Canvas Flexible Duct Connector for Flexible Aluminum Air Duct Heating and Cooling
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 25 litre
- Supply Capability:
- 500000 litre/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Aluminum Foil Ducts Description:
The production technologies and products performance of aluminum foil facing have been up to international advanced level. The aluminum foil facing products are mainly used for HVAC system, refrigerators, building thermal aluminum foil facing insulation and laminated with glass wool and rock wool to increase the insulation function.
• FSK aluminum foil facing is mainly used for duct wrap in HVAC system and other fields, such as vapor barrier etc., and suitable for off-line lamination of glass wool or rock wool. By special processing, the facing will have excellent flame retardant property.
• Heat-sealing aluminum foil facing is used for duct wrap without applying extra adhesive and suitable for online lamination of glass wool and rock wool.
• The WPSK aluminum foil facing, whose structure is white polypropylene/ fiberglass scrim/ kraft is mainly used for metal building insulation and suitable for the insulation of ware-house, factory, supermarket, office and so on.
• Double sided aluminum foil facing vapor barrier, whose structure is aluminum foil/ high strength kraft /fiberglass scrim /aluminum foil and laminated together by special flame retardant adhesive, can be used for roofing, wall insulation of house, warehouse, cold storages, factory and others.
2.Main Features of the Aluminum foil facing:
• Light weight
• High manufacturing accuracy
• High strength
• Small inertia resistance
• Strong heat dissipation ability
• Good visual effect
• High reflective insulation
• Heat resistant, water proof, stable at high temperature;
• environmentally friendly,no smell and not-toxic;
• Smooth and clear surface;
3.Aluminum Foil Ducts Images
4.Aluminum Foil Ducts Specification
1. Full flexible, high quality factory thermally insulated duct, for all pressure air
conditioning and ventilation system
2. Diameter: 82mm to 457mm
3. Temperature range: -30 degree .C to 80 degree. C
4. Air velocity: Max.30m/sec(5906ft/min)
5. Working pressure: Max.300 mm WG(3000Pa or 12 WG)
6. Fireglass Thickness: 25mm
7. Fireglass Density: 16kg/m3-20kg/m3
8. Standard Length: 10m
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
(1) How about your company?
A world class manufacturer & supplier of aluminum foil facing and is one of the large-scale professional investment aluminum foil facing bases in China. Annually more than 1000 containers of aluminum foil facing are exported to markets in Europe, America and Japan.
(2)What is the storage condition?
The products should be stored at room temperature and kept from wet and heat source.
It is essential, as with all pressure-sensitive tapes, that the surface to which the tape is applied must be clean, dry, and free of grease and oil.
The user should take test and do trial-application on the above products before coming into application so as to witness and ensure suitability for user’s special purpose and technique.
(3) How to guarantee the quality of the products?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.
(4) How long can we receive the product after purchase?
In the purchase of product within four working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served
- Q: Do you have a natural gas hose in the flue?
- Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
- Q: Does the desulfurization and denitrification equipment use metal hoses?
- Electrician electrical welder field driver tower crane driver signal workers scaffolding workers lifting workers
- Q: Flexible pipe trench backfill inspection batch quality acceptance record how to fill
- Home appliances to the countryside sales business first of all should go to the local Bureau of Commerce for the record, after authorization, the monthly sales of home appliances to the countryside information information log system, and the corresponding sales invoices, product identification card, the buyer ID document copy Reported to the local financial institutions (usually the local financial office), and then the financial management of your sales information to review, grant subsidies
- Q: What is the difference between a rigid sleeve and a flexible sleeve?
- Apparent density of 23kg / m3 or more, the greater the density the more expensive.
- Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
- According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
- Q: Why should the flexible hose be set in the mechanical ventilation system?
- The contents of the special construction plan: engineering overview, preparation basis, construction plan; process technology, safety assurance measures, labor plans, calculation books and related drawings.
- Q: Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
- 1.5M is the thickness of the board? If it is, in view of the large amount of concrete from the major, then the long spot of the short spot of the prisoners need to pay special training program reported to the chief engineer or expert approval, which is also the most important [template bearing capacity design calculation], proof of design Of the construction program to meet the bearing capacity of concrete to ensure that the template and its bracket should have sufficient carrying capacity, stiffness and stability, can reliably withstand the weight of pouring concrete, side pressure construction load. In recent years, because the construction of non-standard template led to the collapse of a lot of scaffolding, hope to be cited
- Q: Two hundred galvanized pipe should be under the large flexible tube
- We now have to declare the Department of the Ministry of the United States and the United States, the company said that the access point to our own set, so I would like to ask, what is the requirements of this access point? There is no relevant specification to add: is the construction, the outdoor pipe network in the gas access point position more
- Q: Rigid pipes differ from flexible piping, those are rigid pipes that are flexible piping
- According to the "construction safety inspection standards" JGJ59-. the safety assessment of the project this month to meet the eligibility criteria, agreed to the construction unit self-evaluation views, wear raft flat Wo Zhuangguang state platinum card assessed as qualified.
- Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
- On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.
Send your message to us
Canvas Flexible Duct Connector for Flexible Aluminum Air Duct Heating and Cooling
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 25 litre
- Supply Capability:
- 500000 litre/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords