Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.
CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
Competitive Advantage:
1. High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
5. The inclination of formwork is adjustable by means of adjustable brace.
The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.
Applications:
- Q: What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
- Construction site special types of workers operating certificates of the system of the first system The system applies to the construction of special operations personnel supervision and management. The second construction of the lifting and vertical transport machinery drivers, the Secretary of workers, lifting hoisting (installation) workers, signal commanders, lifting, electrical, welder, climbing operations personnel and other special operations personnel, must all hold "Special operations operating permit" induction. The project department for the special operations personnel to establish management files, to ensure that certificates. Article 3 Personnel who have obtained the "Special Operation Certificate" shall be engaged in the relevant special operations, formulate special operating procedures, arrange labor protection articles according to regulations, strictly manage special operations personnel, and combine the characteristics of the project to establish special types of employment
- Q: What are the special construction proposals for the construction project?
- Combined with the latest cabinet products, the latest product trends to the muscle arc crown old Gui Guai some helium hamburgers, domestic and foreign cabinet market will be toward a more environmentally friendly, customization, style and other direction
- Q: How to calculate the vertical shipping cost of decoration
- Hello, according to the size of your plant to calculate the larger the plant, will be more concessions, generally about 60-. not package workers material Oh
- Q: Discussion on the Selection of Tower Crane in High - rise Building
- Classification means nowhere, fastener type steel pipe scaffolding is the way of delivery by force, followed by two are in the form of structural classification
- Q: How to review the special construction of steel structure
- He found that the current flows from the positive pole of the filament to the metal sheet, rather than from the negative electrode
- Q: There are several special construction projects in the construction project?
- What is the exterior scaffolding erection specification? What do you need to pay attention to?
- Q: What kind of scaffolding is the building divided into? Where to use it as
- Now the framework of the roof approach is the case, should be classified as traditional practices.
- Q: Will the door scaffolding norms who knows ah? Can you teach me?
- Oxygen index greater than or equal to 30 for the B1; oxygen index greater than or equal to 26 for B2.
- Q: Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
- Different types of work, safety equipment is not the same. For the electrical operators, there are mainly insulated shoes, insulated gloves, insulation rods, insulation Taiwan, etc .; for the lathe, fitter, the main part of the building is mainly used for safety, safety nets, Mainly gloves, work hats, goggles, etc .; for the welder, the main gloves, shoes cover, goggles, insulated shoes, etc .; ... ... Viagra talk about these, there are scaffolding, body bar, etc. Safety protection equipment, does not belong to safety equipment. A lot of security equipment, it is characterized by the operator to carry, I will not enumerate one by one.
- Q: How far should the tower crane be from the outer wall?
- " If you want to 2011 or the model, you can choose to update the specifications of the recent update
Send your message to us
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords