Tower scaffolding system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
You Might Also Like
Tower Scaffolding
Shoring tower is an effective supporting system. It is easy to assemble and dismantlement, and
has excellent stability and bearing capacity. It has been widely used in the construction of industry
& residential buildings , bridges, tunnels and dam project, etc.
Characteristics:
◆ High degree of standardization.
◆ Easy storage and transportation
- Q:What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
- The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
- Q:Wanzhou District housing notarized brick structure is how much money per square meter
- Main technical performance: The use of adhesive gypsum and expansion anchor will be extruded polystyrene gypsum composite plate fixed to the inside of the building wall, and the use of joint gypsum and paper tape on the joints for processing
- Q:What is a new construction technology, new technical information
- Flexible interface allows a certain deformation ~ ~ and rigid interface is connected into the whole ~ ~
- Q:So high, how people are safe to enter into the way of what is more
- Tower crane is the most significant tower crane center to the hook to reach the farthest distance, the specific is the car in the tower arm can run long distance. The working range of the tower crane is the radius of the tower crane, and the maximum distance from the crane to the center of rotation should meet the needs of the construction plane. The lifting height of the tower shall not be less than the total height of the building plus the height of the components, sling and safe operation (usually 2 to 3 m), and shall meet the scaffolding, derrick or other barrier material beyond the top of the building Generally not less than 1m) of the maximum beyond the height required. Tower crane in the minimum amplitude from the maximum weight, with the increase in the amplitude of the corresponding reduction in weight. Therefore, in a variety of amplitude are rated from the weight. Different amplitude and the corresponding weight together, can be drawn into a crane performance curve. Rated weight * distance from the center of the trolley = rated lifting moment. The balance of the general tower crane arm is greater than the maximum torque, the crane itself is a boom and balance arm unbalanced steel structure, this imbalance is based on the balance. Since the torque generated by the balance arm is large, that is, in the case of no hanging matter, plus the maximum wind load torque is the tower crane overturning moment. Rectangular basic check, the basic moment is the diagonal direction of the largest, in order to reinforcement. The maximum lifting torque is obtained without considering the wind load, theoretically, to achieve a very dangerous. The lifting weight of the tower crane should include the lifting material, spreader and rigging, etc. acting on the lifting crane hook crane all the weight. The lifting torque of the crane is generally controlled at 75% of its rated lifting torque to ensure safe operation and to extend its service life.
- Q:How far should the tower crane be from the outer wall?
- 1: it is best not to use this, this program in the construction, curing, use, life will bring a lot of problems. 2: hanging net and plaster is formalism, is not considered the consequences. 3: If you want to use tiles to decorate the wall, especially the sandwich panels, the size of the use of small. I have seen a tile wholesale owner home decoration, the 800X800 cut into 800X200 with, it seems good results.
- Q:Summary of the construction safety check score after the summary score how to count
- Scaffolding outside the horizontal distance of 8 meters - 10 meters to set the fence protection, and hang warning signs, but also a personal care to ensure safety.
- Q:I am in urgent need of emergency contingency plans I am very anxious ah
- What are the sub-items of the general project that should be prepared for the special safety program? What should be included in the special programming? The best risk of the preparation of the following: the following dangerous part of the sub-projects and temporary electricity equipment in 5 and above or the total capacity of equipment in the 50kW and above the construction site of temporary electricity construction, the construction unit should prepare a special program The Excavation works of earth and rock
- Q:My family bought a, introduced under the performance, with the same comparison, better ...! More
- Housing construction refers to the construction of housing and other buildings in the construction of infrastructure, including residential buildings, industrial plants, commercial buildings, office buildings and other special housing The external wall insulation is made of polymer mortar, fiberglass mesh, flame retardant molded polystyrene powder, and other materials such as EPS foam or extruded plate (XPS) Into, on-site bonding construction The new insulation decorative board is produced through the assembly line, set insulation, waterproof, finishes and other functions in one, is to meet the current housing building energy needs, improve the industrial and civil building exterior wall insulation level of the preferred material, but also on the existing building energy Transformation of the preferred material
- Q:The latest "current building construction specifications Daquan" electronic version can give me a copy of it My mailbox @ thanks for more
- (Insulation, thermal insulation effect is better) of the insulation material and the building wall fixed one (the thermal insulation effect is better), and the thermal insulation material is fixed with the building wall (fixed, mechanical anchoring, paste + mechanical anchoring, spraying, casting, etc.) , Increase the average thermal resistance of the wall, so as to achieve the insulation or insulation effect of a engineering practice. Should include roof insulation!
- Q:How to calculate the vertical shipping cost of decoration
- Extruded polystyrene insulation board according to the design requirements to take the thickness
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower scaffolding system
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
Quality Product, Order Online Tracking, Timely Delivery
OKorder Financial Service
Credit Rating, Credit Services, Credit Purchasing
Similar products
Hot products
Hot Searches