• PVC Flexible Duct - Uninsulated Flexible HVAC Ductings System 1
  • PVC Flexible Duct - Uninsulated Flexible HVAC Ductings System 2
  • PVC Flexible Duct - Uninsulated Flexible HVAC Ductings System 3
  • PVC Flexible Duct - Uninsulated Flexible HVAC Ductings System 4
  • PVC Flexible Duct - Uninsulated Flexible HVAC Ductings System 5
PVC Flexible Duct - Uninsulated Flexible HVAC Ductings

PVC Flexible Duct - Uninsulated Flexible HVAC Ductings

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
500000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Features and Characters of aluminium flexible ducts:

1)Non-insulated and insulated Flexible Duct offered  2) Up to 150 and 250 Max. temperature   3) Fire retardant   4) OEM&ODM service offered

Introduction of aluminium flexible ducts:

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.

1)     Non-insulated Flexible Duct Structure: Two-layer aluminum foils +1 layer of PET film.

2)     Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool, Outer jacket: 1 layer of Aluminium foil   Glass Wool Density: 16kg/m3; Thickness: 25mm

3)     Combined flexible Duct

Pictures of alumnium flexible ducts

 

Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ductings

Un-insulated Flexible Ductings HVAC Ducting HVAC Flexible Ductings

 

FAQ of of aluminium flexible ducts:

1.      What temperature maximum? Our products: 150 and 250

2.      What MOQ? Our MOQ: 500 pcs

3.      What payment terms? We accept T/T and L/C

4.      What lead time: 10 days

 

 

 

Q: What is the effect of concrete pouring on the construction quality?
Our usual way is to fight the fuse.
Q: Drain flexible pipe to keep the base design above the elevation of the number of meters
, there are cloth-based materials, such as Teflon cloth, etc
Q: Will the embedded stove why use stainless steel corrugated hose connection?
Do not open the window, enjoy the fresh air 24 hours a day, to ensure adequate ventilation (hourly indoor air replacement 0
Q: I am sorry to see your answer on Google, can I also pass a copy of my construction and decoration project?
First of all you have to check the pipe into the inspection, there are inspection data: product certification, the national inspection report, approach the size and quantity; at this stage to do the main inspection and inspection and shelter project inspection data, the need for quality The person in charge of the signature, the supervision engineer signed, you find some of the wages of the official Gongjia pull the yellow rule of the sea to see the sea, there are templates on the top, you can go to Sina love to download the knowledge.
Q: What are the scope of construction work special operators?
This look at their own interest, ah, I was learning mechanical, or from the mechanical drawing began, in the study of tolerance, technology, design, etc., there are many, but also learn a three-dimensional software, like proe
Q: How to effectively deepen the construction process management to improve the quality of construction projects
Oh there seems to be no. I have not seen on the Internet, if there is a thank you to thank
Q: Find a joint electronic M1.5.4 type ECU application system wiring harness and layout Thank you, anxious! The
Not even if you are cheap to say that you are angry, and a ticket stare on the
Q: Plastic tube most afraid of what the East unitary
The bonding strength of the gypsum board and the extruded polystyrene plate is ≥010MPa, and the interface is in the extruded polystyrene board The bond strength of the bonded gypsum and the composite plate is ≥010MPa The combustibility of the composite plate reaches B1 level Construction technology points: the installation of the board between the natural close (including the long board) does not leave; for long board, should be installed before the hardening of the bonding material can be carried out; per square meter composite board with at least 2 Expansion of the anchor, each commonly used specifications of the composite board at least 6 expansion anchors evenly anchored to the grass-roots wall; external walls and internal wall connection should be extended to the wall, the width should not be less than 300mm; And wall bonding area ≥ 30% Applicable conditions and scope: hot summer and hot summer and warm winter area outside the building insulation works
Q: Where there are wear-resistant tube, high temperature ceramic tube
The fraction of 200 ℃ in the condensed product was analyzed by GC-MS, and the degradation phenomena and products were discussed
Q: Maintenance Skills of Leakage of Fire Pipe Clamp Joint
On the use of steel pipe rack (double pole) support, the specific step to be self-checking, if it is 9 meters high, should be taken out of the full frame, the middle of the spine set must be standardized, in fact, we usually do high-level conversion layer beam is very common You share the board as a beam {face - line load}. On the line is not very complicated. Circular arc positioning to be accurate, first to do stereotypes better.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords