Scaffolding tower System for Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
scaffolding tower: | color: | surface treatment: | |||
size:: | working height:: | Payment terms:: | |||
Package:: |
Packaging & Delivery
Packaging Detail: | wood cage or as your as your request sscaffolding tower |
Delivery Detail: | one month after the deposit scaffolding tower |
Specifications
scaffolding tower
Professional quality
Perfect after-service
Reasonable price
scaffolding tower
Features
Folding scaffolding, easy to take and Store.
All aluminum structure, with characteristics of more steady and lighter weight for easy handing.
Fitted with castors, easy to move.
Take European advanced design concept, to give priority to product safety performance.
Prompt technical supports and all-round customer services.
Meanwhile, we can provide all necessary accessories, to achieve one stop shopping.
Total steps | 5 | 6 | 7 | 8 |
Extention length | 253cm | 273cm | 307cm | 361cm |
A Height | 160cm | 160cm | 185cm | 211.5cm |
Open Size (cm) | 160x40x167.5 | 160x40x167.5 | 160x40x194.5 | 160x40x221.5 |
Platform Size(cm) | 147x40x1.2 | 147x40x1.2 | 147x40x1.2 | 147x40x1.2 |
Step Height | 27cm | 27cm | 27cm | 27cm |
Thickness of aluminum | 1.2mm | 1.2mm | 1.2mm | 1.2mm |
Packing Size(cm) | 167X41.6X15 | 167x41.6x15 | 194X41.6X15 | 221x41.6x15 |
N.W. | 15.5kgs | 15.7kgs | 16.4kgs | 17.1kgs |
Max load | 150kg | 150kg | 150kg | 150kg |
- Q: What are the special construction plans for the rainwater tank culvert project?
- Machine tools: responsible for the engine, gearbox, brake system, steering system, cooling system (not air conditioning), chassis and so on
- Q: Wanzhou District housing notarized brick structure is how much money per square meter
- Main technical performance: The use of adhesive gypsum and expansion anchor will be extruded polystyrene gypsum composite plate fixed to the inside of the building wall, and the use of joint gypsum and paper tape on the joints for processing
- Q: What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
- See you want to engage in what kind of work later, beginner or to the network to see some teaching video strike, the general professional will not have such a large span, mechanical and construction is certainly not the same. Or choose a good Ding Dan Chi stalk 佾 flying when the direction of twitching. There are many online video can refer to.
- Q: I am in urgent need of emergency contingency plans I am very anxious ah
- You can refer to the "town gas design specifications" above should be a detailed description
- Q: What are the five accidents in the construction industry?
- I have seen more with the wooden sandwich panels, more beautiful, feel better
- Q: 1 cubic tap water there is no way to reduce the water temperature to 15-18 degrees
- Not very clear, continue to learn it hope my answer can help you, do not reward, as long as you top me.
- Q: Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
- Thickness and material is not the same ah also heat resistance is also different ah.
- Q: Why is all the civil safety information, there is no special decoration safety information? More
- Extrusion board is mainly produced according to the order, the amount can be more effective control of production costs, the amount is too low, then most manufacturers will not boot production, the more common domestic extruded board equipment, about 170 cubic meters to 250 cubic meters , If you do not have a lot of batches, then you can choose to buy the manufacturer's inventory products.
- Q: What are the contents of the safety and civilized construction measures?
- The loss rate of the working material, the project as a unit for assessment, assessment period for the project construction period. Loss rate with the company to improve the management level to adjust, according to the following objectives for assessment. Steel pipe: loss rate of 1.8% or less Fastener: loss rate of 3.5% or less steel mold: loss rate of 3.5% within the quick release combination template and support part: loss rate of 3.5% or less bowl button scaffolding: loss rate of 1.8% Inside the door scaffolding: loss rate of 1.8% or less
- Q: How far should the tower crane be from the outer wall?
- " If you want to 2011 or the model, you can choose to update the specifications of the recent update
Send your message to us
Scaffolding tower System for Construction
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches