• Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 1
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 2
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 3
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 4
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 5
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.

CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.


Competitive Advantage:

1. High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

5. The inclination of formwork is adjustable by means of adjustable brace.

The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.

Applications:


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Q:Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
Foundation and underground space engineering technology 11.1 Post-grouting post grouting technology ........... 11.2 long auger drilling pressure pile technology 21.3 Cement fly ash Gravel Pile (CFG Pile) Composite Foundation Technology 21.4 Vacuum Preloading Reinforcement of Soft Soil Foundation Technology 31.5 geosynthetics application technology ............
Q:What kind of scaffolding is the building divided into? Where to use it as
better strength and stiffness, excellent hydraulic characteristics, the inner wall is smooth, the resistance is small, the damage to the cough and the cough and the seepage point of the same diameter and the design of the hole and the design of the pipe, corrosion resistance, anti-wear, anti-aging, anti-aging, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti-corrosion, anti- Cracking, long life, up to 50 years or more; light weight, no special hoisting facilities, handling and installation is very convenient; comprehensive economic better Hope you can be satisfied More hope to learn the knowledge of the plastic industry
Q:Site fastener consumption of more than 40 million, 2500 tons of steel, the site of the general loss of how much? Stealing certainly some of its power child duo twist Xinwai tears goose enamel times is buried and concrete buried. Done the site can talk about the general loss of how many of your work down? More
Pay attention to check, remember to take a ,,,
Q:So high, how people are safe to enter into the way of what is more
Tower crane is the most significant tower crane center to the hook to reach the farthest distance, the specific is the car in the tower arm can run long distance. The working range of the tower crane is the radius of the tower crane, and the maximum distance from the crane to the center of rotation should meet the needs of the construction plane. The lifting height of the tower shall not be less than the total height of the building plus the height of the components, sling and safe operation (usually 2 to 3 m), and shall meet the scaffolding, derrick or other barrier material beyond the top of the building Generally not less than 1m) of the maximum beyond the height required. Tower crane in the minimum amplitude from the maximum weight, with the increase in the amplitude of the corresponding reduction in weight. Therefore, in a variety of amplitude are rated from the weight. Different amplitude and the corresponding weight together, can be drawn into a crane performance curve. Rated weight * distance from the center of the trolley = rated lifting moment. The balance of the general tower crane arm is greater than the maximum torque, the crane itself is a boom and balance arm unbalanced steel structure, this imbalance is based on the balance. Since the torque generated by the balance arm is large, that is, in the case of no hanging matter, plus the maximum wind load torque is the tower crane overturning moment. Rectangular basic check, the basic moment is the diagonal direction of the largest, in order to reinforcement. The maximum lifting torque is obtained without considering the wind load, theoretically, to achieve a very dangerous. The lifting weight of the tower crane should include the lifting material, spreader and rigging, etc. acting on the lifting crane hook crane all the weight. The lifting torque of the crane is generally controlled at 75% of its rated lifting torque to ensure safe operation and to extend its service life.
Q:In the project settlement of continuous rainfall led to the cost of the construction team can be like the construction side to withdraw claims
Steel pipe scaffold and sub-button type, bowl button type, socket type, etc
Q:What are the relevant laws and regulations for the filing of the attached scaffolding project above 150 meters? What is the specific name of the article? The More
Under the circumstances of the frame body, the floor type double row steel scaffolding
Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
Safety and civilized construction measures include: First, the safety of production . the preparation of safety information, security warning signs of the purchase and promotion of the column set; . "Sambo", "four", "five edge" . the crane, tower crane and other lifting equipment (including derrick, mast) and external safety precautions (including warning signs) costs, including the safety of electricity, including electrical safety standards, electrical protection devices, . the construction site lifting machinery inspection and testing costs; . the construction machinery fence and its fence safety protection facilities costs; . the construction site of the construction site, . fire facilities and fire equipment configuration costs; . electrical protection, safety lighting facilities; . other security measures costs. the cost of security equipment, Second, the fence of the wall beautification (including inside and outside the paint, brush white, slogans, etc.), pressure top decoration costs; on-site toilet slotted white, the user's badge, . on-site living facilities costs; meet the health requirements of drinking water equipment, shower, disinfection, etc.), the cost of the construction of the temporary facilities, . the construction site operating site of the hardening costs; . the source of pollution control, construction waste and garbage clean-up Sinotrans, site drainage and sewage treatment measures, the use of clean fuel costs; anti-gas poisoning, anti-mosquito bites and other measures; . the scene with medical and health care equipment, the cost of goods and emergency personnel training costs; . for the field of workers, the cost of food safety equipment, the cost of food safety equipment, Summer cooling costs, electric fans, air conditioning and other equipment and electricity costs; . the scene Construction machinery and equipment to prevent noise, anti-people measures measures; . other civilized construction measures costs.
Q:Summary of the construction safety check score after the summary score how to count
Scaffolding outside the horizontal distance of 8 meters - 10 meters to set the fence protection, and hang warning signs, but also a personal care to ensure safety.
Q:How is the tower crane on the site raised?
The roof of the color steel composite panels can be applied to the roof insulation layer of the fixed amount of conversion in the fixed amount of the main material; because the quota is different, you use the fixed quota in such a quota on the direct application of no use of similar quota conversion material
Q:How to calculate the vertical shipping cost of decoration
Hello, according to the size of your plant to calculate the larger the plant, will be more concessions, generally about 60-. not package workers material Oh

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords