high quality aluminum scaffold tower for construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Model Number: | |||
Safe working load: | material: |
Packaging & Delivery
Packaging Detail: | nude packing |
Delivery Detail: | 35 days upon firm order |
Specifications
1. Light weight
2. High loading capacity
3. Fexible and recyclable
4. Durable and maintenance free
Features
1. Manufactured and Tested in compliance with BS EN1004:2004.
2. High Strength Aviation Aluminum structure for better durability and lighter weight.
3. Through the Trap Build method.
4. Ribbed rung tubing for increased grip.
5. Self closing trapdoors and windlock clips applied.
6. Spigot connecting mechanism for easy assembly and dismantling.
7. Rigid Brace Claw Design.
8. Two ladder designs: Integral Ladders and Clip-in Ladders to suit your special needs.
9. Two Tower widths: 750mm Single Width and 1350mm Double Width.
10. Flexible combination of different components for various project purposes.
11. Safe working load of 272kg per platform level up to a maximum of 1000kg per tower (including self weight)
Products common item
0.8m width mobile aluminum scaffolding SSA(3m-10m) | ||||||||
Materials | aluminum alloy 6061-T6, 52*2.0mm, 52*2.5mm, 52*3.0mm | |||||||
Load capacity | Max load of platform is 272kg, Max load of tower is 900kg | |||||||
Model type | SCSA3 | SCSA4 | SCSA5 | SCSA6 | SCSA7 | SCSA8 | SCSA9 | SCSA10 |
Tower height | 3m | 4m | 5m | 6m | 7m | 8m | 9m | 10m |
Platform height | 2.1m | 3.1m | 4.1m | 5.1m | 6.1m | 7.1m | 8.1m | 9.1m |
Work height | 4.1m | 5.1m | 6.1m | 7.1m | 8.1m | 9.1m | 10.1m | 11.1m |
Per set(weight) | 81 | 113 | 139 | 175 | 187 | 219 | 223 | 277 |
Per set(m³) | 0.58 | 0.83 | 0.96 | 1.22 | 1.34 | 1.59 | 1.68 | 1.95 |
20GP quantity | 45 | 30 | 25 | 20 | 18 | 15 | 15 | 13 |
40Gp quantity | 90 | 60 | 50 | 40 | 36 | 30 | 30 | 26 |
- Q: What are the special construction plans for the rainwater tank culvert project?
- Machine tools: responsible for the engine, gearbox, brake system, steering system, cooling system (not air conditioning), chassis and so on
- Q: What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
- The position of the two adjacent rods should be staggered, should not be set in the synchronization, the synchronization of a vertical separation of the two joints in the height of the side of the length of the function of the population can not be less than 0
- Q: Safety Management of Winter Construction Rules for Construction Engineering
- Clamp type flexible telescopic connection: Clamp type flexible telescopic group: Outer card, seal ring, inner card connector, fastening bolt Clamp type flexible telescopic connection Features:
- Q: I am in urgent need of emergency contingency plans I am very anxious ah
- You can go to the MG flagship store inside to see, the general flagship store are authentic, the product itself is why people own production
- Q: What is the difference between the inside and outside of the car
- First, the basic structure of the wall system: the basic structure of the basic wall system ① adhesive layer ② insulation layer ③ fixed ④ ??protective layer ⑤ decorative layer ⑤ reinforced concrete wall concrete hollow block clay clay porous brick wall clay brick wall Gas concrete wall base wall should be consistent with national standards; Pleasant Hercules adhesive mixture, coated plate thickness of 5mm-7mm, depending on the wall flatness, and the wall paste thickness of 2mm-4mm; Plastic polystyrene insulation board or foam polystyrene insulation board
- Q: How is the tower crane on the site raised?
- The roof of the color steel composite panels can be applied to the roof insulation layer of the fixed amount of conversion in the fixed amount of the main material; because the quota is different, you use the fixed quota in such a quota on the direct application of no use of similar quota conversion material
- Q: Brief description of what is the danger source of the squad leader
- Scaffolding in the structure, vertical and horizontal vertical scissors, even wall pieces, horizontal scissors support, vertical pole, horizontal spacing, horizontal bar step, steel pipe connection, fasteners, pole base, vertical, sweeping the ground, etc , JGJ130-2011 "construction of fasteners steel scaffold safety technical specifications" on the complete provisions In addition to meet the structural requirements, the calculation of the body of the frame must meet the requirements
- Q: Summary of the construction safety check score after the summary score how to count
- Wall panels and steel structure quota may also have to wait a few years after the quota can be developed, so you still ask the wall manufacturers, I give you recommend: double wall, directly on the Google search can be found.
- Q: Will the door scaffolding norms who knows ah? Can you teach me?
- Oxygen index greater than or equal to 30 for the B1; oxygen index greater than or equal to 26 for B2.
- Q: In the project settlement of continuous rainfall led to the cost of the construction team can be like the construction side to withdraw claims
- Not Kazakhstan, can not pass, there are security risks
Send your message to us
high quality aluminum scaffold tower for construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords