Tower Crane TC7050 Construction Machiney and Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Introduction:
Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.
Features:
1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
5. This Tower Crane equipped with hydraulic lifting and connecting. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.
6. Frequency control, variable speed, smoothness and high stability, non-striking.
7. Three-speed change pole motor, simple in structure, economical ,fitting.
The advantages of our company's products
1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary/Travelling, external/ internal climbing tower crane
4. Impeller blasting/rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper.
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
10. For warranty, it is 12 months from the B/L date.What's more, some free easy worn spare parts are provided together with the crane.
Specifications:
- Q: Hello,I live in the St. Louis area of Missouri and during the summer, Crane Flies (I call them Mosquito Eaters) fly around all the time at night. I believe that it is normal for this type of bug to be nocturnal, but lately, I've seen them flying around, jumping around, and getting in the house DURING THE DAYTIME!! (AHH!!) :0 Is there any explanation for this? If so, is there anyway to reduce their population in and around my house? Thanks for reading.Ty
- Then there must have been alot of insects in your house recently? Because it's summer time and things grow and reproduce at this time of the year
- Q: Okay, like a week ago I caught a daddy long legs (a crane fly) in my room with a mug and an envelope and I just left it there, when I removed it there were loads of little black dots on the envelope, I didn't really think about it cos I figured it was the coffee that was inside the mug or something. I got rid of most of them but didn't go out of the way if you know what I mean... And now there are loads of TINY little flies in my room. Could these be baby crane flies? Or something else? And if so how the hell do I get rid of them before they get huge and start reproducing all over again?!
- Crane flies reproduce in summer, but the eggs take 2-3 weeks to hatch, not to mention the time they spend as larvae, so if you caught it last week it doesn't sound like that would be the case. I would call an exterminator to get their opinion.
- Q: I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
- Most cranes use hydraulic lift. But lets say they are building a sky scraper the size of the dubai tower. They set a hydraulic lift crane to a certain point and lift components for another crane up. They then use that crane based at ground level to lift up parts. the other crane is based in the elevator shaft and they can set that crane up as high as they need.
- Q: How about the installation and disassembly of the tower cranes?
- Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
- Q: Notice of tower crane
- Please refer to the technical regulations for the safety of installation, disassembly and use of tower cranes in construction;The following is copy:3 installation of tower cranes3.1 conditions for installation of tower cranes3.1.1 tower crane installation unit must have the construction administrative departments issued the contracted professional qualification and heavy equipment installation engineering construction enterprises safety production license. Tower crane installation units must be engaged in the installation of tower cranes within the scope of qualification permit.In addition to the professional and technical personnel who have the qualification standard, the installation units of 3.1.2 tower cranes shall also have professional personnel who are in line with the project. The person in charge of the project, the project manager and the full-time safety management personnel shall have the certificate of safety production inspection. Tower cranes, installers, electricians, drivers, signal engineers, cable operators should have special construction operation qualification certificates.3.1.3 construction units shall sign professional contract for installation engineering with the installation units, and make clear the responsibility of both sides for safety in production. In case of general contracting of construction, it shall be signed by the general contractor and the installation unit.
- Q: Absolutely bs. I hope a crane falls on ALL these effin construction workers and their families and the building executives' heads. Let THEM have family members die or get hurt from these accidents - then they will get what's coming to them. They should all burn in hell. Total greed total total greed. They will pay
- Something needs to be done quick because it was the second deadly crane accident in 2 1/2 months in the city............
- Q: What other actress of the 1960s who could have done the role of Marion Crane in Psycho,in place of Janet Leigh and give result too?I think she perfect.
- Believe it or not? Alfred Hitchcock had thought Vera Miles would have been good in that role. He had one of his mini-crushes on Vera, and had planned to make her a superstar. However, he lost patience when Vera decided to enjoy her married life and have babies. Vera had no burning desire to become a superstar, and was happy with the work she was doing. She was also very smart in another way. She said that those parts worked out well for the blonde, sexy women that played them, but that just wasn't her look or her approach to acting. Vera Miles was in the movie Psycho, but she played the part of Marion Crane's sister. I've always thought that Janet Leigh was perfect in that role. She was so beautiful and unbelievably sexy that when she was on the screen? You couldn't stop watching her. Her ample bosom was an attention-getter all by itself. No offense to Janet Leigh, but I don't know if anyone cared if she could act or not! However, she did a fine job in Psycho.
- Q: how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q: I've recently finished folding my 1000 paper cranes. I herd that there is a shrine in japan that takes them. Anybody know where that place is and the information I need to have to send them?
- my daughter's artwork club did this for a scientific institution to no longer previously...they made 1300 paper cranes and hung them from the ceiling in between the scientific institution wings. i don't comprehend approximately being granted one desire, yet it made the sufferers chuffed and smile no count how ill they have been. i've got heard the paper crane develop into some how related with leukemia, so she made one for a chum of mine's son (he's purely 7 and has battled this ailment for 2 years) and it made him chuffed to comprehend that somebody who does not comprehend him could make something like that for him.
- Q: What are the types of cranes?
- Two, crane according to the structure is divided into bridge crane and jib crane two categories. (1) traffic, metallurgy specialcrane and Longmen crane, cable crane is a crane (2) portal crane, tower crane, truck crane, crawler cranes, truck cranes, cantilever crane is a crane arm.
Send your message to us
Tower Crane TC7050 Construction Machiney and Equipment
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 15 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords