Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.
CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
Competitive Advantage:
1. High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
5. The inclination of formwork is adjustable by means of adjustable brace.
The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.
Applications:
- Q:Seeking "industrial furnace masonry construction and acceptance of norms" GB-2004 electronic version, urgent use! If appropriate to add bonus points more
- First, the steel scaffold fastener has three 1) right angle fastener (cross buckle) for the connection of two vertical cross steel pipe; such as pole and large bar, large crossbar and small bar connection; 2) (Rotary buckle) for two angles into any angle cross steel pipe connection; 3) butt fasteners (buckle or a word buckle) for the two steel pipe with. Second, the specifications of fasteners 1) Right angle fasteners (cross buckle) 2) Rotary fasteners (rotary buckle) 3) Butt fasteners (buckle or a word buckle)
- Q:Safety Management of Winter Construction Rules for Construction Engineering
- Extruded board, xps extruded board the same, but the name is not the same as the name is not the same, b1 extruded board burning grade b1 level, as xps extruded board grade can be done b1 level can also b2 level,
- Q:Discussion on the Selection of Tower Crane in High - rise Building
- Classification means nowhere, fastener type steel pipe scaffolding is the way of delivery by force, followed by two are in the form of structural classification
- Q:1 cubic tap water there is no way to reduce the water temperature to 15-18 degrees
- Not very clear, continue to learn it hope my answer can help you, do not reward, as long as you top me.
- Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
- As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
- Q:How far should the tower crane be from the outer wall?
- " If you want to 2011 or the model, you can choose to update the specifications of the recent update
- Q:How to review the special construction of steel structure
- With gasoline cleaning, waterproof paint dissolved in gasoline and other organic solvents
- Q:Summary of the construction safety check score after the summary score how to count
- Wall panels and steel structure quota may also have to wait a few years after the quota can be developed, so you still ask the wall manufacturers, I give you recommend: double wall, directly on the Google search can be found.
- Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
- Construction engineering consumption in the fixed amount of corrosion, insulation, insulation works that chapter has polystyrene plastic plate insulation layer of this fixed child!
- Q:The basic form of the outer scaffolding is filled in
- Polyurethane roof with a small nail connection, board lap tight
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords