Introduction:
Tower Crane is a machinery used for vertical lifting and horizontal delivering of building materials and any other heavy items during construction process. It can lift and lay down, horizontally shift, and rotate, so the working range is very large. The whole body can be fixed or movable.
Features:
1. It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,
5. This Tower Crane equipped with hydraulic lifting and connecting. The height can accordign to the actual height of the building and at the same time unchange the lifting capacity.
6. Frequency control, variable speed, smoothness and high stability, non-striking.
7. Three-speed change pole motor, simple in structure, economical ,fitting.
Specifications:
- Q: the lenght of beam is 4.5mmaterial of beam is ASTM Gr60
- difficult question
- Q: What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
- 1. Tower crane consists of three parts: metal structure, working mechanism and electrical system. The three main technical parameters are lifting moment, lifting weight and working speed. Lifting moment refers to the boom as the basic arm length maximum amplitude corresponding to the rated lifting weight of product, product or maximum weight with the corresponding inflection point.
- Q: how to do tower crane maintenance?
- Tower cranes in construction is being inspected as part of everyday maintenance. Usually, Safety In charge or a mechanical engineer do the inspection on site. Some pointers for inspection are: 1. Machine checking including motor 2. Emergency break 3. Lifting cable checking 4. Power panel 5. others Not only the tower crane is being checked, the operator and rigger also attends daily safety toolbox to update themselves on daily safety hazards on site
- Q: How to build a strong paper crane?
- Fact: paper is relatively strong when you pull on it, but when you push on it, it easily crumples. Build your crane out of several bars. Bars that are being pushed upon by the weight need to resist the crumpling. A good way to do this is to roll a sheet of paper into a tube form to make the bars. Bars that are only being pulled on don't need to be more than a sheet of paper. A frame cranes are simple to make: www.lni.wa /wisha/rules/generalsafety/images/24_d2_a-frame.gif
- Q: I was given a CCRadio and I have no idea what it is or what it does.The guy that gave it to me says it's an Awesome DXing radio (whatever that means). The display doesn't work but other than that the radio works fine and pulls in alot of stations the previous owner said. Can anyone help me understand what a CCRadio is and what it does? Thanks to all that contribute.
- Hard to say much about it without knowing the model #. DX = distance in radio parlance.
- Q: I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
- They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
- Q: I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
- Please, tell me the name of the school, the teacher, and the address. Is it the Taiwanese or the Yong Chun from the Mainland? I guess you are in the UK. There is great White Crane out there. I study Yong Chun White Crane in the US and I like to know and learn about all the lineages of any of my arts.
- Q: These cranes always stay higher than the construction process but I have never seen how they are extended to stay above all of it. They come in two formats, free standing and those attached to the building. The possibilities that I thought of was that maybe they use another crane to lift the housing and the horisontal arm to put in more modules into the vertical part; or that they extend it by some way by putting modules in at the top or bottom and that the crane has some self-lifting mechanism to accommodate the insertion of more modules. However, I have never seen this being done, nor does the construction of these cranes point to its ability to do so. The only other possibility that I could think of was that the crane is set up at the outset to be higher than the completed height of the building, hence there is no need to extend it but this does not explain how they do it for very high buildings where the crane is attached to the building and seems to grow higher with the building.
- In very tall buildings the tower crane's vertical frame usually sits in an elevator shaft. Initially it sits on its own base but as the building gets higher the crane is lifted using hydraulic jacks locked into the floor or floors above as they are completed. The construction of these cranes is rather ingenious in that they can dismantle themselves and the respective components lowered to the ground.
- Q: What kind of personnel should be installed for the tower crane installation and disassembly?
- According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;
- Q: will give you a wishor help your marraige succeedjust curious as to peoples thoughts?thanks lt;3 abby
- no ive made more then that before and nothing happened to me
Send your message to us
Tower Crane CMAX TC7050 Construction Machiney
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 20 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords