• Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 1
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 2
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 3
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 4
  • Waterproof Recycling Low Labour Cost Climbing Formwork System CB210 System 5
Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


CB210 has main platform with width 2100mm, compare with CB240, it will be cost effective in some condition.

CB210 climbing system is mainly used for concrete pouring in the wall and the core wall. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.


Competitive Advantage:

1. High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

2.Simple moving procedure by crane
Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

3. Fast striking process without a crane
With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

4. Safe with work platform
The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

5. The inclination of formwork is adjustable by means of adjustable brace.

The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.

Applications:


Waterproof Recycling Low Labour Cost Climbing Formwork System CB210

Waterproof Recycling Low Labour Cost Climbing Formwork System CB210


Q: Construction of the project more than the number of layers must be used construction elevator
A does not affect the claim clause B does not affect the existence of the provisions of the dispute on the settlement of the dispute C
Q: What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.
Q: What are the special construction proposals for the construction project?
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the project accident, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project The wounded, reduce the loss of the accident, the development of this plan
Q: Construction safety management system should be clearly defined what the content
We first come to understand what is the scaffolding is what
Q: I am in urgent need of emergency contingency plans I am very anxious ah
You can go to the MG flagship store inside to see, the general flagship store are authentic, the product itself is why people own production
Q: Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q: What are the five accidents in the construction industry?
The top is definitely to hang, with the top of the space to stay between one meter is the best, in the ceiling of the time, such as with a buckle plate, in the buckle inside plus a layer of rock wool, 3-5 cm thick, Remember to install the time as far as possible not to flatten the cotton, will affect the effect. Brick wall outside or inside, do insulation layer, if the money, but also with rock wool or foam board and the like, if the foam board, the thickness of not less than 6 cm, 10 cm best. Glass surface, this does not spend money is to die, do not spend on the outside hanging sun curtain, cloth and the like, if you want to see, to brush transparent insulation coating, but the price is high.
Q: How to review the special construction of steel structure
He found that the current flows from the positive pole of the filament to the metal sheet, rather than from the negative electrode
Q: Summary of the construction safety check score after the summary score how to count
In each new site to use the scaffolding, before erection, each batch, whether new or old, or rent, buy their own, have to bring the inspection and testing of qualified testing organizations testing.
Q: What kind of special jobs are available at the construction site?
62-1 meet the requirements 2 trench may not be backfill with water, backfill should be dense Section 4

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords