• Construction Scaffolding Tower System System 1
Construction Scaffolding Tower System

Construction Scaffolding Tower System

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Place of Origin:
Beijing China (Mainland)


Model Number:
GTJ-R071
name:
Construction Tower Ringlock Scaffolding System
material:
Q235
thickness:
1.6mm to3mm or as your requirements
surface Treament:
as your requirements
standard:
use your standard or international standard

Packaging & Delivery

Packaging Detail:CARTONS THEN ON PALLET,OR AS YOUR REQUEST.
Delivery Detail:WITH IN 25 DAYS

Specifications

1. Reliable performance
2. Corrosion resistance
3. Durable finish standards

     Construction Tower Ringlock Scaffolding System      

1. Product Information

Name

Size

Material

Tube size

Surface

Theoretic weight

Vertical Standard

1000mm

Q345 Steel or Q235 Steel

Φ48.3*3.2mm

Galvanized

4.97kg

1500mm

7.46kg

2000mm

9.94kg

2500mm

12.43kg

3000mm

14.91kg

Ledger

600mm

Q345 Steel or Q235 Steel

Φ48.3*3.0mm

Galvanized

2.34kg

900mm

3.35kg

1000mm

3.67kg

1200mm

4.40kg

1500mm

5.33kg

1800mm

6.32kg

2000mm

6.90kg

Base Jack

600mm

Q345 Steel or Q235 Steel

Φ38*4.0mm

Electro galvanized

4.60kg



Q: How many special types of personnel are required for the construction industry?
You said all wrong, all wrong, all wrong! . the central fresh air system (not the new air unit) can only let the room in the closed doors and windows (or closed room) in the case of ventilation effect, can not be made Hot refrigeration; air conditioning have the effect of heating and cooling, can be carried out humidity control. . you said the heat recovery is a hot exchange of fresh air system, more energy-efficient products, divided into hot and humid exchange of new fans and hot new air units two. But the heat recovery efficiency is generally 65% to 80%, it does not have the effect of heating and cooling, in other words: when the air conditioning to adjust the indoor environment to a certain temperature, stop using, the use of hot exchange fresh air and ordinary fresh wind Than the former indoor temperature change is relatively slow!
Q: Wanzhou District housing notarized brick structure is how much money per square meter
Is the set of quotas, there will be poor material adjustment. Now this process is generally not set quota. Both sides follow the market to discuss the price
Q: What is the maximum lifting capacity of the tower crane What is the maximum weight of the tower crane?
Construction site special types of workers operating certificates of the system of the first system The system applies to the construction of special operations personnel supervision and management. The second construction of the lifting and vertical transport machinery drivers, the Secretary of workers, lifting hoisting (installation) workers, signal commanders, lifting, electrical, welder, climbing operations personnel and other special operations personnel, must all hold "Special operations operating permit" induction. The project department for the special operations personnel to establish management files, to ensure that certificates. Article 3 Personnel who have obtained the "Special Operation Certificate" shall be engaged in the relevant special operations, formulate special operating procedures, arrange labor protection articles according to regulations, strictly manage special operations personnel, and combine the characteristics of the project to establish special types of employment
Q: Safety Management of Winter Construction Rules for Construction Engineering
Generally take 30 to 35 on it, low hardness is not enough, the cost is too high
Q: What are the main points in the inspection of building safety data?
Better with styrofoam, that is, can be insulated and heat.
Q: Rt, 3ks, as far as possible Please ask questions: is the construction site, there are other sites? More
As the external scaffolding (including the bridge scaffolding and the basket) to withstand the limited load capacity is limited, so generally do not use the tower directly to the outer scaffolding supply; when the use of its supply, the need to take specific conditions, respectively, the following measures: (2 to 3 layers, with tower crane installation); 2) the use of small groups of small containers, the overall lifting of the lifting of the body , Respectively, to the operating site; 3) in the scaffold set on the small hopper (need to add appropriate support), the mortar were unloaded in a small hopper When using other vertical transport facilities, trolleys (tricycles, two-wheelers and all kinds of special trolleys) are generally used for horizontal transport Its carrying capacity depends on the number of cars can be loaded at the same time as a unit of time to enhance the number of times Installation conditions The location of the vertical installation shall be fitted with suitable installation conditions, such as a reliable foundation, structural ties and horizontal transport conditions equipment performance must be considered to meet the construction needs and give full play to the effectiveness of equipment When the vertical phase of the construction phase of the phase difference between the poor, should be set up and adjust the vertical transport equipment in phases, the timely removal of equipment has been unnecessary the full use of equipment to make full use of existing equipment, if necessary, the acquisition or processing of new equipment The prospects for future use should be taken into account when acquiring or processing new equipment The use of equipment should be considered in the use of Bi after the change can be used
Q: What are the safety protection appliances, machinery and equipment, construction machinery and accessories for construction enterprises?
Construction of special types of work are: electrician, electric welder, shelf workers, tower crane driver, tower crane Division workers, tower crane signal workers, the documents required by the relevant departments for training.
Q: So high, how people are safe to enter into the way of what is more
Single layer of color steel plate: length * width * thickness * 7.85 * ton price + profit double color steel plate: length * width * thickness * 7.85 * ton price * 2 + sandwich material price + profit specific look material, you can Specifically to consult
Q: Will the door scaffolding norms who knows ah? Can you teach me?
559 Lightning protection In order to avoid the lightning protection, the main structure of the tower crane, the motor base and the metal shell of all electrical equipment, the metal protection tube of the wire should be reliably grounded and its grounding The resistance should not be greater than 4Ω
Q: What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
Construction engineering consumption in the fixed amount of corrosion, insulation, insulation works that chapter has polystyrene plastic plate insulation layer of this fixed child!

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches