• Flexible Duct for HVAC - Individual Carton Box Packed System 1
  • Flexible Duct for HVAC - Individual Carton Box Packed System 2
  • Flexible Duct for HVAC - Individual Carton Box Packed System 3
  • Flexible Duct for HVAC - Individual Carton Box Packed System 4
Flexible Duct for HVAC - Individual Carton Box Packed

Flexible Duct for HVAC - Individual Carton Box Packed

Ref Price:
$2.00 / pc get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
-
Supply Capability:
700000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Features and Characters of Aluminium Flexible Duct:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature

-Fire Retardant

Description of Aluminium Flexible Duct

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air.

Specification of Aluminium Flexible Duct:

1) Non-insulated Flexible Duct: Structure: Two-layer aluminum foils +1 layer of PET film.

2) Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool, Outer jacket: 1 layer of Alu.foil, Glass Wool Density: 16kg/m3; Thickness: 25mm

3) Combined Flexible Duct: Structure: flexible duct PVC jacket. REMARK: Special structure is available according to customer's requirements

Pictures of Aluminium Flexible Duct:

FAQ of Aluminium Flexible Duct:

1.             What temperature maximum? Our products: 150 and 250

2.             What MOQ? Our MOQ: 500 pcs

3.             What payment terms? We accept T/T and L/C

4.             Lead time: 10 days

5.             Packing: Nest packing for non-insulated flexible duct, then into plastic bag for   non-insulated flexible duct or packed in individual carton box.

 

Q:Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
First of all, the main structure of the construction to be reserved when the knot point, and then with the foot of the lack of rush to maintain the use of steel pipe, the so-called hard link. Combined with the external wall fastener type steel scaffolding specifications
Q:Why should the flexible hose be set in the mechanical ventilation system?
The contents of the special construction plan: engineering overview, preparation basis, construction plan; process technology, safety assurance measures, labor plans, calculation books and related drawings.
Q:What is the difference between the D-LD2000 clamp-type flexible fittings and the KRJ-type clamp-type flexible fittings?
Hello, super pole is a completely different PC concept. English name Ultraboo compensation 紶 barnyard cough twisted half hole report film k. Ultrabook is Intel continued MID, notebook, the definition of another new category notebook products, the Chinese translation for the ultra-"very" this. I hope to be helpful to you.
Q:Two hundred galvanized pipe should be under the large flexible tube
We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
Q:Where there are wear-resistant tube, high temperature ceramic tube
The fraction of 200 ℃ in the condensed product was analyzed by GC-MS, and the degradation phenomena and products were discussed
Q:Is the clamp type flexible connector connected to the pipe to the rubber pad?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
Not even if you are cheap to say that you are angry, and a ticket stare on the
Q:Composite pipe and flexible tube which aspects of the difference
You need to find waterproof construction and products, it is recommended that you choose the East Rainbow waterproof products and standardized construction team, the East Rainbow is the best quality waterproof listed companies RPUF-371 spray foam polyurethane waterproof insulation integrated system "Rainbow" spray Dust polyurethane waterproof insulation integrated system is composed of rigid foam polyurethane foam waterproof insulation integrated material and protective surface layer composition
Q:Plastic tube most afraid of what the East unitary
The bonding strength of the gypsum board and the extruded polystyrene plate is ≥010MPa, and the interface is in the extruded polystyrene board The bond strength of the bonded gypsum and the composite plate is ≥010MPa The combustibility of the composite plate reaches B1 level Construction technology points: the installation of the board between the natural close (including the long board) does not leave; for long board, should be installed before the hardening of the bonding material can be carried out; per square meter composite board with at least 2 Expansion of the anchor, each commonly used specifications of the composite board at least 6 expansion anchors evenly anchored to the grass-roots wall; external walls and internal wall connection should be extended to the wall, the width should not be less than 300mm; And wall bonding area ≥ 30% Applicable conditions and scope: hot summer and hot summer and warm winter area outside the building insulation works
Q:To ask why the use of clamps connected to the spray pipe after the flush again after the water there will be a lot of hook link position leakage phenomenon? Thank you! The The
It should be JGJ130-2001 Ministry of Construction 2001-02-9 approved 2001-06-01 implementation

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords