• Class 1 Flexible Duct Steel Wire System 1
  • Class 1 Flexible Duct Steel Wire System 2
  • Class 1 Flexible Duct Steel Wire System 3
Class 1 Flexible Duct Steel Wire

Class 1 Flexible Duct Steel Wire

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specifications

1. high carbon spring wire
2. Wire dia:0.4-13mm

3 .Standard:DIN17223 GB4357-89

4 .Delivery time:15 days 1*20FCL

5 .MOQ:1 Ton

1. Specification

Material

45#,60#, 65#, 65Mn, 70#, 72A, 72B, 80#, 82B,SAE1060, SAE1065, SAE1070

Dia

0.3-13.0mm

Surface

Smooth, phosphated and lead patent heat treatment

Quality inspection of each coil

Tensile Strength, Tolerance, Surface smooth, Torsion,Bending,Winding, Ellipse , etc.

Certificate

ISO9001,ISO14001,SGS,Jiangsu Famous Brand , Excellent Quality Metallurgical Products

Standard

DIN17223/1-1982,GB4357-89 and other standards .

Application

making springs, steel ropes, cable wires, mattress ,banding wire

Coil weight

15KG-200KG per coil or as per your requirement

Packaging

coils, packed with P.P.cloth or according to customers' request.

Dilivery time

15 days for one 20 feet container.

Loading Capacity

Loading about 20tons in one 20's containe

Tensile Strength

High Carbon Steel Wire

wire diameter(mm)

Tensile Strength(N/mm² )

Grade B

Grade C

Grade D

0.20

2150-2550

2400-2790

2690-3090

0.25

2060-2450

2300-2700

2640-3040

0.30

2010-2400

2300-2700

2640-3040

0.40

1910-2300

2250-2650

2600-2990

0.50

1860-2260

2200-2600

2550-2940

0.60

1760-2160

2110-2550

2450-2840

0.70

1710-2110

2060-2450

2450-2840

0.80

1710-2060

2010-2400

2400-2840

1.00

1600-2010

1960-2300

2300-2690

1.20

1620-1910

1910-2250

2250-2550

1.40

1620-1910

1860-2110

2150-2450

1.60

1570-1860

1810-2160

2110-2400

1.80

1520-1810

1760-2110

2010-2300

2.00

1470-1760

1710-2010

1910-2200

2.20

1420-1710

1660-1960

1810-2110

3.00

1370-1670

1570-1860

1710-1960

4.00

1320-1570

1520-1760

1620-1860

5.00

1320-1570

1470-1710

1570-1810

6.00

1220-1470

1420-1660

1520-1760

7.00

1170-1420

1370-1570

8.00

1170-1420

1370-1570

9.00

1130-1320

1320-1520

10.00

1130-1320

1320-1520

11.00

1080-1270

1270-1470

12.00

1080-1270

1270-1470

13.00

1030-1220

1220-1420

 *Chemical Composition

Steel Grade

GB Standard

Carbon

%

Silicon

%

Manganese

%

Phosphorus

%

Sulphur

%

Chromium

%

Nickel

%

Cuprum

%

60#

0.60-0.61

0.18-0.22

0.52-0.59

0.012

0.007

0.06-0.07

0.05

0.18

65#

0.65

0.21

0.56

0.013

0.008

0.05

0.04

0.14

65Mn

0.60-0.70

0.10-0.25

0.70-1.00

0.030

0.030

0.20

0.20

0.25

70#

0.69-0.71

0.19-0.21

0.53-0.58

0.010-0.012

0.003-0.006

0.01-0.05

0.02-0.04

0.04

72A 72B

0.72

0.19

0.71

0.013

0.006

0.02

0.02

0.03

80#

0.80-0.81

0.22-0.24

0.59-0.76

0.008

0.004

0.04

82A 82B

0.82

0.24-0.25

0.76-0.77

0.011-0.014

0.004-0.007

0.17-0.17

2. Packing

Small coil or large coil for the steel wire : Coils, packed with P.P.cloth or according to customers' request

Z2 packing :200-350KF per coil

Iron spool or wood spool for the steel wire

3. Our service

Sample order: we supply you free sample, you pay for the express cost, which  can be shipped in 3 days

Our promise: Send you a workable price ;

Delivery in time;

Service you in lifetime for free;

Full refund if substandard goods

Q: For example, HDPE pipe with a flexible connection is a flexible interface, PVC-U of the glue plug-in method, is just helium pouring a lie on the pizza pull the interface, wire then, flange it more
Project Name: Construction Lifting Machinery Safety Supervision and Management Provisions Expiry date: June
Q: Cast iron flexible tube A type B What is the difference
Air conditioning duct glass wool insulation loss is generally between 1
Q: Will the embedded stove why use stainless steel corrugated hose connection?
The construction of the scaffolding of this project is subject to the requirements of the relevant sections of the latest JGJ130-2011 "Safety Code for Construction Fastener Steel Scaffolding" To design and calculation, the preparation of special safety construction program, after the implementation of the approval. The preparation of the steel pipe should be selected first vertical and horizontal spacing and horizontal bar step, only these are determined in order to calculate the amount of steel pipe.
Q: How to strengthen the construction management and construction quality control
You can Google Oriental Rainbow's official website, there are rainbow days cat flagship store and other links will have the price and product display, you can also contact Rainbow customer service, it is recommended that you choose the East Rainbow waterproof products and standardized construction team, the East Rain rainbow is the best quality waterproof listed companies RPUF-371 sprayed rigid polyurethane waterproof insulation integrated system "rain rainbow" spray foam polyurethane waterproof insulation integrated system is made of foam polyurethane foam waterproof insulation integrated material and protective surface layer constitute
Q: How to effectively deepen the construction process management to improve the quality of construction projects
Oh there seems to be no. I have not seen on the Internet, if there is a thank you to thank
Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
national, provincial and municipal projects related to the construction of policies, laws, regulations and the relevant industry regulations
Q: Is the flexible sleeve of the broken wall used as a second retest?
The national standard is 18kg. Color steel sandwich panel is a common product in the current building materials, do not chu chu dumpling seal festival over the extinguished Long can only be a good flame retardant and environmentally friendly and efficient. Caigang sandwich board has two layers of metal panels and the middle of the polymer core insulation from the suppression. With the installation is simple, light and efficient light and efficient features. And the filling system used to close the molecular structure of the closed, you can put an end to the condensation of water vapor.
Q: Steel Reinforced (HDPE) Polyethylene Helical Corrugated Tubes Warm-Fused-Belt Is Connected or Bonded with Rubber Rings? Ask what?
Flexible waterproof casing is generally suitable for pipes through the walls by vibration or tight waterproof requirements of the structure; rigid waterproof casing is generally applicable to the pipeline through the walls of the requirements of the general waterproof structures; flexible and rigid waterproof casing Wall of the wall, in case of non-concrete should be used instead of concrete walls, and must be a solidification of the casing in the wall; waterproof casing in the construction, chemical, steel, water, sewage treatment and other units
Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications
Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords