Tower Scaffolding System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Tower Scaffolding
Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and
has excellent stability and bearing capacity. It has been widely used in the construction of industry
& residential buildings , bridges, tunnels and dam project, etc.
Characteristics:
◆ High degree of standardization.
◆ Easy storage and transportation
- Q: March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
- Quantitative analysis of the problems in safety construction. In order to solve this problem, you must first understand the specification. However, the specification is not enough, not only to understand the safety load of scaffolding. Please forgive me, I am not here, in the past, it is too much trouble. In this process, the construction specification is calculated. Technical specification for safety of fastener type steel pipe scaffold (JGJ130-2001)
- Q: What are the special construction plans for the rainwater tank culvert project?
- Machine tools: responsible for the engine, gearbox, brake system, steering system, cooling system (not air conditioning), chassis and so on
- Q: What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
- Construction site special types of workers operating certificates of the system of the first system The system applies to the construction of special operations personnel supervision and management. The second construction of the lifting and vertical transport machinery drivers, the Secretary of workers, lifting hoisting (installation) workers, signal commanders, lifting, electrical, welder, climbing operations personnel and other special operations personnel, must all hold "Special operations operating permit" induction. The project department for the special operations personnel to establish management files, to ensure that certificates. Article 3 Personnel who have obtained the "Special Operation Certificate" shall be engaged in the relevant special operations, formulate special operating procedures, arrange labor protection articles according to regulations, strictly manage special operations personnel, and combine the characteristics of the project to establish special types of employment
- Q: Safety Management of Winter Construction Rules for Construction Engineering
- Generally take 30 to 35 on it, low hardness is not enough, the cost is too high
- Q: The basic form of the outer scaffolding is filled in
- Polyurethane roof with a small nail connection, board lap tight
- Q: Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
- As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
- Q: Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
- Safety crates, safety nets, protective gloves, protective masks, protective goggles; tower cranes, construction lifts, construction hoists, ,
- Q: Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
- Thickness and material is not the same ah also heat resistance is also different ah.
- Q: What is a new construction technology, new technical information
- Flexible interface allows a certain deformation ~ ~ and rigid interface is connected into the whole ~ ~
- Q: Hello, can you send me an electronic version of the current building code? Thank you, email
- What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
Send your message to us
Tower Scaffolding System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches