffer.
• Waterproof: Nano particles of product themselves are super hydrophobic.
• Durable: It has a long working life.
Applications:
• Metallurgical and Mechanical Industry
• Oil and Energy (piping, boiler, etc.)
• Glass furnace
• Aerospace and Military.
Product Data:
Surface color: White/Grey
Geometry:Rectangular shape (without protruding flanges*)
Density ≤300kg/m³
Thermal conductivity (Surface temperature:℃)
50℃ 0.016W/(m·k)
200℃ 0.020W/(m·k)
300℃ 0.023W/(m·k)
400℃ 0.025W/(m·k)
500℃ 0.033W/(m·k)
600℃ 0.040W/(m·k)
Refractoriness > 800℃
Cold Crushing Strength (Compression 20%) ≥0.40MPa
Permanent Linear Change(600℃×24h) ≤1.0%
Standard dimension (L x W)(mm): 1200x600/400x600
Thickness:3mm/6mm/10mm
Size tolerance • 0 to 500 mm: ±2 mm
Thickness tolerance: ± 1 mm
Service life : extrapolated, depending on application up to 50 years.
- Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Step distance is the bar distance, vertical distance is vertical bar distance. Span ... guess or pole distance.
- Q: Can the kitchen sewage pipe pass through the walls of the stove wall?
- The system can avoid the hot bridge in winter, greatly reducing the indoor heat loss through the external walls; summer can greatly reduce the external radiation from the sun to the indoor heat conduction, and thus the heating, air conditioning energy consumption decline
- Q: How to strengthen the construction management and construction quality control
- Combined with national energy Policy, and then according to the design of the various properties of insulation materials, calculated through a complex calculation process is not free to set the thickness.
- Q: On the classification of car repair, the best details Thank you Such as sheet metal workers, car circuits, etc. Thank you
- first of all, this is a very professional problem, there are many kinds of maintenance shelves, materials are divided into wood, bamboo, steel pipe, etc
- Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
- According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
- Q: Is the clamp type flexible connector connected to the pipe to the rubber pad?
- 1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
- Q: Heating pipe through the deformation of the joints, the album is written on the "metal hose", the problem one: This is a flexible hose? Question 2: how to set the quota
- First, according to its structure can be divided into: scaffolding according to its structure can be divided into: multi-pole, bowl button, door type, square tower, attached lift frame and hanging scaffolding. Second, the knowledge expansion: scaffolding by setting the form can be divided into: single row scaffolding only a row of pole scaffolding, the other side of the horizontal bar on the wall structure. double scaffold scaffolding with two rows of poles. multi-row scaffolding with more than 3 rows of pole scaffolding. full of scaffolding according to the scope of construction work full, both directions have more than 3 rows of pole scaffolding. Full scaffolding The maximum height of the wall or construction work, the scaffolding set by the height of the ground. Scroll (Peripheral) Scaffolding Scaffolding that is set up and intertwined along a building or range of work. Scaffolding Scaffolding with special flat and space shapes, such as for chimneys, water towers, cooling towers and other flat, circular, "outer", polygonal and upper, Form of construction scaffolding.
- Q: Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
- EPS board (also known as benzene board) is made of polystyrene board abbreviation. There is raw materials through pre-hair, curing, molding, drying and cutting made. It can be made into different density, different shapes of foam products, but also can produce a variety of different thickness of the foam sheet. Widely used in construction, insulation, packaging, refrigeration, daily necessities, industrial casting and other fields. Can also be used to display the venue, merchandise cabinets, advertising signs and toys manufacturing. At present, in order to meet the national building energy efficiency requirements are mainly used in wall insulation, external wall insulation, to warm.
- Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
- First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications
- Q: What materials are made of flexible pipes? Why should the mechanical ventilation set the flexible tube? Where should I be located?
- It is recommended to use the home of the heart of the card to worry about toughness to fill the joints, and then paste the seam (master understand) if directly in the sandwich panel (plate) on the batch of putty powder or spray painted really easy to drop off the phenomenon of stone, the first primer, it is recommended to use the home of the German brand brackish scraping scraping again There are), to be dry and then approved scraping putty powder spray really stone paint
Send your message to us
Vokes®NPS Nano Porous Insulation Blanket, Fumed Silica Microporous Insulation for Flexible Duct Manufacturers
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 m²
- Supply Capability:
- 600000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords