• R8 Flexible Duct - Class 1 Close Cell Flexible Ducts for HVAC Systems System 1
  • R8 Flexible Duct - Class 1 Close Cell Flexible Ducts for HVAC Systems System 2
  • R8 Flexible Duct - Class 1 Close Cell Flexible Ducts for HVAC Systems System 3
R8 Flexible Duct - Class 1 Close Cell Flexible Ducts for HVAC Systems

R8 Flexible Duct - Class 1 Close Cell Flexible Ducts for HVAC Systems

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
25 litre
Supply Capability:
2000000 litre/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.  Aluminum Foil Ducts Description

• FSK aluminum foil facing is mainly used for duct wrap in HVAC system and other fields, such as vapor barrier etc., and suitable for off-line lamination of glass wool or rock wool. By special processing, the facing will have excellent flame retardant property.

2.Main Features of the Aluminum foil Ducts

1. Full flexible, high quality factory thermally insulated duct, for all pressure air
conditioning and ventilation system
2. Diameter: 82mm to 457mm
3. Temperature range: -30 degree .C to 80 degree. C
4. Air velocity: Max.30m/sec(5906ft/min)
5. Working pressure: Max.300 mm WG(3000Pa or 12 WG)
6. Fireglass Thickness: 25mm
7. Fireglass Density: 16kg/m3-20kg/m3
8. Standard Length: 10m

3.Aluminum Foil Ducts Images

 

Class 1 Close Cell Flexible Ducts For HVAC Systerm

Class 1 Close Cell Flexible Ducts For HVAC Systerm

Class 1 Close Cell Flexible Ducts For HVAC Systerm

 

4.Aluminum Foil Facing Specification 

TYPICAL PHYSICAL PROPERTIES:

PROPERTIES

UNIT

VALUE

TEST METHOD

Basic weight

gsm

80

ASTM D646

Tensile strength: M. D.

               X. D.

N/25mm

95

50

ASTM C1136

Burst strength

N

25

ASTM D774

Reflectivity of foil surface

%

95

----------

Temp. Resistance

-29°C

+66°C

No change

 keep soft

ASTM C1263

Water vapor permeance

ng/N.s

1.15

ASTM E-96

Water Soak Test

24hrs

No delamination

----------

Width: 1.0m, 1.2m, 1.25 m, 1.30, 1.37m

Length: 200m, 500m, 1000m, 2500m, 2750m, 3300m

Core I.D.: 3"(76mm ±1), 72mm ±1

Based on order, special sizes are also available.

 

5.FAQ

We have organized several common questions for our clientsmay help you sincerely

(1) How about your company?

 A world class manufacturer & supplier of aluminum foil facing and is one of the large-scale professional investment aluminum foil facing bases in China. Annually more than 1000 containers of aluminum foil facing are exported to markets in Europe, America and Japan.

(2)What is the storage condition?

The products should be stored at room temperature and kept from wet and heat source.

It is essential, as with all pressure-sensitive tapes, that the surface to which the tape is applied must be clean, dry, and free of grease and oil.

The user should take test and do trial-application on the above products before coming into application so as to witness and ensure suitability for user’s special purpose and technique. 

 

 

Q: Do you have a natural gas hose in the flue?
Fastening steel pipe scaffold generally by the steel pipe rods, fasteners, base, scaffolding, safety net and other components of steel pipe: generally there are two, an outer diameter of 48mm, wall thickness 3
Q: Will the embedded stove why use stainless steel corrugated hose connection?
Do not open the window, enjoy the fresh air 24 hours a day, to ensure adequate ventilation (hourly indoor air replacement 0
Q: I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
so much? The Lifting workers, shelves workers, electricians, welders
Q: Talk about the class flexible management of the class teacher what the requirements
National Standard B Administrative Regulation C Industry Code D Normative document Local regulations which of the following are safety technical standards? (ACDE) A Code for safety of construction work JGJ80-91B Construction Engineering Supervision Standard Safety code for construction machinery use JGJ33-2001D Standard for Safety Inspection of Building Construction JGJ59-2011E Tower crane safety regulations GB5144- from the 90's onwards, the Ministry of Construction have prepared a number of building safety technology standards, including (ACDE) A Building construction safety inspection standard B Measures for the Administration of Construction Permit for Construction Works Technical Specification for Safety of Fastener Steel Scaffolding for Building Construction Gantry and derrick material hoist safety technical specifications "the State Council on the further strengthening of production safety decision" (Guo Fa [2004] No 2) pointed out: to strive to build (ABCDE) of the safe production work pattern A Government united leadership Department of supervision according to law The enterprise is fully responsible for D Mass participation in supervision The whole society is widely supported according to the Ministry of Construction on the construction enterprises and the safety of production and management of the main responsibilities of the production of the following responsibilities (ABCD) A Implement national laws and regulations on safe production and standard B Prepare and timely update the safety management system Organize the full safety education Organize security checks Organize the preparation of special construction program
Q: Safety evaluation: gas pipeline and discharge pipe should not be set between the valve, what is the specification of which provisions?
In the past, the external wall insulation technology prevails, the external wall insulation is in the experimental stage, Basically no
Q: What is the difference between a rigid pipe and a flexible pipe, what kind of pipe is rigid, what is flexible
According to the requirements of the "Construction Engineering Safety Protection and Civilian Construction Measures Fees and the Use and Management Regulations", the document shall include at least the following parts: 1. Safety equipment: safety nets, safety belts, helmets, etc .; , The entrance and the edge of the protection facilities: stairs, elevator, channel mouth, reserved hole, balcony around the floor around the roof around the foundation pit, unloading platform on both sides of the platform and the upper and lower access and other security facilities; . tower cranes, external elevators, well frame hoists and other construction works from the construction of the steel, the use of high-quality steel, Heavy equipment and supporting protective facilities; Fifth, the construction of electricity: in line with regulatory requirements of the temporary electricity system, the standardization of electrical boxes, electrical protection devices, power lines laying, foreign protection measures, etc .; six, construction machinery; : Including the construction of lifting equipment and external elevators, safety nets, steel scaffolding and other detection. Ten, safety education and training; nine, safety signs, signs and safety publicity column; ten, civilized construction and environmental protection: construction site fencing and site hard ground, dust control, noise control, drainage measures, , Temporary facilities: including offices, dormitories, cafes, toilets, shower, etc .; . fire equipment and facilities; thirteen, emergency rescue equipment; . foundation pit deformation monitoring; fifteen, underground safety Protection and monitoring.
Q: CAD type too much (including civil engineering, interior spring design, motor, machinery manufacturing and many other), a beginner how to choose?
Extrusion plate (XPS) is a polystyrene resin or its copolymer as the main component, add a small amount of additives, made by heating and extrusion with a closed-cell structure of the rigid foam
Q: Plastic tube most afraid of what the East unitary
The best is to, otherwise the space is not in circulation,
Q: Composite pipe and flexible tube which aspects of the difference
On this basis, advanced construction and management technology, excellent technology in the continuous improvement and updating, which on the one hand also shows the construction market continues to improve
Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
When connecting, first thread the bottom of the connector, and then screw the tapping screw into the threaded bottom hole of the connected part. As the tapping screw thread surface has a high hardness (≥ 45HRC), can be connected to the threaded bottom hole in the internal thread, thus forming a connection.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches