Aluminum Scaffolding Tower System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
material: | height: | load capacity: | |||
width: | use for: | thickness: | |||
floor: |
Packaging & Delivery
Packaging Detail: | bubble film and carton |
Delivery Detail: | 7 days after receive your final confirm |
Specifications
1.scaffolding easy install&transport&high quality
2.lightweight but good load capacity
3.single width & double width, optional
Scaffolding Feacture :
1.Light weight
Aluminum scaffold is made of light but firm aviation alluminum alloy so it is easy to assembled, move and keep. And its weight is only one third of the traditional one made of steel, which avoids any damage to the floor.
2.Safe and firm structure
It is a safe and firm platform with all joints tightly engaged. With new cold-work technique of in-expand and out-compress, oer joint is distributed with 4100- 4400 Kg, much stronger than the permitted one with 2100KG. The load of the 12M Double Deck reaches about 500Kg. Each deck can stand the weight of 272Kg and the complete tower of 900Kg.
3.Easy assembly and dismantlement
It is of "toy bricks" design,with standard parts. No assembling tools should be needed. An aerial platform of 20M will be assembled by two persons within a short time.
4.Easy transit
It has castors so that it can be moved and locked easily and work at different place.
5.High applicability
It is allowed to be erected on escalators and stairways. And the castors prevent any damage on the marble or wood floor and the lawn. And it is designed for use in confined spaces such as narrow alleyways and corridors. And it can be assembled in many ways.
6.Flexible assembly
It can be designed and assembled according to any operation request of any special maintenance in all working sites.
7.Rust-proof,Corrosion- proof,Maintenance-free
All parts of the ladderspan are anti-oxygenation, with interlocks made by casting of spray pellet, which provides itself a lifespan of 30 years more.
Measurements :1300*2000*10000mm with uprightness ladder
Certificate : TUV ISO 9000
Packing : Standard Export packing by carton
Delivery day : 7 days
- Q: March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
- Quantitative analysis of the problems in safety construction. In order to solve this problem, you must first understand the specification. However, the specification is not enough, not only to understand the safety load of scaffolding. Please forgive me, I am not here, in the past, it is too much trouble. In this process, the construction specification is calculated. Technical specification for safety of fastener type steel pipe scaffold (JGJ130-2001)
- Q: Construction of the project more than the number of layers must be used construction elevator
- The outer scaffolding is a scaffolding that is erected outside the fa?ade
- Q: Wanzhou District housing notarized brick structure is how much money per square meter
- Is the set of quotas, there will be poor material adjustment. Now this process is generally not set quota. Both sides follow the market to discuss the price
- Q: Construction safety management system should be clearly defined what the content
- We first come to understand what is the scaffolding is what
- Q: I am in urgent need of emergency contingency plans I am very anxious ah
- You can go to the MG flagship store inside to see, the general flagship store are authentic, the product itself is why people own production
- Q: The basic form of the outer scaffolding is filled in
- Hello's ① China Knowledge Network Ye Hao, Wanfang data Ye Hao have examples
- Q: Construction safety inspection score summary of the supervision unit, construction unit inspection opinions how to fill?
- Safety and civilized construction measures include: First, the safety of production . the preparation of safety information, security warning signs of the purchase and promotion of the column set; . "Sambo", "four", "five edge" . the crane, tower crane and other lifting equipment (including derrick, mast) and external safety precautions (including warning signs) costs, including the safety of electricity, including electrical safety standards, electrical protection devices, . the construction site lifting machinery inspection and testing costs; . the construction machinery fence and its fence safety protection facilities costs; . the construction site of the construction site, . fire facilities and fire equipment configuration costs; . electrical protection, safety lighting facilities; . other security measures costs. the cost of security equipment, Second, the fence of the wall beautification (including inside and outside the paint, brush white, slogans, etc.), pressure top decoration costs; on-site toilet slotted white, the user's badge, . on-site living facilities costs; meet the health requirements of drinking water equipment, shower, disinfection, etc.), the cost of the construction of the temporary facilities, . the construction site operating site of the hardening costs; . the source of pollution control, construction waste and garbage clean-up Sinotrans, site drainage and sewage treatment measures, the use of clean fuel costs; anti-gas poisoning, anti-mosquito bites and other measures; . the scene with medical and health care equipment, the cost of goods and emergency personnel training costs; . for the field of workers, the cost of food safety equipment, the cost of food safety equipment, Summer cooling costs, electric fans, air conditioning and other equipment and electricity costs; . the scene Construction machinery and equipment to prevent noise, anti-people measures measures; . other civilized construction measures costs.
- Q: Construction safety inspection standards (JGJ59-2011) a total of several inspection items, respectively, what
- The actual score of each item in the checklist should be calculated as follows: A1 = B * C / 100 where: A1 - the summary table is the actual score of the sub-item; B- Full score; C-check the score score.
- Q: Hello, can you send me an electronic version of the current building code? Thank you, email
- What is the difference between a flexible pipe and a rigid pipe? What types of pipes are used for drainage pipes, heat pipes and gas pipelines?
- Q: What are the contents of the safety and civilized construction measures?
- Polystyrene chemical stability is poor, can be a variety of organic solvents (such as: aromatic hydrocarbons, halogenated hydrocarbons, etc.) dissolved, will be strong acid and alkali corrosion, non-oil, in the ultraviolet light after the color change. Burning will produce a lot of carbon monoxide or carbon dioxide, pay attention to prevent poisoning
Send your message to us
Aluminum Scaffolding Tower System
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords