Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.
CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
Competitive Advantage:
1. High bearing capacity
The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.
3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.
4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
5. The inclination of formwork is adjustable by means of adjustable brace.
The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.
Applications:
- Q:So high, how people are safe to enter into the way of what is more
- Tower crane is the most significant tower crane center to the hook to reach the farthest distance, the specific is the car in the tower arm can run long distance. The working range of the tower crane is the radius of the tower crane, and the maximum distance from the crane to the center of rotation should meet the needs of the construction plane. The lifting height of the tower shall not be less than the total height of the building plus the height of the components, sling and safe operation (usually 2 to 3 m), and shall meet the scaffolding, derrick or other barrier material beyond the top of the building Generally not less than 1m) of the maximum beyond the height required. Tower crane in the minimum amplitude from the maximum weight, with the increase in the amplitude of the corresponding reduction in weight. Therefore, in a variety of amplitude are rated from the weight. Different amplitude and the corresponding weight together, can be drawn into a crane performance curve. Rated weight * distance from the center of the trolley = rated lifting moment. The balance of the general tower crane arm is greater than the maximum torque, the crane itself is a boom and balance arm unbalanced steel structure, this imbalance is based on the balance. Since the torque generated by the balance arm is large, that is, in the case of no hanging matter, plus the maximum wind load torque is the tower crane overturning moment. Rectangular basic check, the basic moment is the diagonal direction of the largest, in order to reinforcement. The maximum lifting torque is obtained without considering the wind load, theoretically, to achieve a very dangerous. The lifting weight of the tower crane should include the lifting material, spreader and rigging, etc. acting on the lifting crane hook crane all the weight. The lifting torque of the crane is generally controlled at 75% of its rated lifting torque to ensure safe operation and to extend its service life.
- Q:What kind of special jobs are available at the construction site?
- 62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4
- Q:Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
- As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
- Q:Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
- Excellent: sub-check the score no 0 points, the summary table score of 80 points and above;
- Q:What are the contents of the safety and civilized construction measures?
- Glass fiber board for the core of the vacuum insulation board, this board thermal conductivity is generally low in the 0
- Q:How to review the special construction of steel structure
- He found that the current flows from the positive pole of the filament to the metal sheet, rather than from the negative electrode
- Q:Hello, can you send me an electronic version of the current building code? Thank you, email
- What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
- Q:Will the door scaffolding norms who knows ah? Can you teach me?
- Oxygen index greater than or equal to 30 for the B1; oxygen index greater than or equal to 26 for B2.
- Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
- Metal hose with austenitic stainless steel or according to user requirements of the material manufacturing, metal hose has excellent flexibility, corrosion resistance, high temperature resistance (-235 ℃ ~ +450 ℃), high pressure (up to 32MPa) , Metal hose in the pipeline can be connected in any direction for temperature compensation and absorption of vibration, reduce noise, change the direction of media transmission, to eliminate the pipeline or between the pipe and the mechanical displacement between equipment, double flange metal corrugated hose It is particularly suitable for flexible joints with various pumps, valves and so on for displacement and vibration
- Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
- Want to know the density, we must first know that you want the board of the flame retardant grade is a few levels, or can not tell you how much density, and each company's products do not rush to avoid the rules, but also the density of the same Not the same, very different!
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords