Construction Tower Scaffolding System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
name: | material: | thickness: | |||
surface Treament: | standard: |
Packaging & Delivery
Packaging Detail: | CARTONS THEN ON PALLET,OR AS YOUR REQUEST. |
Delivery Detail: | WITH IN 25 DAYS |
Specifications
1. Reliable performance
2. Corrosion resistance
3. Durable finish standards
Construction Tower Ringlock Scaffolding System
1. Product Information
Name | Size | Material | Tube size | Surface | Theoretic weight |
Vertical Standard | 1000mm | Q345 Steel or Q235 Steel | Φ48.3*3.2mm | Galvanized | 4.97kg |
1500mm | 7.46kg | ||||
2000mm | 9.94kg | ||||
2500mm | 12.43kg | ||||
3000mm | 14.91kg | ||||
Ledger | 600mm | Q345 Steel or Q235 Steel | Φ48.3*3.0mm | Galvanized | 2.34kg |
900mm | 3.35kg | ||||
1000mm | 3.67kg | ||||
1200mm | 4.40kg | ||||
1500mm | 5.33kg | ||||
1800mm | 6.32kg | ||||
2000mm | 6.90kg | ||||
Base Jack | 600mm | Q345 Steel or Q235 Steel | Φ38*4.0mm | Electro galvanized | 4.60kg |
- Q:Site fastener consumption of more than 40 million, 2500 tons of steel, the site of the general loss of how much? Stealing certainly some of its power child duo twist Xinwai tears goose enamel times is buried and concrete buried. Done the site can talk about the general loss of how many of your work down? More
- Pay attention to check, remember to take a ,,,
- Q:Safety Management of Winter Construction Rules for Construction Engineering
- Generally take 30 to 35 on it, low hardness is not enough, the cost is too high
- Q:Wanzhou District housing notarized brick structure is how much money per square meter
- Is the set of quotas, there will be poor material adjustment. Now this process is generally not set quota. Both sides follow the market to discuss the price
- Q:What are the special construction proposals for the construction project?
- In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the project accident, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project The wounded, reduce the loss of the accident, the development of this plan
- Q:What is a new construction technology, new technical information
- I think you can not send a copy of the top of the usurpation of a single person who would like to give you a water, to Google search, you can say that you can not think of, there is no there. If you do not understand Hi me.
- Q:In the project settlement of continuous rainfall led to the cost of the construction team can be like the construction side to withdraw claims
- Steel pipe scaffold and sub-button type, bowl button type, socket type, etc
- Q:Discussion on the Selection of Tower Crane in High - rise Building
- Now the construction of the scaffolding of the steel pipe specifications are two: diameter of 48mm wall thickness 3 bones of the fence section of the lettles of the wind. 5mm; diameter 51mm wall thickness 3.0mm
- Q:I am in urgent need of emergency contingency plans I am very anxious ah
- You can go to the MG flagship store inside to see, the general flagship store are authentic, the product itself is why people own production
- Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
- Construction engineering consumption in the fixed amount of corrosion, insulation, insulation works that chapter has polystyrene plastic plate insulation layer of this fixed child!
- Q:How is the tower crane on the site raised?
- 1. Difference is not the mainstream of the heat dissipation heat sink + cooling fan, just based on the vacuum heat plate cooling technology VaporChamber. 2. From the heat side is still based on the vacuum plate is better. But based on vacuum hot plate cooling technology VaporChamber if the design is not good, but play a counter-effect. 3. If the price gap is not large, buy 5770 based on VaporChamber. The performance of the heat should be better.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Construction Tower Scaffolding System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches