Vertical Multistage Pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 Sets Per Month unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Newly developed product with both homeland and overseas advanced experience in design and manufacture. It is used to deliver clear water, sewage with certain solid particles (such as iron scrap, sand, coal powder etc.) and industry waste water and seawater with corrosive. The temperature of liquid can not be above 80°
- Q: The car broke down and the maintenance crew thought it was a mechanical filter, but changed 4 machines, or did they leak oil?. Then he said it was caused by the high pressure of the oil pump. Replacement pump, heroes, help me. Is the pressure of the oil pump too high to cause oil leakage on the engine?
- Such a problem can arise. The oil pressure is too high, and the oil filter is opened by "drum". The reason is that the oil pump pressure limiting valve [pressure relief valve], resulting in a failure, can not normally open at high pressure caused by pressure relief.
- Q: 3000 Zhijun hydraulic top rattled, replaced the hydraulic top oil pump, filter base cleaning, cleaning oil. Still ring.
- Estimation is steel roof deformation, shaft seal wear need to check and top steel pillar joints without oil
- Q: TOYOTA oil pump not going off
- The problem is that the oil pump is broken or that the oil pressure relief valve is broken
- Q: What about the oil leakage of automobile oil pump?
- If the oil pump is broken, replace it, if it is a rubber pad, change the cushion.An oil pump in a lubricating system that forces the oil from the oil pan to the engine moving parts. Used to increase the pressure of the oil and to ensure a certain amount of oil.
- Q: The oil pump will cause burning oil, in addition to the motorcycle crankshaft and camshaft with oil supply, the other parts are separate, by splash lubrication, when the oil pump failure, not to the crankshaft and camshaft of the two highest burden of parts supply, the engine will appear at high temperature, the high temperature will splash to other parts of the oil quickly consumed, so the oil pump failure will occur in oil burning phenomenon.But now, many models are used instead of the commonly used bearing, bearing, so now the crankshaft locking condition, less and less.
- The pits are ready for oil, lubrication, and burning
- Q: Do you need to disassemble the chain for replacing the oil pump of TOYOTA corolla?
- Hello, timing chain is generally no need to disassemble, you need to remove the oil pan, the oil pump may also have a chain
- Q: Engine oil pump is blocked when the chain would ring
- Hello, not only will sound, and other components will ring, the oil pump blocked, the oil lamp will be lit, not recommended to travel as soon as possible to the professional maintenance factory inspection, I hope my answer will help you
- Q: Oil pump filter screen often blocked, since the engine has the oil filter, and that filter also why it, the engine dirty, it will often plugIs the engine dirty? Is there a good way to clean it?
- This is your time to replace the oil is not often caused by, if we want to eliminate this situation, there is no other way, only remove the oil pan, then put the oil filter clean, rinse the best diesel engine internal, the impurities to wash and put on the new oil, to replace the oil can be on time.If you want to avoid demolition to solve, it is not completely solve the problem, then can only relieve the symptoms, so it is recommended to remove maintenance, is very simple, just remove the oil pan can be up to a replacement oil pad.
- Q: How much does the engine oil pump service cost?
- Hello, dear, now the possibility of maintenance is very small, basically the replacement, as to the price should see what the car, different car prices are not the same
- Q: How do you install the pedal motor pump?
- Put the unit on the foundation with anchor bolts, between the base and the base, and use a pair of wedge pads.Release the axle shaft and place on the pump shaft and base with a level gauge. Adjust the level of the machine by adjusting the wedge pad and tighten the anchor bolts properly so as not to move around.Correct the concentricity of the pump shaft and the motor shaft, and allow the deviation of 0.1 mm on the outer circle of the axle shaft; two the clearance of the coupling plane shall be guaranteed 2~4 mm, and the clearance shall be uniform, and the tolerance shall be 0.3 millimeters.After connecting the pipeline and determining the direction of the motor rotation, then coupled with the coupling, and then check the concentricity of the shaft.In the actual test run 2~3 hours after the unit, for final inspection, if there is no adverse phenomenon, that the installation of qualified. Check the temperature and vibration of the bearing during the test run.During installation, all holes in the unit shall be covered to prevent debris from falling into the machine.In order to prevent the sundries from entering the pump, the filter shall be installed on the newly installed pipeline. The effective cross section shall be 2-3 times larger than the cross section of the suction pipe.However, the oil pump rarely fails, generally as long as the opening of the cylinder head, see more fresh oil or start the engine, there is oil jet, indicating the normal operation of the oil pump.
Our main products are all kinds of centrifugal pumps, displacement pumps and vacuum pumps, such as oil pumps, multi-phase pumps, single stage and double suction centrifugal pumps, horizontal split case pumps, multistage pumps, axial-flow pumps, mixed flow pumps, petrochemical pump and submersible pumps. Besides, our company also manufactures electric motors and sells electric motors, building materials, indoor decoration materials, civil electric equipment, devices and instrumentation, as well as exports our mechanical and electric products.
1. Manufacturer Overview
Location | Hunan,China |
Year Established | 2006 |
Annual Output Value | US$5 Million - US$10 Million |
Main Markets | 59.00% Mid East 8.00% North America 8.00% Southern Europe 5.00% Eastern Asia 2.00% Africa 2.00% Oceania 2.00% Southeast Asia 2.00% Western Europe 2.00% South America 2.00% Central America 2.00% Northern Europe 2.00% Eastern Europe 2.00% South Asia 2.00% Domestic Market |
Company Certifications |
2. Manufacturer Certificates
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability
a) Trade Capacity | |
Nearest Port | SHANGHAI,GUANGZHOU,DALIAN |
Export Percentage | 51% - 60% |
No.of Employees in Trade Department | 6-10 People |
Language Spoken: | English, Chinese |
b) Factory Information | |
Factory Size: | Above 100,000 square meters |
No. of Production Lines | Above 10 |
Contract Manufacturing | OEM Service Offered Design Service Offered Buyer Label Offered |
Product Price Range | High and/or Average |
Send your message to us
Vertical Multistage Pump
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 Sets Per Month unit/month
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches